- 116: Site_visit, Site 4, Mon 13-Oct-2003 17:05:03 EDT, St4: cleaned cruddy krypton, routine
10/13/03 13:00-14:15 local
Purpose: the krypton voltage was reading essentially zero.
Downloaded SDR, METPPF (256 MB installed)
KrH20 = 12mv. Mast lowered Kr cleaned (NB lots of spider webs)
Improved to 540mv
Cleaned radiometers
RG OK
Soil sample 3cm - 6 cm taken
Trime 22.0, 21.9, 21.7; 22.8, 22.7, 22.9
Boom angles shot with Datascope, with Mag.Dev=14degW (confirmed w/gps)
RMY boom = 359 degrees, Sonic boom = 92 degrees
- 108: Site_visit, Site 4, Wed 08-Oct-2003 15:56:09 EDT, Site 4 visit, Oct 8
Site 4 visit, Oct 8, Kyle
Arrived 1140 EDT
1155 mast down
cleaned Krypton 286-354mV
1159 mast up
1237 TRIME 17.0,19.1,16.5%
soil core taken
cleaned rads
copy metppf
grabbed SDR
1245 leaving
- 93: Site_visit, Site 4, Sat 04-Oct-2003 10:43:20 EDT, Site 4 visit, Oct 3
Site 4 visit, Oct 3, SPO, KDH, & Sakai
Arrived 1152 EDT
Started rain 53 -> rebooted in middle, try again.
copy metppf
changed format form 161 to 163, reboot
cleaned rad
1321 restarted rain 21 -> oops, cleaned out clog
1326 restarted rain again 23 -> 124
1327 ubaro turned on
1333 TRIME: 31.5, 27.3, 28.8%
1341 rain done, Grabbed SDR, and left
- 80: Site_visit, Site 4, Mon 29-Sep-2003 18:06:01 EDT, Site 4 visit, Sept 29
Site 4 visit, Sept 29, SPO & KDH
Arrived 1407 EDT; thunderstorm approached, visited, dumped hail at end!
PDA didn't work -- fuse blown on console port?? (didn't fix)
Cleaned krypton ??mV -> 420
Mast down 1418->1423
Grabbed SDR.
Copied metppf
1428: Trime: 30.6; 23.6; 27.5%
1428: took core
Cleaned rad
Unclogged rain gauge using grass stalk.
Rain gauge calibration started ~1417, aborted 1434 as storm hit
GARMIN: 42deg 08.887'N; 73deg 45.097'W; 94m (acc 19ft)
1440 left site
- 66: Site_visit, Site 4, Thu 25-Sep-2003 16:39:58 EDT, Site 4 visit, Sept 24
Site 4 visit, Sept 24, SPO and Tom
Arrived 1310 EDT, left 1350
No metppf files after metppf.264
Downloaded metppf files (such as were available) and swapped fastout media
Soil sample at 1315 EDT
Trime = 17.7% at 1328 EDT
28.4%
20.6%
Cleaned radiometers at 1333; SPO: spider near LiCor
kh2o s/n 1390; output = 333 mV
mast lowered at 1335 EDT, raised 1343 EDT
cleaned kh2o, output = 426 mV
downloaded kry1390s to EVE and /card
- 46: Site_visit, Site 4, Thu 18-Sep-2003 08:50:05 EDT, Site 4 visit, Sept 17
Visit to Site 4, Sept 17; Kurt and Tom
Arrived 1145 EDT; left 1235 EDT
Lowered mast 1158 EDT; raised mast 1212 EDT
KH2O output = 219 mV; cleaned; output = 289 mV
Collected soil sample (3-6 cm) @ 1625 GMT; Trime = 20.0 vol%
Cleaned radiometers
Downloaded data
- 38: Site_visit, Site 4, Mon 15-Sep-2003 15:17:20 EDT, Site 4 visit, Sept 13
Visit to station 4; Kurt and Tom
Lowered mast 1530 EDT
Raised mast 1537 EDT
KH2O output = 41 mV; cleaned; output = 158 mV
RMY BoomDirection = 357 deg
CSAT s/n = 0674
I suppose we downloaded data as well,
but forgot to make a note of it!
- 32: Site_visit, Site 4, Fri 12-Sep-2003 16:23:58 EDT, Visit: uploaded data
9/11/03 22Z
metppf / SDR data uploaded.
- 18: Loggers, Site 4, Mon 11-Aug-2003 14:53:46 MDT, Site 4 CR10X calibration file
Q94197-A+ NET 00 9
A- x 01 11.22
x PygIn 02 0.0
x PygOut 03 0.0
x PspIn 04 0.0
x Psput 05 0.0
H993562 HFT 06 37.3
PY7122 SlDn 07 -103.9
Tcin-A0 x 10 0.0
A1 x 11 0.0
A2 x 12 0.0
A3 x 13 0.0
A4 x 14 0.0
Tdin-A0 x 15 0.0
A1 x 16 0.0
A2 x 17 0.0
A3 x 18 0.0
A4 x 19 0.0
Tcot-A0 x 20 0.0
A1 x 21 0.0
A2 x 22 0.0
A3 x 23 0.0
A4 x 24 0.0
Tdot-A0 x 25 0.0
A1 x 26 0.0
A2 x 27 0.0
A3 x 28 0.0
A4 x 29 0.0
NCAR004-A0 Tsoil 30 -248.791171
A1 x 31 245.26497
A2 x 32 4.141065
x-A0 LevelX 33 0.0
A1 x 34 0.0
A2 x 35 0.0
A3 x 36 0.0
A4 x 37 0.0
A5 x 38 0.0
x-A0 LevelY 39 0.0
A1 x 40 0.0
A2 x 41 0.0
A3 x 42 0.0
A4 x 43 0.0
A5 x 44 0.0
011-A0 CS615 45 -.187
A1 x 46 .037
A2 x 47 .335
TP01 timeout 50 180
levels x 98 0
baud x 99 1