26 | Sat 06-Jun-1992 | Conditional Sampler installed on 250m f | none | acd
|
36 | Sat 06-Jun-1992 | TIME DELAY FOR CONDITIONAL SAMPLER | none | acd
|
54 | Mon 08-Jun-1992 | 7 June conditional samples. | none | acd
|
59 | Mon 08-Jun-1992 | CONDITIONAL SAMPLE FORM:wq | none | acd
|
60 | Mon 08-Jun-1992 | Conditional samples settings. | none | Operator
|
67 | Tue 09-Jun-1992 | Conditional sampler tests | none | acd
|
80 | Wed 10-Jun-1992 | Conditional sampler ran overnight | none | acd
|
84 | Wed 10-Jun-1992 | Flow tests of Cnditional Sampler | none | acd
|
88 | Thu 11-Jun-1992 | The conitional sampler ran all night. | none | acd
|
92 | Thu 11-Jun-1992 | Proceedure for SF6 analysis | none | acd
|
97 | Sat 13-Jun-1992 | Conditional sampler after the rain | none | acd
|
100 | Sat 13-Jun-1992 | Conditional Sampler delay time | none | acd
|
105 | Sun 14-Jun-1992 | Removal of the Conditional Sampler | none | acd
|
106 | Sun 14-Jun-1992 | June 11 conditional samples | none | acd
|
137 | Tue 23-Jun-1992 | Pumped down bags in conditional sampler | none | twh
|
138 | Tue 23-Jun-1992 | Cyclic test restarted | none | gdm
|
140 | Wed 24-Jun-1992 | Conditional sampler test | none | gdm
|
143 | Wed 24-Jun-1992 | Changed cond_samp calibration and confi | none | gdm
|
149 | Thu 25-Jun-1992 | June 25 threshold=0 and bag leak tests | none | gdm
|
150 | Fri 26-Jun-1992 | June 26 conditional samples | none | gdm
|
153 | Sat 27-Jun-1992 | June 27 conditional samples | none | gdm
|
159 | Mon 29-Jun-1992 | June 27 cond samp span gas test | none | gdm
|
- 26: CONDSAMP , Site none, Sat 06-Jun-1992 02:28:19 GMT, Conditional Sampler installed on 250m f
Conditional Sampler installed on 250m flux tower
All cabling and tubing attached and equipment installed this
afternoon between 15:00 and 19:30.
Power not yet applied to 12vdc plug, ? power on serial cable?
Tomorrow will do time delay testing using Brians fast SF6
Steve O says in SJVAQS used threshhold = 15 cm s-1 in daytime
5 cm s-1 at nighttime.
Tom's dictum threshhold = 0.6 sigma w
Maybe 0.5 (sqrt ww) = 0.5 (sqrt sigma w)
- 36: CONDSAMP , Site none, Sat 06-Jun-1992 23:43:29 GMT, TIME DELAY FOR CONDITIONAL SAMPLER
Flow time delay testing for conditional sampler.
Saturday morning the conditional sampler was powered up and
"rserial" adressed vi the Toshiba as cosmos 201.
The system checked out and was tested for time delay
using the fast SF6 sensor.
The 1/8 inch swage was disconnected from the bulkhead on
the inside of the case for the A or down or v3.
The 1/8 inch line could be T'ed into the inlet of the analyser.
The SF6 fast calibration solenoid could be T'ed into the intake.
The SF6 mode indicator was modified to be a fast channel
Five runs were made with the SF6 directly into the analyser
and five runs with the SF6 flowing first through the
conditional sampler.
The difference between the time delays was derived to give
the conditional sampler delay.
Time for flow through SF6 analyser
10.74
10.75
10.77
10.74
10.77
-------
10.75 +_ 0.014
Time for flow through coditional sampler and SF6 analyser
10.98
11.06
10.96
11.09
10.98
-----
11.01 +_ 0.057
Conditional sampler delay = 0.26 +_ 0.06
use the value 0.3 seconds
The 1/4 inch teflon lines labels were checked by disconnecting
from the CSBox blowing into them and emersion of the other ends
in a water glass.
Conditional Sampler Box
C B A
up down intake
| | |
| | |
| | |
| | |
C B A
Tubeend Tubeend Tubeend
- 54: CONDSAMP , Site none, Mon 08-Jun-1992 02:07:02 GMT, 7 June conditional samples.
7 June conditional samples.
Date: 7 June 92.
Delay = 30, threshold = 5 cm s-1
Syringe samples analysed the following day
Calibration for the SF6 gc 950,000 counts = 312 pptv
Start time Stop time Consam outlet Box/bag Syringe Pumpdown Counts [SF6]
16:40 17:30 A left D I cs1 ~6 sec 181684 59.7
B center D II cs2 ~6 sec 165647 54.4
c right D III cs3 ~6 sec 202547 66.5
Start time Stop time Consam outlet Box/bag Syringe Pumpdown Counts [SF6]
17:30 18:30 A left B I cs4 ~4 sec 466329 153
B center B II cs5 ~4 sec 409573 135
c right B III cs6 ~4 sec 507517 167
Start time Stop time Consam outlet Box/bag Syringe Pumpdown Counts [SF6]
18:30 19:30 A left D 1 cs7 ~5 sec 432584 142
B center D II cs8 ~5 sec 607286 199
c right D III cs9 ~5 sec 519747 171
Start time Stop time Consam outlet Box/bag Syringe Pumpdown Counts [SF6]
19:30 20:30 A left B I cs10 ~3 sec 547942 180
B center B II cs11 ~4 sec 609760 200
c right B III cs12 ~3 sec 498822 164
Start time Stop time Consam outlet Box/bag Syringe Pumpdown Counts [SF6]
20:30 21:30 A left D I cs13 ~ sec 671772 221
B center D II cs14 ~ sec 743783 244
c right D III cs15 ~ sec 738946 243
Only very small volumes were collected in the bags.
Center bag had to be repumped down before collecting samples.
After syringe samples taken bags not pumped down.
Pump left running overnight.
- 59: CONDSAMP , Site none, Mon 08-Jun-1992 16:18:00 GMT, CONDITIONAL SAMPLE FORM:wq
June conditional samples.
Date: June 92.
Delay = , threshold =
GC cal 950000 = 312 ppbv
Start time Stop time CS outlet Box/bag Syringe Pumpdown Counts [SF6]
: : A left I cs l ppbv
B center II cs l ppbv
c right III cs l ppbv
Start time Stop time CS outlet Box/bag Syringe Pumpdown Counts [SF6]
: : A left I cs l ppbv
B center II cs l ppbv
c right III cs l ppbv
Start time Stop time CS outlet Box/bag Syringe Pumpdown Counts [SF6]
: : A left I cs l ppbv
B center II cs l ppbv
c right III cs l ppbv
Start time Stop time CS outlet Box/bag Syringe Pumpdown Counts [SF6]
: : A left I cs l ppbv
B center II cs l ppbv
c right III cs l ppbv
Start time Stop time CS outlet Box/bag Syringe Pumpdown Counts [SF6]
: : A left I cs l ppbv
B center II cs l ppbv
c right III cs l ppbv
- 60: CONDSAMP , Site none, Mon 08-Jun-1992 17:11:10 GMT, Conditional samples settings.
Conditional samples settings.
According ti Steve O:
The "sample" for delay corresponds to 0.1 seconds. Hence
y1 generates a delay time of 0.1 seconds. As we determined
that the appropriate flow delay was 0.26 seconds we should
use a value of y3 = 0.3 seconds.
The "sample" for valve cycling time is different. It corresponds
to 0.001 seconds. Hence c1000 will activate each valve
for 1 second and the entire sequence of the three valve sampling
sequentially will take three seconds.
Although in FOOTPRINT92 often ww = 0.6(m.s-1)^2
sigmaw = .77m.s-1
1/2 sigma w = 0.38m.s-1 = 38cm.s-1
Steve believes we should be more conservative and use t20 = 20 cm.s-1
or t30 = 30cm.s-1
- 67: CONDSAMP , Site none, Tue 09-Jun-1992 01:39:07 GMT, Conditional sampler tests
Conditional sampler tests
The difficulty with the conditional sampling of
sunday evening was that there was a very low flow.
This indicated that possibly the cs was not functioning properly.
Nevertheless the syringes were all analysed (consam 1 through consam15)
The results are entered in the previous note.
With the cs up on the tower and the 1/8 inlet no flow
The cs was lowered and the flow checked.
Connectors rechecked
With a 1 sec cycle and the 1/8 tubing inlet 0.7 lpm through a single tube.
With a 1 sec cycle and the 1/4 tubing inlet 1.7 lpm through a single tube.
With a 1 sec cycle and the inlet inadvertantly removed
0.13 lpm through a single tube.
The cs was taken into the workshop and the pump inlet reinstalled
The cs was run from 14:50 to 15:20 = 1.5 hrs and the air then pumped out
through the gas meter
I 11.5 liters
II 7.5? liters
III 10.5 liters
The cs was then set going on the chem shelter.
shows t15 = threshold = 15 cm s-1, y3 = delay = 0.3 secs
then g, then p = pump on.
Bubble testing showed the cs to be operating well.
- 80: CONDSAMP , Site none, Wed 10-Jun-1992 17:41:13 GMT, Conditional sampler ran overnight
Conditional sampler ran overnight
On Tuesday afternoon the CS indicated that valve B was stuck open.
The CS was taken down and into the chem trailer.
Valve B was replaced with the spare.
The valves were all exercised, 12 vdc levels checked.
The ss relays were all exercised with 5vdc
It was decided to provide separate 12 vdc from the serial
cable for the board and leave the valves and pump on the separate
12 vdc supply.
The CS was reconnected and hoiste to the 5m level. It was initiated
checked and left running . It ran overnight and at 08:00 was bubble checked.
Later in the morning flow was measured throuh the lines.
Line A:
18 min = 2.4 l, 0.14 lpm,
42 min = 5.4 l, 0.13 lpm, equivalent to 7.8 l per hour.
Line C:
48 min = 5.4 l, 0.11 lpm, equivalent to 6.6 l per hour.
Line B:
112 min = 9.0 l, 0.08 lpm, equivalent to 4.8 l per hour
NB the low threshold should ensure A and C > B
Also A and C were measured at different times.
- 84: CONDSAMP , Site none, Wed 10-Jun-1992 23:55:17 GMT, Flow tests of Cnditional Sampler
Flow tests of Cnditional Sampler
The CS is fully operational and it has been decided to
let it run continuously.
The line ends with bayonet fittings are normally kept
in a loosely fastened plastic bag to allow venting.
A test of the flow:
At 14:25 start
A -> I
B -> II
C -> III allin box D
At 16:25 stop and pump out each bag through the pump and the meter.
I contained 16.9 l
II contained 10.5 l
III contained 12.5 l
I am not sure why A and C were different.
- 88: CONDSAMP , Site none, Thu 11-Jun-1992 16:57:00 GMT, The conitional sampler ran all night.
The conitional sampler ran all night.
A bubble test on the CS showed that it was still operating this morning.
Possibly it will be used to collect hydrocarbons for Hal to analyse.
- 92: CONDSAMP , Site none, Thu 11-Jun-1992 23:08:53 GMT, Proceedure for SF6 analysis
Proceedure for SF6 analysis
With the GC running;
Touch LIST then ZERO if the print out is between 0 and 100 then proceed,
if not adjust zero pot.
Attach syringe and inject half of contents.
Wait 5 seconds for pressure transients to fade then move lever LOAD -> INJECT
Immediately touch START
The GC with output the trace showing the SF6 peak then the O2 peak.
When the O2 peak begins remove syringe and move lever INJECT -> LOAD
Wait two and a half minutes and the integrator will output results. The
SF6 is the RT = 0.25
Repeat
- 97: CONDSAMP , Site none, Sat 13-Jun-1992 15:20:48 GMT, Conditional sampler after the rain
Conditional sampler after the rain
On Friday during the rain a check of the CS indicated that in the run mode
only line C was delivering sample.
The system was restarted and a flow check indicated that B and C
were delivering sample air.
C gave 17.5l, B gave 3.5l and A gave 0.25l.
The situation persisted overnight.
This morning at 08:00 the flow was checked and the power was recycled both
to the board (unplug/replug the serial cable) and
the pump and valves (unplug/replug the dc cable).
The flow was then checked by connection into the bags.
C gave 8l, B gave 3.5l and A gave 0.15l.
The CS was brought down the tower and into the trailer.
Although the box was shut tight there was water inside.
The water was dried and the box sat atop the dirt oven for several hours.
The dried out CS was recabled at the bottom of the tower and a bag test run
16:30 -> 16:35
A gave 0.2l, B gave 4.1l, and C gave 6.1l.
- 100: CONDSAMP , Site none, Sat 13-Jun-1992 18:22:18 GMT, Conditional Sampler delay time
Conditional Sampler delay time
On Thursday delay tests were run for the SF6 analysers with their
intake lines. As part of this proceedure the Conditonal Sampler
delay was redetermined. This was necessary because the cs 1/8
intake has been replaced with a 1/4 teflon tube.
Five tests were run for the analyser alone and five tests were run
with the outlet of valve 3 feeding into a T at the analyser intlet.
The SF6 cal solenoid was held at the CS intake.
Analyser + conditional sampler delay = 9.062 +_ 0.044s
Analyser delay = 8.406 +_ 0.023s
Coditional sampler delay = 0.656 s
- 105: CONDSAMP , Site none, Sun 14-Jun-1992 00:37:26 GMT, Removal of the Conditional Sampler
Removal of the Conditional Sampler
As the bag tests showed that the CS was still not functioning properly
it was removed from the tower to be rechipped in Boulder.
The umbilical was coiled in one of the blue boxes.
- 106: CONDSAMP , Site none, Sun 14-Jun-1992 00:49:25 GMT, June 11 conditional samples
June 11 conditional samples
Date: 11 June 92.
Delay = .3s , threshold = 15 cm s-1
GC cal 1,018,768 = 312 ppbv
921,335
Start time Stop time CS outlet Box/bag Syringe Pumpdown Counts [SF6]
10:07 10:38 A left I cs 4.2l 17,818, ppbv
B center D II cs 4.1l 71,116, 66,806 ppbv
c right III cs 3.5l 39,858, 47,588 ppbv
- 137: CONDSAMP , Site none, Tue 23-Jun-1992 18:48:21 GMT, Pumped down bags in conditional sampler
Pumped down bags in conditional sampler box
B around 18:30 today and got ~ 0.3, 1.55, 0.45
liters from bags I to III. Since Gordon had
pumped these down about 24 hours ago, it appears
that they are leaking.
I took box A out to the 250m tower and its bags
had very little volume. Attached box A to the
conditional sampler and Gordon began a cylic
test at 11:49 am PDT.
- 138: CONDSAMP , Site none, Tue 23-Jun-1992 20:28:46 GMT, Cyclic test restarted
Cyclic test restarted
Previous cyclic test of conditional sampler failed, because
the pump was not on while the valves cycled. The correct
sequence of commands is: "p" (turn pump on) and then "cN", and
not "cN" then "p", since the "p" disables the valve cycling.
Started a cyclic test at 13:14 PDT, with a 100ms cycle period
(command "c10") to bags in box A.
Results:
Bag A: 6.4 l
Bag B: 6.5 l
Bag C: 6.0 l
These look good, so we'll use box A.
- 140: CONDSAMP , Site none, Wed 24-Jun-1992 03:50:26 GMT, Conditional sampler test
Conditional sampler test
Ran test of conditional sampler with threshold set to 0. Expect
equal volumes of air in the up bag (A) and the down bag(C).
Started test at 17:13 PDT. Ended test at 17:56PDT.
Results:
Bag A: 8.6 l
Bag B: .4 l
Bag C: 7.25 l
Air continued to run into bag A for a minute after the valves to the
others were closed, before the contents were measured, so the real reading
for A should be lower. The cond_samp command "S" stop does not turn
off the pump, one must also enter the "P" command.
- 143: CONDSAMP , Site none, Wed 24-Jun-1992 18:23:03 GMT, Changed cond_samp calibration and confi
Changed cond_samp calibration and configuration.
We now are only archiving threshold and status from the
conditional sampler, since the sonic data is a duplicate of
atiK.50.5m.
- 149: CONDSAMP , Site none, Thu 25-Jun-1992 23:26:45 GMT, June 25 threshold=0 and bag leak tests
June 25 threshold=0 and bag leak tests
Placed sampler on tower, with intake hose extended on the 5m sonic boom.
Set threshold to 0, hoses connected to box A. Started test at 17:05 PDT,
ended at 17:35 PDT.
Pumpdown volumes, box A:
Bag A: 7.1 l
B: .4
C: 6.9
Evacuated bags in Box D, left for 3 hours.
Pumpdown volumes, box D:
Bag A: .1 l
B: .4
C: 2.8 <- suspect bag
Evacuated bags in boxes A,C and D at 18:20PDT.
Started threshold=0 test to box A at 18:28PDT, ended at 19:04.
Pumpdown volumes, box A:
Bag A: 5.7 l
B: .4
C: 7.1
Pumped down boxes C and D at 19:10PDT to check for leaks:
Pumpdown volumes, box C:
Bag A: .1 l
B: .05
C: .05
Pumpdown volumes, box D:
Bag A: .05 l
B: 1.75 <- suspect bags.
C: 2.2
Started another threshold=0 test to box A at 19:07PDT, ended at 20:00
Pumpdown volumes, box A:
Bag A: 7.6 l
B: .4
C: 11.6
Again pumped down boxes C and D at 20:11PDT to check for leaks:
Pumpdown volumes, box C:
Bag A: .1 l
B: .1
C: .1
Pumpdown volumes, box D:
Bag A: .1 l
B: 1.4 <- suspect bags.
C: 2.0
We will not use box D (or B), and will alternate between A and C.
- 150: CONDSAMP , Site none, Fri 26-Jun-1992 05:09:08 GMT, June 26 conditional samples
June 26 conditional samples
Date: 26 June 92.
Delay = .7s, (7 samples) , threshold = 25 cm s-1
Start Stop CS out Bx/bag Syringe(s) Pump
03:32 04:32 A left I A01-03 6.9
B cntr A II B01-03 7.6
C right III C01-03 8.65
04:32 05:32 A left I A04-06 7.0
B cntr C II B04-06 .7
C right III C04-06 8.4
05:32 06:32 A left I A07-09 6.0
B cntr A II B07-09 8.4
C right III C07-09 8.2
Turned pump off at 06:32 then took samples. Winds died then came back.
Set threshold to 30cm/s, set valves to REVERSE. Start again at 07:32.
07:32 08:32 A left I A10 2.9
B center C II B10 0.6
C right III C10 1.4
Pumpdown vols are small. ?
08:32 09:32 A left I A11
B center A II B11
C right III C11
Span gas = 934ppt
--- Span gas Peak Height----- ---Peak Height--- ----- ppt ----------
Syr 1 2 3 mean s.d. A B C A B C A-C
1 825.3 823.0 822.5 823.6 .2% 470.0 479.7 456.0 533 544 517 16
2 822.1 824.1 822.5 822.9 .1% 473.2 466.2 320.9 537 259 364 173
3 821.3 817.0 817.0 818.4 .3% 457.8 438.5 456.7 522 500 521 1
4 821.9 820.7 819.1 820.6 .2% 402.4 435.0 425.1 458 495 484 -26
5 858.4 852.6 853.1 854.7 .4% 417.7 448.1 427.3 456 490 467 -11
6 824.8 820.6 818.4 821.3 .4% 421.7 447.6 432.0 480 509 491 -11
7 818.4 821.5 (814) 820.0 .3% 441.4 478.1 (410.2) 503 545 471a -42
8 875.7 869.9 867.1 870.9 .5% 458.5 511.2 452.3 492 548 485 7
9 865.6 863.5 863.8 864.3 .1% 474.4 488.2 451.7 513 528 488 25
10 823.2 822.2 820.7 822.0 .2% 509.0 268.5 518.0 578 305 589 -11
Period A B C A-C
03:32- mean 531 524 467 64
04:32 std 8 22 90
04:32- mean 465 498 481 -16
05:32 std 13 10 12
05:32- mean 503 540 481 22
06:32 std 11 11 9
07:32- mean 578 305 589 -11
08:32 std
Mean Span reproducibility .27%
- 153: CONDSAMP , Site none, Sat 27-Jun-1992 05:12:29 GMT, June 27 conditional samples
June 27 conditional samples
Date: 27 June 92.
Delay = .7s, (7 samples) , threshold = 30 cm s-1
GC cal
GMT
Start time Stop time CS outlet Box/bag Syringe Pumpdown
03:34 04:34 A left I A11-13 5.3 l
B center C II B11-13 .8
C right III C11-13 8.2
04:34 05:34 A left I A14-16 5.3
B center A II B14-16 9.5
C right III C14-16 7.4
05:34 06:34 A left I A17-19 4.6
B center C II B17-19 .7
C right III C17-19 8.4
06:34 07:34 A left I A20-22 5.1
B center A II B20-22 9.4
C right III C20-22 8.3
Turned pump off at 07:34, then took samples.
At 08:03 set valves to REVERSE, turned pump on.
08:03 09:03 A left I A23-25 7.5
B center C II B23-25 0.7
C right III C23-25 2.7
At 09:03 set threshold to 15cm/s, valves to REVERSE, turned pump on.
08:03-09:03 samples were spoiled, winds were bad anyway.
09:03 10:03 A left I A23-25
B center C II B23-25
C right III C23-25
Span gas = 934ppt
After syringes 11-13 and 20-22 Brian also ran a 1/2 span gas
through, by adding a syringe of ambient air to the intake before
running it through the GC.
mean
--- Span gas Peak Height----- ---Peak Height--- ----- ppt ----------
Syr 1 2 3 mean s.d. A B C A B C A-C
11 1445.9 1436.2 1434.9 1438.9 .4% 586.9 591.7 445 413 411 34 8%
12 744.9 773.2 736.8 692.9 637.7 663.8 1.5% 7.6% 5.9% 8%
13 678.8 683.5 642.6
14 1445.8 1443.1 1439.8 1442.9 .2% 766.4 748.6 722.5 496 492 471 25
15 774.1 737.5 734.2 1.0% 3.9% 0.8% 5%
16 758.6 793.6 728.4
17 1436.9 1435.4 1433.1 779.4 789.2 715.5 493 516 472 21
18 733.4 737.7 720.3 741.0 803.8 710.5 2.7% 1.1% 2.8% 4%
19 750.0 787.5 748.3
20 1425.9 1420.6 1421.4 1422.6 .2% 787.9 821.5 734.6 533 547 505 28
21 734.1 737.1 746.2 842.4 827.9 817.1 3.5% 1.7% 5.5% 5%
22 803.9 848.5 757.1
Period A B C A-C
03:34- mean
04:34 std
04:34- mean
05:34 std
05:34- mean
06:34 std
06:34- mean
07:34 std
08:03-
09:03
Mean Span reproducibility
- 159: CONDSAMP , Site none, Mon 29-Jun-1992 20:14:29 GMT, June 27 cond samp span gas test
June 27 cond samp span gas test
Ran span gas into conditional sampler, with valves in cycle mode,
and then checked samples from each bag.
First we checked the flow rate of the cond samp intake tube using an
Aalborg flow meter (Aalborg offset = .02 l/min):
V1 on sample, others vent: .98 - 1.01 l/min
V2 on sample, others vent: .98 - 1.01
V3 on sample, others vent: .98 - 1.01
All vent 1.08 - 1.11
Out of curiousity I loosened the lid on the cond samp weather box
and ran the same flow rate test:
V1 on sample, others vent: 1.05 - 1.08 l/min
V2 on sample, others vent: 1.02 - 1.03 l/min
V3 on sample, others vent: .97 - .99 l/min
Since the valves vent into the box, the box lid should not be airtight
but it does not make a large difference in the flow rate.
Span gas test
Valves set to cycle every 100ms (command: "c10"). Started at 15:20
to Box C. The hose from the span gas cylinder and the cond samp intake
hose were placed side by side inside a 30cc syringe. The span gas
was released into the syringe at 1.42 l/min which should insure that the
cond samp is receiving pure span gas.
Lid on cond samp weather box was loosened at 15:33. Test was ended (pump
turned off) at 16:20:30 PDT.
We then took 5 syringe samples from each bag and ran these through the GC.
Pumpdown quantities:
Bag A: 7.4 l
B: 1.0
C: 7.2 These look like a threshold=0 test, but it was
a cycle test! Something's wrong here.
GC analysis
Peak Height
Bag A ----- Span Gas ------
1159730 1137261 1133550 1134277
1188152 1170249 1169303 1175161
1215382 1231678 1090697 1234317
1285267 1292499 1290247 1292120
1278596 1292499 1290247 1292120
Peak Height
Bag B ----- Span Gas ------
1028074 1053394 1050604 1050782
1016774 1078084 1081005 1081714
1049727 1099325 1096686 1064540
1025307 1023500 1022210 1021242
1007510 1011414 1026673 1006645
Peak Height
Bag C ----- Span Gas ------
917762 990250 988549 983021
915209 979208 966385 969353
905464 972236 974525 979244
908333 970562 973547 975259
920297 1009763 1011023 1009422
896423 1006444 1005343 1008022
Summary of calibration test:
SF6 calibration gas input to conditional sampler in cylic mode.
Each row below represents the analysis of one syringe sample from
the appropriate bag (A,B,C), followed by three syringe samples
directly from the calibration gas. The output is the mean and %
standard deviation of the three direct samples, followed by the
ratio of the bag sample to the mean of the three cal gas samples.
> fun.sf6.caltest("projects/FOOTPRINT92/results/condsam/caltest.jd179.A")
1135029 0.2 1.02
1171571 0.3 1.01
1185564 6.9 1.03
1291622 0.1 1.00
1291622 0.1 0.99
> fun.sf6.caltest("projects/FOOTPRINT92/results/condsam/caltest.jd179.B")
1051593 0.1 0.98
1080268 0.2 0.94
1086850 1.8 0.97
1022317 0.1 1.00
1014911 1.0 0.99
> fun.sf6.caltest("projects/FOOTPRINT92/results/condsam/caltest.jd179.C")
987273 0.4 0.93
971649 0.7 0.94
975335 0.4 0.93
973123 0.2 0.93
1010069 0.1 0.91