FOOTPRINT92: Logbook Entries

FOOTPRINT92: BUGFLUX Messages: 4 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
41 Sun 07-Jun-1992BIOFLUX SAMPLE TIME/COMMENTS noneacd
55 Mon 08-Jun-1992BIO FLUX: nonesrs
95 Fri 12-Jun-1992Bioflux data requirements noneacd
152 Sat 27-Jun-1992Added the bioflux 1-D sonic and fast t nonegdm


41: BUGFLUX , Site none, Sun 07-Jun-1992 17:47:27 GMT, BIOFLUX SAMPLE TIME/COMMENTS
Bioflux sample times/comments 
 
Julian day 155 - 156 set-up Bioflux tower 21:30-03:30 (GMT) 
 
DATE TAKEN  KEY  START TIME  END TIME   COMMENTS 
 (JULIAN)          (GMT)      (GMT) 
 
   156      A    22:14:00    23:14:00   slit samplers inside position 
					22:14-22:19 activity W of tower 
					22:30 deisel truck N of tower 
 
   156-157  B    23:35:00    00:35:00   andersen samplers inside position 
 
   157      C    20:20:00    21:20:00   20:38 dust devil S of tower 
					20:50-21:05 activity W of tower 
 
 
   157      D    21:30:00    22:30:00   22:20-22:30 activity S of tower 
 
   157      E    22:41:00    23:41:00   (L)Andersen sampler disconnected  
					23:30-23:35 activity S of tower 
    
   157-158  F    23:50:00    00:50:00   activity S of tower throughout sample 
 
   158      G    00:58:00    01:58:00   re-adjust (L)Andersen sampler to 28LPM 
					activity S & W throughout sample  
					01:35 two vehicles on road E of tower 
 
   158      H    02:05:00    03:05:00   02:56 vehicle on road E of tower 
     
   158      I    20:42:00    21:42:00   20:50 distant dust clouds E of tower & 
					activity S of tower 
 
   158      J    21:52:00    22:52:00    
 
   158-159  K    23:01:00    00:01:00   23:54 dust cloud approaching from E due 
					to construction, diluted out as  
					approached samplers 
 
   158      L    00:10:00    01:10:00   
 
   158      M    01:19:00    02:19:00   01:50 truck on road E of tower 
 
   158      N    02:27:00    03:27:00 
 
   159      O    12:16:00    13:16:00 
 
   159      P    13:22:00    14:22:00 
 
   159      Q    14:29:00    15:29:00   activity W & S of tower towards end of 
					sample 
 
   159      R    15:36:00    16:36:00    
 
   159      S    18:29:00    19:29:00   ~19:00 activity S & W of tower 
 
   159      T    19:36:00    20:36:00   activity S & W of tower throughout samp. 
 
   160      U    01:11:00    02:11:00   "The Bushwacker" - hit sage bushes from 
					01:12:00 - 01:22:00 area W of tower 
					~20 X 250 m (to release line) 
 
   160      V    13:13:00    14:13:00 
 
   160      W    14:20:00    15:20:00   15:10 - 15:26 diesel truck N of tower 
 
   160      X    15:26:00    16:26:00    
 
   160      Y    16:32:00    17:32:00   activity S & W of tower until end of day 
 
   160      Z    17:38:00    18:38:00 
 
   160     AA    19:12:00    19:12:10   control sample - routine procedure, 
					turned samplers on in series then off 
					in series 
 
   160     BB    19:20:00    20:20:00    
 
   Disassembled sampler-pulley system and datalogger for adjustments to two   
   sampler levels, equal vacuum tubing lengths, and for attachment of critical 
   orifices to all sampler units.  Will return June 23. 
 
   Return to Richland unload and set-up sampler holder June 23  
   (JD 176 GMT 02:00-05:00)  Now using two sampler heights, 2.5 meters and 
   8 meters.  All flowmeters recalibrated and samplers are being rotated 
   into different positions to eliminate a "sampler/position effect".  
   All tubing equal length to eliminate "height/flow effect".  
 
DATE TAKEN KEY    START TIME  STOP TIME  COMMENTS 
 (JULIAN)           (GMT)       (GMT) 
 
   176      a     14:24:00    14:24:10   control sample  
					 1 on site 
 
   176      b     14:36:30    15:36:30 
 
   176      c     15:47:00    16:47:00   4 on site 
					 end sample 6 on site 
 
   176      d     16:57:00    17:57:00   diesel truck 
 
   176      e     18:05:00    18:05:10   control 
		  18:05:50    18:06:00   repeat control foil on lower samplers 
 
 
   177      -    (02:00:00 set up sonic anemometer at 5 meter height) 
 
   177      f     14:05:00    14:05:10   control 
 
   177      g     14:15:00    15:15:00   no others on site 
 
   177      h     15:23:00    16:23:00    
 
   177      i     16:30:00    17:30:00 
 
   177      j     17:38:00    17:38:10   control 
 
   178      k     01:39:30    01:39:40   control 
					 4 on site 
 
   178      l     01:47:00    02:47:00 
 
   178      m     02:55:00    03:55:00 
 
   178      n     04:06:00    05:06:00    
 
   178      o     20:05:30    20:05:40   control 
					 2 on site 
 
   178      p     20:59:00    21:59:00   3 on site 
 
   178      q     22:07:00    23:07:00 
 
   178-179  r     23:15:00    00:15:00 
 
   179      s     00:23:00    01:23:00   end of run break to test anemometer 
					 change program to one table 
 
   179      t     03:18:00    04:18:00   4 on site 
 
   179      u     04:25:00    04:25:10   control 
 
   179      v     13:05:00    14:05:00   run with all andersen samplers 
 
   179      w     14:25:00    15:25:00   run with all slit samplers 
 
   179      x     15:33:00    16:33:00   run with all andersen samplers 
 
   179      y     16:42:00    17:42:00   run with all slit samplers 
 
   180  (01:00 GMT) begin shut down process - disconnect sonic, tip down 
	tower. 
 
   180  (13:00 GMT) complete dismantle of tower 
 
   181  (01:00 GMT) load truck 
 
   Hard and disk copies of data will be sent in care of Tony Delany  
   upon completion.   
    
   You may reach us at the following: 
	Bruce Lighthart (503)754-5879  &  Brenda Shaffer (503)754-4562 
	US EPA                            ManTech Environmental Tech.Inc. 
	Environmental Research Lab        <--same address 
	200 S.W. 35th Street               
	Corvallis, OR 97333 
 
   Thanks !! 
 
55: BUGFLUX , Site none, Mon 08-Jun-1992 03:11:21 GMT, BIO FLUX:
BIO FLUX: 
 
	The bioflux data logger provides 
2 output signals. These have been setup for 
temperature measurements at 8m and 2m on 
channels 104 and 106, respectfully. 
Data are now coming in @ 03:00Z. 
 
95: BUGFLUX , Site none, Fri 12-Jun-1992 18:08:41 GMT, Bioflux data requirements
Bioflux data requirements 
 
The bioflux program is designed to measure the surface flux of 
viable micro-organisms.  
Bruce and Brenda take 30 or 60 minute impactor samples at different 
heights on their tower. They need the heat flux and the temperature 
gradient data from the cosmos flux and psychrometer towers in order 
to calculate their fluxes. 
 
	     Ht flux  = overbar(w't') = K Cp rho Dt/Dz 
 
	     Bioflux =                = K Dbio/Dz 
 
	     Bioflux = overbar(w't')/Cp rho (Dbio/Dt) 
 
For the days which they collected impactor samples we should provide 
the covars for : 
		 wt 
		 tdry.psyc.1.5m 
		 tdry.psyc.3m 
		 tdry.psyc.5m 
		 tdry.psyc.7.5m 
		 tdry.psyc.10m 
This should be printed out numerical data. 
Six parameters with 288 values each for each of the 10 or so days 
that they operate. 
 
152: BUGFLUX , Site none, Sat 27-Jun-1992 02:23:14 GMT, Added the bioflux 1-D sonic and fast t
Added the bioflux 1-D sonic and fast t to cosmos 
 
 
  Installed 20hz filters for these channels in the filter board on cosmos. 
The sonic signal coming out of the Campbell 21X datalogger was very ugly, 
with much jitter, so the Aster data connection is at the input of the 21X and 
looks OK.  The output voltage of the sonic is +-5V with 1V=1m/sec.  The 
channel is configured with gain=0. 
 
  The fast t seems to be broken, the output is fixed at around -2.8 V. 
 
 
  Cosmos was down for this work from 15:57 (22:57 GMT) to about 17:00 (00:00).