Entry
| Date
| Title
| Site
| Author
| #Graphics
|
358 | Thu 07-Jun-2007 | tower climbing | 30m tower | patton
|
350 | Wed 06-Jun-2007 | Lowered array to low position | horizontal array | horst
|
345 | Tue 05-Jun-2007 | fuse blown on tower transformer | 30m tower | maclean
|
344 | Tue 05-Jun-2007 | power to WSU SF6 | 30m tower | maclean
|
332 | Sat 02-Jun-2007 | Lowered array to mid-canopy | horizontal array | horst
|
331 | Fri 01-Jun-2007 | ACD power load / WSU Drop | 30m tower | militzer
|
312 | Tue 29-May-2007 | Array shutdown and narrowed, brought up in 'high, narrow' (9.6, 10.6) position. | horizontal array | poulos
|
311 | Tue 29-May-2007 | Guy Wire Tensions as of 28 May - array | all | poulos
|
308 | Mon 28-May-2007 | Sonic boom elev angles and boom azimuths (with declination) low-wide array | horizontal array | poulos
|
291 | Fri 25-May-2007 | Array lowered to 'low' wide position - array heights | horizontal array | poulos
|
283 | Tue 22-May-2007 | Partial array lowering to 'low' position on Wed afternoon. | horizontal array | poulos
|
277 | Mon 21-May-2007 | Guy Wire Tensions / NOTE drop since 5/10... | all | militzer
|
254 | Fri 18-May-2007 | array climbed | horizontal array | militzer
|
247 | Thu 17-May-2007 | Tall Tower Climbed: scintillometer | 30m tower | militzer
|
245 | Thu 17-May-2007 | Array lowered to middle position | horizontal array | poulos
|
219 | Sun 13-May-2007 | ACD power load / Tower DC | 30m tower | militzer
|
208 | Sun 13-May-2007 | Array lowered 10 May - work began 1510LT | horizontal array | poulos
|
190 | Fri 11-May-2007 | Array west-east heights remeasured | horizontal array | poulos
|
188 | Thu 10-May-2007 | Guy Wire Tensions / Tall Tower tightened | all | militzer
|
167 | Thu 19-Apr-2007 | Trimble Pro XRS GPS Measurements between April 8 to 11th. | all | burns
|
126 | Mon 09-Apr-2007 | Measured tension of Guide Lines | all | romberg
|
69 | Thu 29-Mar-2007 | guy wire tension | all | semmer
|
18 | Sat 17-Mar-2007 | Towers running on line power today | all | horst
|
- 358: infrastructure, Site 30m tower, Thu 07-Jun-2007 15:51:36 PDT, tower climbing
climbed the tower today at about 10:30 to install flagging on the TRH booms
at 14, 18, 23m. was off the tower by 10:45.
- 350: infrastructure, Site horizontal array, Wed 06-Jun-2007 12:52:36 PDT, Lowered array to low position
Lowered sonc array to 2,3 m position from 9:15 - 9:36, June 6.
Moved TRH's to lower positions, finishing at 10 am
Sonic boom heights on east = 2.94 and 1.93 m; on west = 2.95 & 3.95 m
TRH boom heights = 2.46 & 3.45 m.
- 345: infrastructure, Site 30m tower, Tue 05-Jun-2007 12:01:10 PDT, fuse blown on tower transformer
Power to the ACD trailer, WSU shack and the tower died
during the night. According to WSU's data it died
at 1:30 am local time.
The ISFF data systems and sensors continued to run - 12 V batteries kept
things going (did not check their voltage).
Power to the main switch was OK, but no voltage at the breaker
panel. Eventually found a blown fuse - one of the two fuses
on the black Dynatech (sp?) black box mounted on the inside of the
wall from the main power input. It is a 30A slow-blow.
Kurt says the black box is a surge suppressor.
Replaced the fuse and brought everything back up, with the
exception of the CPC counter, which is disconnected.
Power draw at the transformer breaker box is now:
1 leftmost ACD west + WSU small pump + WSU sys (14-17A)
2 next 30m tower (2A)
3 next: WSU big pump (7A)
4 rightmost: ACD north + lights (12-14A)
circuits 1 & 2 are on one leg, and 3 & 4 are on the other.
Measured the draw on each leg:
1+2: 16-19A
3+4: 19-21A
Things were back up at about 11:00 with a full load (without CPC).
- 344: infrastructure, Site 30m tower, Tue 05-Jun-2007 11:46:55 PDT, power to WSU SF6
WSU requirements (120V):
big pump: 7A
little pump: 3A
other: 3A
The 120V breakers, from left to right, on the white transformer
(da big one) at the tower, control these circuits:
1 leftmost ACD west (11-13A)
2 next 30m tower (2A)
3 next: for WSU
4 rightmost: ACD north + lights + CPC(12A)
We put WSU's big pump on #3 (the one labeled WSU)
and added their small pump and systems to the ACD west circuit.
It ran for several hours, then died during the night, see subsequent
entry...
- 332: infrastructure, Site horizontal array, Sat 02-Jun-2007 11:13:34 PDT, Lowered array to mid-canopy
On June 2, from 9:10 - 9:28 we lowered the sonic array to mid-canopy.
The sonic booms are at
4.88 and 5.90 m on the east and
4.90 and 5.89 m on the west.
From 9:44 - 10:15 we moved the TRH's to mid-canopy, completing the
configuration change.
- 331: infrastructure, Site 30m tower, Fri 01-Jun-2007 13:26:55 PDT, ACD power load / WSU Drop
13may07
Update 1jun07: Rewired in 20A breaker for WSU when they come
Main breaker in transformer distribution panel = 30A 240VAC
leg1 = ~ 12.5@120ACD + ~2.5@120Tower = 15A
leg2 = ~ 11-14A@120ACD = 14A
leg2 will have WSU load, what ever that is. It is on
the 2nd 20A half of the breaker serving ACD's 'lights.'
Built adaptor cable for an extension cable for them.
Gordon, Tom know that their load needs to be measured
and if significant, we prefer some be put on the 'leg1'
distribution in the ACD trailer to balance the loads.
Andreas' CPC can be taken down if capacity is needed
- 312: infrastructure, Site horizontal array, Tue 29-May-2007 09:08:07 PDT, Array shutdown and narrowed, brought up in 'high, narrow' (9.6, 10.6) position.
adn east and west at 0909LT. Systems halted as well.
Array narrowing procedure began at 0910LT. (Patton, Militzer, Poulos, Lenschow)
Hotfilms removed.
p' mounted on array in umbilical.
At or a few minutes after 1648LT first powered up east, west and hfarray.
Checked data_stats at 1700.
All look good (good data rates and all sensors present).
Rate of file growth is correct (heading for isff_ 4 hrly files of ~852Mb).
Plotting of raw data from array ...
Sonics - Look fine, 5 min avg, high-rate, spectra
Kryptons - ditto
Licors - ditto
T/RHs - T/RH.top fan is 'chattering' will eval tomorrow
p' - need longer second arm - will put up tomorrow after visit to hardware
Winds 'locked in' good wind direction ~ 1900LT and the array was up at that
time (in place in 'high' position.
high.xml implemented, with new times and configs.xml updated. server ands
statsproc restarted.
6/3/07
Ned reports that a diagonal bar was placed on the horizontal array from the
head of sonic 5b to the yoke location of sonic 5t to reduce the sag of
the lower horizontal line of sonics.
- 311: infrastructure, Site all, Tue 29-May-2007 08:46:59 PDT, Guy Wire Tensions as of 28 May - array
16-18LT 28 May array tensions measured, single turn of each turnbuckle and
after-turn-tensions.
Horizontal Array
West-array
5/10/07 5/20/07 28 May 28 May 6/2/07
before after
NW 400 310 300 450 420
SW 350 290 250 400 350
SE 300 240 220 340 320
NE 340 275 250 360 340
East-array
5/10/07 5/20/07
NW 350 300 250 260 250
SW 300 260 210 250 230
SE 400 340 300 300 300
NE 420 340 300 310 290
Center-tower
5/10/07 5/20/07
NW 310 280 240 260 230
SW 290 290 250 340 300
SE 290 250 230 230 220
NE 320 310 280 340 320
Vertical Tower
N guy wires
lowest 450
#2 420
#3 400
highest 475
SE guywires
lowest 320
#2 460
#3 270
highest 370
SW guywires
lowest 390
#2 260
#3 320
highest 320
- 308: infrastructure, Site horizontal array, Mon 28-May-2007 10:43:22 PDT, Sonic boom elev angles and boom azimuths (with declination) low-wide array
Low-wide sonic boom azimuths were taken today and (below) sonic elevation angles
from theodolite. We also measured the p' sensor elevation and azimuth.
Array boom azimuths - low, wide position 28 May 1430-1515LT
Sonic Don Greg
----- ------ ------
1b 359.3 358.9
2b 359.1 358.3
3b 358.3 359.3
4b 358.9 359.0
5b 358.5 359.0
6b 359.0 359.2
7b 359.7 359.5
8b 357.8 358.3
9b 358.5 359.1
1t 357.7 357.7
2t 358.0 358.5
3t 358.1 358.6
4t 357.3 357.2
5t 357.3 357.8
6t 357.3 356.8
7t 358.0 358.1
8t 357.7 357.1
9t 357.7 358.4 (HARD TO GET FROM ANY POSITION DUE TO BRANCHES)
Sonic boom elevation angles 1100-1330LT - low wide position
--------------------------- -----------
The theodolite was aligned carefully with boom 4b. It was placed where we could
see all of the sonics where the struts join the box (the box with the sloped
faces, where these measurements were made last time). The theodolite was then
brought to dead level (elev angle of 90 degrees).
Height of theodolite in this position: 1.58m agl (measured twice).
Height on sonic/LiCor apparatus: 1.632m (metallic fastener, bottom)
(NOTE: This indicates a 5cm increase in the height of the ground at the
theodolite location relative to the earth immediately below the sonic. This is
sensible be cause of the larger amount of walking activity at the sonic, and
we note pooling of water during sprinkling near the sonics.)
Distance from theodolite to the sonic centroid is: 9.842m
(NOTE: We measured 10.3m north to vertical post on Licor mount post and 0.458m
back south to the sonic centroid. 10.3m was at the dead level position of the
theodolite targeted to the metallic piece on the sonic/Licor apparatus)
Based on additional measurement in the vertical of 0.318m to sonic centroid from
metallic piece at 1.632m)
Height of sonic 4b centroid as measured above local ground level: 1.95m
(NOTE: Based on earlier boom height measurements, logbook 291 and 52, this
indicates sag of sonic boom 4b of 5cm [slightly more because we measured at
the strut-joining-box not out at the claws - one could project that distance])
Sonic Bottom Top Azimuth Height (calculate)
----- ---------- --------- --------- --------
1b 88.20.21 88.07.18 154.23.29
2b 88.19.24 88.05.43 162.34.29
3b 88.25.07 88.10.54 171.46.39
4b 88.24.24 88.09.36 181.14.05
5b 88.19.37 88.05.08 190.59.19
6b 88.38.50 88.24.50 199.53.03
7b 88.52.20 88.39.31 208.00.33
8b 88.56.33 88.44.30 215.21.08
9b 88.55.27 88.44.00 221.30.18
TRH 88.18.11 86.45.59 187.17.57 (Bottom is bottom of inlet and top
is top of inlet (at jctn to next piece)
1t 83.22.20 83.09.34 154.23.12
2t 83.00.18 82.46.42 162.28.39
3t 82.50.34 82.36.20 171.40.34
4t 82.46.26 82.31.46 181.12.30
5t 82.58.48 82.44.20 191.00.16
6t 83.14.38 83.00.54 200.00.23
7t 83.39.35 83.26.20 208.07.07
8t 84.05.07 83.53.09 215.23.04
9t 84.36.01 84.25.10 221.31.38
TRH 83.18.54 81.47.21 187.17.45
p' sensor, low, wide near 4b
Elevation 85.35.14 at center
Azimuth 181.18.26
Greg has hardcopy notes of this activity if there seem to be errors in this
table. Table entries checked over as entered but not from scratch a second
time.
- 291: infrastructure, Site horizontal array, Fri 25-May-2007 15:31:05 PDT, Array lowered to 'low' wide position - array heights
Starting at 15:50LT the array was lowered from the middle to low position.
Lowering was completed and the site departed at 19:05LT.
ttyS13 LiCor cable (east 6b) had to be re-jiggered (taped) after an 'incident'.
Branch cut at sonic.5b (would hit with westerly).
Batteries were beeping after running lights. Being recharged.
Measurements using the new tape (with its clip at zero)
Array heights (agl m)
-------------
Central tower
-------------
T/RH top 3.435
Top sonic boom 2.90
T/RH bot 2.46
Bottom sonic boom 1.935
---------------
West array half
---------------
East part - top sonic boom - 2.95 (3.0 at sonic)
East part - bot sonic boom - 1.95 (2.0 at sonic)
West part - top sonic boom - same
West part - bot sonic boom - same
---------------
East array half
---------------
As above
- 283: infrastructure, Site horizontal array, Tue 22-May-2007 16:50:56 PDT, Partial array lowering to 'low' position on Wed afternoon.
In order to expedite array lowering to the 'low' position planned for late
Thursday (> 12 hours after the pesticide spraying on Wed night but before or
just as the winds turn favorable south) we will lower the instruments on the
central tower of the array. This is the most time consuming part of the process
and therefore, we believe, provide more data at the 'low' position during
favorable flow.
The ability to filter winds at the current configuration (mid height) will be
sacrificed therefore for the period late Wed - late Thurs, but the winds are
forecast to be unfavorable during this period.
If the weather forecast alters we may alter our plan.
Completed 23 May 16:30-18:30LT.
- 277: infrastructure, Site all, Mon 21-May-2007 17:43:26 PDT, Guy Wire Tensions / NOTE drop since 5/10...
21may07 Guy Wire Tensions from yesterday,
Notes: 5/10/07 readings taken after tightening 2-turns
5/20/07 readings taken in afternoon,
DID WARM DAY EFFECT CABLE TENSIONS?
From plots/time it was roughly 8-degC warmer or more
//----------------------------------------
30m Tower:
( 1 = inner/lowest : 4 = outer/high-line )
SW
5/10/07 5/20/07
1: 590 450
2: 425 300
3: 510 330
4: 390 330
SE
5/10/07 5/20/07
1: 510 400
2: 650 500
3: 350 300
4: 450 400
North
5/10/07 5/20/07
1: 725 550
2: 575 460
3: 480 410
4: 575 510
//-----------------------------------------
Horizontal Array
West-array
5/10/07 5/20/07
NW 400 310
SW 350 290
SE 300 240
NE 340 275
East-array
5/10/07 5/20/07
NW 350 300
SW 300 260
SE 400 340
NE 420 340
Center-tower
5/10/07 5/20/07
NW 310 280
SW 290 290
SE 290 250
NE 320 310
- 254: infrastructure, Site horizontal array, Fri 18-May-2007 12:52:48 PDT, array climbed
18may07 11:40-12:30
Array climbed, both sides, to take vertical boom measurements and some
of the students on the tour wanted to get a view of the
canopy.
- 247: infrastructure, Site 30m tower, Thu 17-May-2007 15:52:15 PDT, Tall Tower Climbed: scintillometer
17may07 9:10 - 9:50 Tower Climbed
Scintillometer:
Dawit and Anirban (Jan's students) went up to tweak gain/resolution
- 245: infrastructure, Site horizontal array, Thu 17-May-2007 13:46:42 PDT, Array lowered to middle position
Commencing at ~0915LT the array (hfarray halted at 0909LT) was lowered to
it's middle position where
the 'bottom' and 'top' sonics are at 4.9m and 5.9m, respectively. The hotfilms
TRHs and p' sensor were moved as well on the central tower (along with the
central tower sonics, of course).
We were off the array with everything in position as of 1347LT..
Branches were cut near some of the sonics in this position to avoid direct
contact with the sonic/Licor/krypton.
The hfarray disk (ptec#7) was switched out for a different Pocketec as it
was 50% full. The newly installed pocketec did not come up as /var/tmp/usbdisk
and so see the other hotfilm logbook entry today.
Central Tower new heights:
Csat-5bot = 4.90m
Trh-5bot = 5.41m
Csat-5top = 5.85m
Trh-5top = 6.40m
West Array new heights (need tbd)
Csat-1bot = 4.90m
Csat-1top = 5.90m
Csat-4bot = 4.90m
Csat-4top = 5.90m
East Array new heights
Csat-6bot = 4.91m-
Csat-6top = 5.90m
Csat-9bot = 4.91m-
Csat-9top = 5.90m
- 219: infrastructure, Site 30m tower, Sun 13-May-2007 17:36:12 PDT, ACD power load / Tower DC
13may07
ACD loads:
~ 7.5A @120, leg with lights, etc.
~10.5A @120, leg with Alex's big load + CPC on tower (~100w)
Andy said this is very close to everything.
Update 30may07 for ACD loads:
~ 12.5 @120
~ 11-14A @120
So these are under the requested 20A*2,
however, for WSU who requested 20A also there could
be some compromises needed.
Andreas' CPC load can apparently be removed if needed.
Tower DC:
13.5 at Power Supply charging/running daq
12.7 at battery going to boxes
12.3 into upper's main
11.7 into lower's main
11.5 at bulkhead going to ttyS10 (cpc sio only)
These are low, and I wonder just how low they are at height.
Too much IR drop.
Also note that while working on the tower I noticed the lowest
trh fan 'sagged' noticably for a short period.
This only happened twice that was observed and since AndyT.
was there I decided to blame his ACD loads, but......
could this be and issue with trh quality due to occassional
insufficient aspiration.
- 208: infrastructure, Site horizontal array, Sun 13-May-2007 16:30:17 PDT, Array lowered 10 May - work began 1510LT
Work on array began 1510LT (ropes, reviewing process of lowering etc.), with
climbing for pins etc. before actual lowering.
West was lowered 1600-1620LT, back up 1700LT.
East was lowered 1710-1730LT, back up 1825LT.
Finished up by 1830LT.
- 190: infrastructure, Site horizontal array, Fri 11-May-2007 15:39:12 PDT, Array west-east heights remeasured
The heights of the array:
West - west 9.61, 10.61, east 9.61, 10.61 (meters)
East - west 9.61, 10.61, east 9.62, 10.62 (meters)
Note: 0.01 m is within the elevation variability of the soil surface.
- 188: infrastructure, Site all, Thu 10-May-2007 18:29:32 PDT, Guy Wire Tensions / Tall Tower tightened
North Tower:
( 1 = inner : 4 = outer )
Values shown in parenthesis are after taking up 2-full-turns on
every turn-buckle. Tower looks plumb.
SW lines SE Lines N lines
1: 410 (590) 320 (510) 480 (725)
2: 275 (425) 460 (650) 400 (575)
3: 330 (510) 260 (350) 400 (480)
4: 285 (390) 330 (450) 420 (575)
//---------------------------------------------------------------------->>
Horizontal Array
West East Center
NW 400 350 310
SW 350 300 290
SE 300 400 290
NE 340 420 320
- 167: infrastructure, Site all, Thu 19-Apr-2007 15:22:02 MDT, Trimble Pro XRS GPS Measurements between April 8 to 11th.
Data from GPS Measurements of the location of trees, trailer, road
intersections, sodar, etc from CHATS are available at:
http://www.mmm.ucar.edu/abl/chats/data_gps/
the data are in the following formats (using 070408 as an example):
10326160 Apr 15 22:54 chats_070408.zip % zip file with raw and processed data
64139 Apr 16 14:21 point_ge_070408.html % webpage with processed data
111991 Apr 16 14:35 point_ge_070408.pdf % pdf with processed data
55296 Apr 15 13:50 point_ge_070408.xls % excel file with processed data
a plot with the GPS data overlaid on a photo of the area is available
as:
http://www.mmm.ucar.edu/abl/chats/data_gps/chats_overview_map.png
http://www.mmm.ucar.edu/abl/chats/data_gps/chats_map_zoomin.png
=================================================================================
- 126: infrastructure, Site all, Mon 09-Apr-2007 09:29:27 PDT, Measured tension of Guide Lines
North Tower:
( 1 = inner : 4 = outer )
SW lines SE Lines N lines
1: 475 375 550
2: 300 475 450
3: 400 325 475
4: 325 350 475
//---------------------------------------------------------------------->>
Horizontal Array
West East Center
NW 450 425 400
SW 425 400 375
SE 375 500 400
NE 375 500 425
- 69: infrastructure, Site all, Thu 29-Mar-2007 09:26:30 PDT, guy wire tension
comments:
wires labeled 1 thru 4 go from inner to outer for 30m tower
30 meter
date 3/6/07 3/29/07
northly winds
SW-4 390 320
3 440 400
2 390 310
1 575 500
N-4 560 500
3 560 525
2 550 490
1 690 600
SE-4 440 400
3 400 350
2 600 500
1 455 400
Horizontal west
NW 510
SW 450
SE 400
NE 450
Horizontal East
NW 400
SW 350
SE 480
NE 500
Center
NW 450
SW 400
SE 450
NE 470
- 18: infrastructure, Site all, Sat 17-Mar-2007 17:17:58 PDT, Towers running on line power today
Kurt received the power cable for the towers on Thursday, March 15, and buried
it on Friday. Today he wired up the transformers and we are now charging the
12 V batteries with line power. All four adams are up and running.