METCRAX: Logbook Entries

METCRAX: KH2O Messages: 9 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
170 Tue 19-Dec-2006Krypton is Quality ControlledAllaster
141 Thu 26-Oct-2006generator-spikeSouthwestOncley
132 Wed 25-Oct-2006krypton kleanEast_UpperOncley
131 Wed 25-Oct-2006krypton kleanEast_LowerOncley
130 Wed 25-Oct-2006krypton kleanWest_UpperOncley
129 Wed 25-Oct-2006krypton kleanWest_LowerOncley
128 Wed 25-Oct-2006krypton kleanFloorOncley
50 Mon 09-Oct-2006krypton changed at flrFloorMartin
32 Fri 06-Oct-2006krypton serial numbers and calibration coefficientsAllMartin


170: KH2O, Site All, Tue 19-Dec-2006 19:41:27 MST, Krypton is Quality Controlled
All the kryptons have been quality controlled.
This includes removal of rain dropouts, cleanings, malfunctioning sensor,
and sensor replacement.

141: KH2O, Site Southwest, Thu 26-Oct-2006 17:38:23 MST, generator-spike
There is a -Inf spike on h2o at about 1100 today.  This is when the generator
was being serviced.  We thought that the battery at the station would keep
it going through this, but apparently the station voltage dropped to 11.4V
during this period.

It looks like it came back up okay.

132: KH2O, Site East_Upper, Wed 25-Oct-2006 14:07:31 MST, krypton klean
krypton kleaned ~1248.  MSB of counts went from 0d -> 42!





131: KH2O, Site East_Lower, Wed 25-Oct-2006 14:07:08 MST, krypton klean
krypton kleaned ~1217.  MSB of counts went from 0e -> 1f.




130: KH2O, Site West_Upper, Wed 25-Oct-2006 14:06:42 MST, krypton klean
krypton kleaned ~1155.  MSB of counts went from 09 -> 26.

Krypton mount was loose, but I didn't have allen wrenches.  Should be revisited.


129: KH2O, Site West_Lower, Wed 25-Oct-2006 14:06:08 MST, krypton klean
krypton kleaned ~1145.  MSB of counts went from 03 -> 23.

I had to restart data system code (adn/aup) to get rserial to work.  (But it
seems like the archiving had been fine.)

128: KH2O, Site Floor, Wed 25-Oct-2006 14:04:51 MST, krypton klean
krypton kleaned ~1130.  MSB of counts went from 08 -> 17.

50: KH2O, Site Floor, Mon 09-Oct-2006 14:29:37 MST, krypton changed at flr
krypton sensor s/n 1101 was replaced with s/n 1397 
at approx. 1900 UTC 09 Oct. Unit 1101 was brought 
back to the base.

32: KH2O, Site All, Fri 06-Oct-2006 19:24:25 MST, krypton serial numbers and calibration coefficients
wu: 1395
wl:  1391
flr: 1101
el:  1393
eu: 1525
rim: 1397

Charlie entered these calibrations in  xml configuration files, 10/7/06.


6/6/2006        K1101
Calibration        CuPIDO
pathlength        1.3
Kw        -0.15
V0        626.28

5/19/2006        K1393
Calibration        HAO
pathlength        1.3
Kw        -0.15
V0        1402.77

06/06/06/        K1395
Calibration        CuPIDO
Kw        -0.14
V0        2600.05

6/6/2006        K1397
Calibration        CuPIDO
pathlength        1.3
Kw        -0.15
V0        1092.4

5/19/2006        K1525
Calibration        HAO
pathlength        1.3
Kw        -0.15
V0        2439.21