- 13: radiation, Site stn9_marigold, Mon 24-Jul-2000 09:52:08 PDT, Radiation measurements of Uni Basel started.
7-24-00 16:24 GMT
Radiation stand at site 09: CR23x of University of Basel : Power up, Time set (GPS).
- 14: radiation, Site stn9_marigold, Mon 24-Jul-2000 09:57:02 PDT, Setup Radiation Uni Basel Site 09
From 07-22 (around 16:00 PMT) to 07-24 (10:00 PMT): Work at radiation stand site 09 University of Basel. Cables and ladder may have disturbed measurements of NCAR.
Radiation Setup University of Basel:
> CM 21 950239 upward on block 2 E.
> CM 11 ?????? downward on block 2 E.
> Pyrg. PIR/WRC upward on block 2 W.
> Pyrg. PIR/WRC downward on block 2 W.
> CM 21 910004 upward N side of darkhorse, W of block 2.
> CNR 1 ?????? upward/downward S side of darkhorse, W of block
..
- 15: soil, Site stn9_marigold, Mon 24-Jul-2000 10:11:43 PDT, Setup Soil Measurements Uni Basel Site 09
7-23 around 17:00 PMT Soil sensors installed.
Soil Setup University of Basel:
> HFP 656338 / BT 10 : 4th furrow S of darkhorse feet.
> HFP 656440 / BT 08 : 1st furrow S of darkhorse feet.
> HFP 65628 / BT 15 : 2nd ridge S of darkhorse feet, S-slope.
> HFP G0057 / BT 05 : 3rd ridge S of darkhorse feet, N-slope.
- 16: radiation, Site stn9_marigold, Tue 25-Jul-2000 14:35:49 PDT, Dome cleaning Site 09
7-25-00 17:30 GMT: cleaning of all radiometer domes at stand site 09. check of level. All ok, except NCAR upward looking pyrradiometer is only a little bit out of center. nothing adjusted. cr23x uni basel: time incorrect.
- 20: sonic, Site stn9_marigold, Thu 27-Jul-2000 17:13:23 PDT, Sonic failure
NUW - 5
Placed at site 9 showed some unusual spikes in the T(?) values.
It was replaced by an ATI sonic.
The tests done at the PAM Base raised doubts in the proper operation of one of
the transducers. After the first set of tests the sonic quit working at all and it has been found that it was draining to much current.
This unit has been sent to ATI for further analysis.
- 38: radiation, Site stn9_marigold, Wed 02-Aug-2000 08:46:54 PDT, Dome cleaning site 09
7-30 16:00 - 16:15 GMT Cleaning of all domes at radiation stand site 09. Dome of Q*7 of NCAR is dirty, especially at lower parts. probably due to spraying. Completely cleaning was not possible. Time Uni Bsel OK. Leveling of all instruments OK.
- 39: radiation, Site stn9_marigold, Wed 02-Aug-2000 08:51:32 PDT, Radiation check Site 09.
8-1-00 18:38-19:00 GMT:
Radiation site 09: Leveling OK. Domes OK. No cleaning.
- 40: temp_rh, Site stn9_marigold, Wed 02-Aug-2000 08:55:51 PDT, Profile Tower Site 09 starts operation.
7-31-00 Profile Tower University of Basel changed from intercomparison to operation.
Setup:
1 Height of booms over tower base
2 Psychrometer serial number (type Uni Basel)
3 Cup anemometer serial number (type Vector Instruments A101L)
4 Cup ID
Level
1 0.95m FK02 3656 / HD2
2 1.50m FK09 3654 / HC8
3 2.35m FK12 3390 / CW4
4 3.72m FK13 3389 / HD0
5 6.12m FK18 3655 / HC7
6 9.05m FK22 3657 / HC9 Wind Vane 4729 (Vectro Instr. W200P)
- 41: sonic, Site stn9_marigold, Wed 02-Aug-2000 09:07:25 PDT, Sonic data aquisition site 09 starts operation on 7-31
7-31 / 8-1
Sonic data aquisition system starts operation. Some tests during 8-1 may have effects on data collected by NCAR-system (C1/C2)
Tower 9A
A1 CSI CSAT3 0199 2.4m 60i/20o Hz
A2 Gill HS 000046 6.0m 100i/20o Hz with 1 CSI KH20 (1) 2 KT15 (3,4)
Tower 9B
B1 Gill R2 0043 2.4m 20.8o Hz with 1 KH20
B2 METEK TU Dresden 6.0m 20i/20o Hz with 1 CSI KH20 and 1 LICOR
Tower 9C
*C1 CSI CSAT3 0112 2.4m 60i/20o Hz
*C2 CSI CSAT3 0118 6.0m 60i/20o Hz
*Collected additionally by NCAR
- 46: power, Site stn9_marigold, Wed 02-Aug-2000 17:32:54 PDT, New A/C load
Wed 8/2
Dave Vaughn has been given a 220VAC tap on the 2.5kVA transformer
serving site-9/Marigold. He provided a step-down transformers
and the Romex.
He had attempted to run it using 2 solar panels and 5 batteries
without really knowing what his load actually is.
At the moment he reports 3A at 110VAC for 3 separate pumps;
presumably not all on the same leg. He has not finished configuring
his equipment yet.
- 47: sonic, Site stn9_marigold, Thu 03-Aug-2000 15:05:33 PDT, sonic revived
NUW3 at s9 died yesterday evening. With rserial, it seemed to have the
wrong baud rate. I used the test cable to set it back to sane mode,
and then reconnected with the normal cable. All appears to be normal,
and it appears to have the correct rotation matrix as well.
I don't know why this problem occurred in the first place.
- 48: power, Site stn9_marigold, Thu 03-Aug-2000 15:11:11 PDT, s9 now powered by base
To reduce some of our power problems, we've rerouted power to have all of
s9 connected directly to the second 220VAC outlet on the PAM base, and
not to the 8 KVA transformer near s8. Our load should now be:
s7: 8A @ 220VAC operating, 13+A when A/C starts. On 30A circuit shared with
s8, through 15A breaker at 8KVA xfrmr
s8: 3A @ 220VAC. On 30A circuit shared with s7, through 20?A breaker at 8KVA
xfrmr
s9: 4?A @220VAC. On 20A circuit also supplying s10.
s10: ~3A @220VAC.
P.S. Outages and brownouts throughout the Calif. power grid have made
national news over the last few days associated with high temperatures.
Thus, some of our problems may be outside our control (though the UPS
in the base hasn't shown any alarms.)
PPS: I accidentally shutdown the UPS simply by connecting the Toughbook
to the DB9 connector on the back. This shouldn't have happened!
- 60: sonic, Site stn9_marigold, Sun 06-Aug-2000 13:37:09 PDT, UW down, zeroed
The UW sonic has been reporting bad V winds and has
'unusual' tilt plot.
The sensor, including the Krypton was taken down
and zeroed in the lab.
Down: ~18:15-19:40
Hopefully the data will be improved now.
- 70: sonic, Site stn9_marigold, Tue 08-Aug-2000 17:25:56 PDT, Sonic work at station 9
The sonic at station 9 has been questionable. John and
I replaced it with the repaired unit from ATI only to
find out the repaired unit does not work at all. So
we re-zeroed the questionable unit and set it back out
at station 9. The sonic still appears to have problems.
The u and w components are questionable.
This work took place between 17:00 and 22:00 GMT.
- 75: sonic, Site stn9_marigold, Fri 11-Aug-2000 08:43:14 PDT, WARNING: UW at 9 in in a test mode
After talking with Steve O. last night, I have changed
the UW at station 9 to operate in an orthogonal mode. We
may be able to identify a bad set of transducers.
This change was made about 5 minutes ago.
- 78: sonic, Site stn9_marigold, Fri 11-Aug-2000 10:59:42 PDT, UW and Krypton at station 9 removed at 11:45 local
Based on the test of the individual sonic axis, the
u axis is noisy compared to v and w. I will take the sonic
down and check the solder joints on the transducer wires
attached to the electronics board.
- 79: sonic, Site stn9_marigold, Fri 11-Aug-2000 14:19:38 PDT, Sonic at 9 bad
The sonic at 9 has gone from questionable to dead.
The solder connections looked ok. When I tried to
re-zero it, the distances were bogus for all 3 axis.
- 80: other, Site stn9_marigold, Fri 11-Aug-2000 14:51:51 PDT, Carbon (TU Dresden)
Summary of TU Dresden measurements at Swiss-Site (see also Vogt and Christen)
Data sampling from the Campbell logger was done at every field trip, data are almost continuous from July 31 to today
July 30, 2000 instruments added to station 9
METEK USA1, LICOR 7500 (open path) at 6m above the ridge
(tower B, above Solent R2), additional miscallaneous
(TCs, HMP35)
Data transfer to Swiss computer (raw data 20 Hz)
Fluxes on-line via CSI CR10X (8 Hz)
METEK running, but produces 'invalid data
CR10X started on PST
LICOR values mV=mmol/m3
July 31, 2000 METEK path lengths measured at tower (roughly with ruler),
data o.k., temperature about 6 C too low, uvw evt. also affected
no re-calibration done, should be corrceted later
19.40 PST time changed to 2.40 GMT
August 1, 2000 several tests performed with METEK for band-filter (esp. 40 Hz
measurements), not succeeded returned to 20 Hz raw data
21,48 GMT: LICOR chnaged to mmol CO2/m3 = 15/5000 mV + 10, mmol H2O/m3 = 1/5 mV + 250 (same as Foken)
August 2, 2000 Campbell logger connected to 12V DC (was running on back-up batt eries only), power down at 17.30 GMT
August 3, 2000 o.k.
August 4, 2000 o.k.
August 5, 2000 o.k.
August 7, 2000 o.k.
August 9, 2000 o.k.
August 10, 2000 o.k., common effort to measure canopy height across field
(see Vogt)
August 11, 2000 o.k.,
18.15 GMT :LICOR cleaned (window indicator went down from 62
to 59%)
- 81: sonic, Site stn9_marigold, Sat 12-Aug-2000 11:17:48 PDT, sonic and fast Q back up at 9
The sonic and fast Q are running again at site 9.
The sonic came back from ATI. When I first powered it up
it did not work. Playing with the board I got it
running. Be warn it may go down!
- 90: sonic, Site stn9_marigold, Sun 13-Aug-2000 14:17:44 PDT, parameters on uw sonic changed
In getting the UW sonic fixed by ati, all our settings were lost, so we've
been operating it wrong since it was installed yesterday.
I just changed:
- set the serial number from unassigned to nuw5 (I think this is right).
- shadow correction turned off (was using 0.84/0.16)
- rotation matrix changed from ATI's default to that from the 6/9/2000
measurements.
Thus, it will be difficult, if not impossible, to recover data from the
last 28 hours or so.