- 256: VISIT_LOG, Site 3, Sat 24-May-1997 17:36 GMT, Routine,Teardown
Site Visitation Log Entry
=========================
Tech: CJ
Weather:
Sensor Maintenance Performed
============================
Baro IC
Assman IC
Assman IC Record Sampled at: 17:47
================
ID Tdry rh Twet Pressure
Assman 25.08 61.3 19.14
PAM Trh 1 24.89 60.5 967.9
Samples: 11
Comments: one bad reading in avg. not very windy
Barometer IC Record Sampled at: 17:50
===================
ID Pressure
IC Unit 37039 967.75
PAM 1 967.80
Comments:
Zero ATI w axis 17:41 only 8mins. u axis 17:50 v axis 17:04
Lif is sweet. Down loaded data
- 254: VISIT_LOG, Site 3, Fri 23-May-1997 22:15 GMT, Teardown
Site Visitation Log Entry
=========================
Tech: CJ
Weather: windy cldy warm
Sensor Maintenance Performed
============================
Assman IC
Baro IC
Rain Check
Soilm IC
Rain Gauge Check Record Sampled at: 23:25
=======================
Gauge Type: MRI S/N: 32 Reading: 98 Expected: 100
Comments:
Hope the batteries were taken by someone we know?! No ics today. No power
- 242: , Site 3, Tue 20-May-1997 22:54:51 GMT, gps readings taken at site 3
gps readings taken at site 3 at 18:30 for 1 hour
- 236: VISIT_LOG, Site 3, Mon 19-May-1997 21:47 GMT, soil sample, soil moisture IC,soil sample, soil moisture IC
Site Visitation Log Entry
=========================
Tech: C
Weather: high cirrus, breezy
Sensor Maintenance Performed
============================
Soil Mois IC
Soil Moisture IC Record Sampled at: 21:52
=======================
IC Reading: 34.10
PAM Reading: 1.01
PAM raw Reading: 1.8400
Comments: 34.1 % by volume
took soil sample, and did a soil moisture IC
- 205: VISIT_LOG, Site 3, Tue 13-May-1997 19:17 GMT, Routine
Site Visitation Log Entry
=========================
Tech: CJ
Weather: CLEAR WARM SE WIND
Sensor Maintenance Performed
============================
Assman IC
Baro IC
,Soil Mois IC
Assman IC Record Sampled at: 19:53
================
ID Tdry rh Twet Pressure
Assman 22.97 37.3 14.17
PAM Trh 1 23.61 36.9 963.9
Samples: 10
Comments: good natural aspiration
Barometer IC Record Sampled at: 19:20
===================
ID Pressure
IC Unit 37039 964.34
PAM 1 964.35
Comments:
Barometer IC Record Sampled at: 19:26
===================
ID Pressure
IC Unit 37039 964.22
PAM 1 964.22
Comments:
Soil Moisture IC Record Sampled at: 19:54
=======================
IC Reading: 30.10
PAM Reading: .79
PAM raw Reading: 1.6600
Comments:
Cleaned rnet, cleaned krypton.
Sonic Boom height: 159" to top of 1"xarm.
TSFC seems to point 1/2 way between corn and 2' tall wheat. Is this ok?
Q7 levelled. Licor 1/2 bubble out. Stand settling.
- 187: VISIT_LOG, Site 3, Fri 9-May-1997 22:02 GMT, Routine
Site Visitation Log Entry
=========================
Tech: JM
Weather:
Sensor Maintenance Performed
============================
Soil Mois IC
Soil Moisture IC Record Sampled at: 22:08
=======================
IC Reading: 29.50
PAM Reading: .83
PAM raw Reading: 1.6900
Comments:
Soil sample taken. trime IC 29.5%
- 172: VISIT_LOG, Site 3, Tue 6-May-1997 18:02 GMT, Routine,Krypton,Data Retrieval
Site Visitation Log Entry
=========================
Tech: MM
Weather: overcast, SE winds
Sensor Maintenance Performed
============================
Baro IC
Assman IC
Soil Mois IC
Unplugged Krypton
Assman IC Record Sampled at: 18:15
================
ID Tdry rh Twet Pressure
Assman 24.51 39.9 15.82
PAM Trh 1 24.33 41.1 977.6
Samples: 10
Comments: very nice IC. variances less than .2 deg C
Barometer IC Record Sampled at: 18:05
===================
ID Pressure
IC Unit 37039 977.68
PAM 1 977.59
Comments:
Soil Moisture IC Record Sampled at: 18:25
=======================
IC Reading: 29.20
PAM Reading: .73
PAM raw Reading: 1.6000
Comments: avg 28.9 +29.4 (got good 45 deg samples)
corn crop is 1" tall now
Offloaded all PCMCIA data
- 153: VISIT_LOG, Site 3, Fri 2-May-1997 17:01 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: EK
Weather:
Sensor Maintenance Performed
============================
Soil Mois IC
Krypton reconnect -had no bag
Soil Moisture IC Record Sampled at: 17:12
=======================
IC Reading: 34.60
PAM Reading: .90
PAM raw Reading: 1.7500
Comments:
low Krypton count around 800 - seems to be going up as it dries out in sun
last reading 920
- 145: VISIT_LOG, Site 3, Thu 1-May-1997 17:26 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: TH
Weather: Light rain
Unplugged krypton hygrometer at electronics box and
installed shorting plug.
- 131: VISIT_LOG, Site 3, Mon 28-Apr-1997 23:11 GMT, Baro problem
Site Visitation Log Entry
=========================
Tech: MM
Weather: cool breezy, IOP
Sensor Maintenance Performed
============================
Baro Work
Stuff from baro:
Enter parity (E, O, N) [N]->
Opening communications to "/tyCo/1". Type a D when done
Software version PTB220 / 1.04
Serial number S0610001
Configuration 1
Linear adjustments OFF
Multipoint adjustments ON
Calibration date 1997-01-30
Baud Parity Data Stop Dpx 9600 N 8 1 F
Echo OFF
Sending mode STOP
Measurement mode NORMAL
Pulse mode OFF SLOW LOW 0.0
Address 1
Output interval 0 s
Output format "B1 " 4.2 P1 " " 3.1 T1 #r #n
Error output format
SCOM format
Pressure unit hPa
Temperature unit 'C
Averaging time 0.5 s
Set baro to 1 sec interval and 1 sec avg
- 120: VISIT_LOG, Site 3, Mon 28-Apr-1997 16:01 GMT, Routine
Site Visitation Log Entry
=========================
Tech: EK
Weather:
Sensor Maintenance Performed
============================
Assman IC
Baro IC
Rain Check
Assman IC Record Sampled at: 16:17
================
ID Tdry rh Twet Pressure
Assman 17.43 54.5 11.18
PAM Trh 1 18.13 37.5 968.5
Samples: 10
Comments:
Assman IC Record Sampled at: 16:50
================
ID Tdry rh Twet Pressure
Assman 19.17 29.1 10.08
PAM Trh 1 18.99 32.8 968.4
Samples: 10
Comments: this is he good one
Barometer IC Record Sampled at: 16:52
===================
ID Pressure
IC Unit 37039 968.09
PAM 1 968.27
Comments:
Rain Gauge Check Record Sampled at: 16:56
=======================
Gauge Type: MRI S/N: 32 Reading: 100 Expected: 100
Comments:
pounded in horse gnd rod
- 118: VISIT_LOG, Site 3, Sun 27-Apr-1997 21:46 GMT, Setup
Site Visitation Log Entry
=========================
Tech: SO
Weather:
Sensor Maintenance Performed
============================
Rad Work
Soil Mois IC
Soil Moisture IC Record Sampled at: 21:49
=======================
IC Reading: 31.50
PAM Reading: .65
PAM raw Reading: 1.5300
Comments: average of 30.4, 33, 14.5 (top disturbed dirt)
moved rad stand, rain gauge, and soils to permanent home
now that field has been planted
- 116: VISIT_LOG, Site 3, Sun 27-Apr-1997 20:08 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: SO
Weather:
more vigrous cleaning of krypton
increased voltage from 0.9 to 1.2, still rather low.
note that the Y cable connection to the krypton is somewhat corroded.
- 112: VISIT_LOG, Site 3, Sun 27-Apr-1997 17:38 GMT, Krypton,Krypton , unbag and glop
Site Visitation Log Entry
=========================
Tech: EK
Weather: mixed becoming overcast
reading befoe unbagging 976
after 825+- baro - 0 errors
- 108: VISIT_LOG, Site 3, Sat 26-Apr-1997 20:00 GMT, baro swap
Site Visitation Log Entry
=========================
Tech: EK
Weather: overcast and cold
Sensor Maintenance Performed
============================
Comp. Chg
Component Change
================
Barometer Component: Install Old s/n: NA New s/n: S0610001
Success? Y
Comments:
checking to see if this baro is bad---locks up every other day
put the "bad" barometer on this station from site 1.
- 105: VISIT_LOG, Site 3, Sat 26-Apr-1997 17:09 GMT, barometer swap with st1
Site Visitation Log Entry
=========================
Tech: MM
Weather: overcast and drippy
Sensor Maintenance Performed
============================
Comp. Chg
Component Change
================
Barometer Component: Remove Old s/n: S0610002 New s/n: NA
Success? Y
Comments:
experiment to sort out crashing barometers at st 1 and st 6
- 80: VISIT_LOG, Site 3, Tue 22-Apr-1997 20:10 GMT, load despiker config
Site Visitation Log Entry
=========================
Tech: MM
Weather: regenerated log report
Loaded despiking config.
Checked PCMCIA. This station is one of the ones which has a boot glitch when starting the /CARD save. Noticed only one day of data on the card.
Copied jd 107 to jd112 (today) data from RAM to card.
- 79: VISIT_LOG, Site 3, Tue 22-Apr-1997 20:00 GMT, sonic problem
Site Visitation Log Entry
=========================
Tech: SS
Weather: partly cloudy and nw winds 5--7m/s
Station Service Performed
=========================
Load Config
Loaded despiking config.
Checked PCMCIA. This station is one of the ones which has a boot glitch when starting the /CARD save. Noticed only one day of data on the card.
Copied jd 107 to jd112 (today) data from RAM to card.
- 72: VISIT_LOG, Site 3, Mon 21-Apr-1997 19:51 GMT, Data Retrieval
Site Visitation Log Entry
=========================
Tech: SS
Weather:
Station Service Performed
=========================
Offload Data
- 70: VISIT_LOG, Site 3, Mon 21-Apr-1997 18:52 GMT, routine visit
Site Visitation Log Entry
=========================
Tech: SS
Weather: regenerated log report
Sensor Maintenance Performed
============================
Assman IC
Baro IC
Rain Check
Assman IC Record Sampled at: 19:42
================
ID Tdry rh Twet Pressure
Assman 21.94 48.0 15.04
PAM Trh 1 22.14 47.8 962.2
Samples: 12
Comments: assman about 18" north of TRH
Barometer IC Record Sampled at: 19:26
===================
ID Pressure
IC Unit 37039 962.26
PAM 1 962.37
Comments:
Rain Gauge Check Record Sampled at: 19:45
=======================
Gauge Type: MRI S/N: 32 Reading: 98 Expected: 100
Comments: This gauge is in a temporary location
Adjusted and zeroed "U" vector of sonic.
XMT power: 8.5 forward, 0.5 reverse.
The assman was mounted about 18" North of the TRH intake.
Intakes were at the same height.
Boom check with datascope: sonic - 248.7, prop - 337.8
- 41: VISIT_LOG, Site 3, Thu 17-Apr-1997 19:08 GMT, zero ati sonic
Site Visitation Log Entry
=========================
Tech: SS
Weather: clear, breezy
zeroed ati sonic, removed trh for zeroing ati sonics at other stations
- 37: VISIT_LOG, Site 3, Wed 16-Apr-1997 19:44 GMT, Setup rad stand
Site Visitation Log Entry
=========================
Tech: SO
Weather: partly cloudy, winds from the north
rotated mast 10 deg to south sonic angle 248 28 10 prop direction 337 17 10 leveled sonic cleaned krypton setup rad farm, but dark horse is still not located due to waiting for field to be planted
- 35: VISIT_LOG, Site 3, Wed 16-Apr-1997 11:01 GMT, mount TRH and fix licor mount
Site Visitation Log Entry
=========================
Tech: SS
Weather:
TRH mounted. Running properly
- 14: VISIT_LOG, Site 3, Mon 7-Apr-1997 21:46 GMT, fix sonic and charger
Site Visitation Log Entry
=========================
Tech: SS
Weather: windy, cold
fix sonic problem. Solar panel charging is still unknown. Will switch batteries.
- 8: VISIT_LOG, Site 3, Sun 6-Apr-1997 21:39 GMT,
Site Visitation Log Entry
=========================
Tech: SO
Weather: windy!
Station Service Performed
=========================
Load Config
This is setup. Batteries:AB3 &ABS4. ATI: 2. KRYPTON: 1133. Everest: 3577-3.
Wnd Sensor: 00319. Baro: 1005. Goes running, can not talk to sonic, can not talk to wind sensor over bus but data coming in. Wind sensor direction looked good with boom alignment.