- 259: VISIT_LOG, Site 1, Sun 25-May-1997 16:07:26 GMT, Teardown
Author : CJ
date 5/23
Assman IC:
Tdry Twet Rh Pres Tst. Rhst.
18.7c. 15.11c. 68.94% 962.24 18.79c. 70.72%
Pressure Paro = 962.24mb
station= 962.26mb
rain ic MRI # 36 Tips = 97
soil Trime = 25.5% (15:00gmt)
- 213: VISIT_LOG, Site 1, Thu 15-May-1997 15:59 GMT, Routine
Site Visitation Log Entry
=========================
Tech: CJ
Weather: sunny som high cirrus calm warm
Sensor Maintenance Performed
============================
Assman IC
Baro IC
Soilm IC
Soil Mois IC
Assman IC Record Sampled at: 16:41
================
ID Tdry rh Twet Pressure
Assman 20.47 36.3 12.11
PAM Trh 3 20.22 39.4 965.2
Samples: 10
Comments: N ot enough aspiration (wind at times results in high readings
Barometer IC Record Sampled at: 16:01
===================
ID Pressure
IC Unit 37039 965.14
PAM 1 965.15
Comments:
Soil Moisture IC Record Sampled at: 16:06
=======================
IC Reading: 35.60
PAM Reading: .44
PAM raw Reading: 1.3200
Comments:
- 192: VISIT_LOG, Site 1, Sat 10-May-1997 21:29 GMT,
Site Visitation Log Entry
=========================
Tech: JM
Weather:
Sensor Maintenance Performed
============================
Krypton work
TRH Clean
- 182: VISIT_LOG, Site 1, Thu 8-May-1997 19:46 GMT, Routine
Site Visitation Log Entry
=========================
Tech: MM
Weather: breezy from NNW. scattered alto-str-Q
Sensor Maintenance Performed
============================
Baro IC
Assman IC
Soil Mois IC
Assman IC Record Sampled at: 20:05
================
ID Tdry rh Twet Pressure
Assman 20.56 38.2 12.48
PAM Trh 3 20.55 40.3 965.6
Samples: 10
Comments: sun was behind cloud during test. Assm. upwind of hygth.
Barometer IC Record Sampled at: 19:50
===================
ID Pressure
IC Unit 37039 965.55
PAM 0 965.51
Comments: Not too bad..
Photos taken. ICs baro, trh, soil.
Krypton cleaned, plugged back in.
Sonic boom height = 94"; Gill sonic 22" above boom;
Krypton 24" "behind" sonic.
Obvious dirt on net rad domes; cleaned both netrad and soldn at about 3:15 local.
- 156: VISIT_LOG, Site 1, Fri 2-May-1997 20:29 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: EK
Weather: overcast windy mild rain
Sensor Maintenance Performed
============================
Krypton work unbag and clean
Soil Mois IC
Soil Moisture IC Record Sampled at: 20:35
=======================
IC Reading: 36.40
PAM Reading: .44
PAM raw Reading: 1.3100
Comments:
- 144: VISIT_LOG, Site 1, Thu 1-May-1997 17:08 GMT, Krypton bag
Site Visitation Log Entry
=========================
Tech: EK
Weather:
anemometer mast heigh =94 inches
- 128: VISIT_LOG, Site 1, Mon 28-Apr-1997 20:50 GMT,
Site Visitation Log Entry
=========================
Tech: EK
Weather:
- 115: VISIT_LOG, Site 1, Sun 27-Apr-1997 19:23 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: SO
Weather:
Sensor Maintenance Performed
============================
Krypton Work
more forcibly cleaned than what Errol just did.
Increased krypton voltage to 1.8
- 114: VISIT_LOG, Site 1, Sun 27-Apr-1997 18:50 GMT, Krypton,Krypton ,,Krypton ,unbag and glop
Site Visitation Log Entry
=========================
Tech: EK
Weather: overcast
krypton before 975 after 1347
baro - no errors
- 107: VISIT_LOG, Site 1, Sat 26-Apr-1997 18:24 GMT, barometer problem
Site Visitation Log Entry
=========================
Tech: EK
Weather: overcast and drippy
Sensor Maintenance Performed
============================
Comp. Chg
Component Change
================
Barometer Component: Change Old s/n: S0610001 New s/n: S0610002
Success? Y
Comments:
Swapped baro with st 3
baro nuts need to be tightened
- 90: VISIT_LOG, Site 1, Wed 23-Apr-1997 19:01 GMT, routine visit
Site Visitation Log Entry
=========================
Tech: MM
Weather: regenerated log report
Sensor Maintenance Performed
============================
Assman IC
Baro IC
Rain Check
Soil Mois IC
Assman IC Record Sampled at: 19:52
================
ID Tdry rh Twet Pressure
Assman 15.26 37.3 8.27
PAM Trh 3 15.03 39.3 956.8
Samples: 11
Comments: hand held assman over head
Barometer IC Record Sampled at: 19:36
===================
ID Pressure
IC Unit 37039 956.81
PAM 1 956.77
Comments: ok
Rain Gauge Check Record Sampled at: 19:23
=======================
Gauge Type: MRI S/N: 3 Reading: 102 Expected: 100
Comments: good--dripped slower than st1 visit
Soil Moisture IC Record Sampled at: 19:15
=======================
IC Reading: 34.70
PAM Reading: .42
PAM raw Reading: 1.3000
Comments: 36.7+35.3(45deg angle)+32.2(angle)
Reloaded config to move GOES from chan 117 to chan 125
baro was dead. unplugged it and it came back. Probably was in a strange
comm mode.
CS615 Id: 8688, LT#417624
- 71: VISIT_LOG, Site 1, Mon 21-Apr-1997 19:49 GMT, Data Retrieval
Site Visitation Log Entry
=========================
Tech: SS
Weather:
Station Service Performed
=========================
Offload Data
- 56: VISIT_LOG, Site 1, Sat 19-Apr-1997 21:48 GMT, setup work
Site Visitation Log Entry
=========================
Tech: SS
Weather: sunny, light winds from the SE
Level sonic. Shot boom angles. Sonic: along NE (low) to SW (high) vector, 212 24 05; prop: 331 35 48. Loaded boom angle for prop.
- 47: VISIT_LOG, Site 1, Fri 18-Apr-1997 19:28 GMT, sonic problem
Site Visitation Log Entry
=========================
Tech: MM
Weather: warm and darn windy
Sensor Maintenance Performed
============================
Comp. Chg
Soil Mois IC
Component Change
================
TRH Component: Install Old s/n: NA New s/n: 3
Success? Y
Comments:
crossarm inserts don't have indents for set screws.
Sonic was giving lots of bad values.
U wind was -328 m/s--it's windy, but not like that.
Also c was varying between 4 m/s and normal values
Tried restarting data collection. No effect. Removed amp connector at box.
Waited a few seconds, and then reinstalled it. Sonic seemed to be happy.
CS615 s/n 8688.
Soil moisture IC took 3 trime readings 37.6, 37.5 (at 45 deg angle) and 35.5
CS615 =1.368 raw and 49% PCT vol
- 40: VISIT_LOG, Site 1, Thu 17-Apr-1997 17:59 GMT, Communication problem
Site Visitation Log Entry
=========================
Tech: MM
Weather: sunny and nice
Station Service Performed
=========================
Load Config
Offload Data
Sensor Maintenance Performed
============================
Soil Sample
Rad Work
Saw bizarre load/power/voltage data. A/D problem?
actually, it was probably during a transmit.
NOTE: station visit times from here and the previous visit to st 2 are MDT not GMT
- 34: VISIT_LOG, Site 1, Tue 15-Apr-1997 00:15 GMT, eve problem
Site Visitation Log Entry
=========================
Tech: SO
Weather: breezy
Station Service Performed
=========================
Load Config
loaded Matt's new sta001.dat and tested for flux sync errors by playing
with the cpu clock - it didn't seem to help.
- 27: VISIT_LOG, Site 1, Sat 12-Apr-1997 17:25 GMT, fence, mount krypton,rad,fence, mount krypton,rad
Site Visitation Log Entry
=========================
Tech: SS
Weather: cold, windy
- 20: VISIT_LOG, Site 1, Wed 9-Apr-1997 20:12 GMT, setup
Site Visitation Log Entry
=========================
Tech: SS
Weather:
power: 9.5 forward, 0 reflexed. batteries: abs-3 & 4. MRI: 36.