- 260: VISIT_LOG, Site 2, Sun 25-May-1997 16:12:27 GMT, Teardown
Author CJ
date 5/23
Assman Ic
Tdry Twet Pres Tst. RHst.
21.86c. 17.27c. 960.21 22.32 64.91
pres Paro = 960.15mb
st = 960.21mb
rain MRI#2 100tips
ETI 058 no ic cable eaten by cows
trime 32.7% (18:03gmt)
- 216: VISIT_LOG, Site 2, Thu 15-May-1997 17:18 GMT, Routine
Site Visitation Log Entry
=========================
Tech: CJ
Weather: light clouds, n breeze warm
Sensor Maintenance Performed
============================
Assman IC
Baro IC
Soilm IC
Soil Mois IC
Assman IC Record Sampled at: 17:38
================
ID Tdry rh Twet Pressure
Assman 21.27 31.5 11.95
PAM Trh 2 21.11 34.2 963.2
Samples: 10
Comments: held assman into wind
Barometer IC Record Sampled at: 17:21
===================
ID Pressure
IC Unit 37039 963.14
PAM 3 963.14
Comments:
Soil Moisture IC Record Sampled at: 17:24
=======================
IC Reading: 35.50
PAM Reading: 2.52
PAM raw Reading: 2.7900
Comments:
Down load data Messed up one transmission. watt meter plugged into UHF .
- 181: VISIT_LOG, Site 2, Thu 8-May-1997 17:22 GMT, Routine
Site Visitation Log Entry
=========================
Tech: MM
Weather: Breezy (NE), rain last night, alto-strat
Sensor Maintenance Performed
============================
Baro IC
Assman IC
Soil Mois IC
Assman IC Record Sampled at: 17:51
================
ID Tdry rh Twet Pressure
Assman 18.84 54.1 13.31
PAM Trh 2 19.41 54.3 963.2
Samples: 11
Comments: sun came out during later readings. maybe problems, do again...
Assman IC Record Sampled at: 18:19
================
ID Tdry rh Twet Pressure
Assman 20.36 45.7 13.42
PAM Trh 2 20.66 49.4 962.9
Samples: 11
Comments: manually held assm. I was upwind of Hygth, downwind of Assm.
Barometer IC Record Sampled at: 17:25
===================
ID Pressure
IC Unit 37039 963.15
PAM 3 963.15
Comments: Not bad.....
Soil Moisture IC Record Sampled at: 18:03
=======================
IC Reading: 40.30
PAM Reading: 2.51
PAM raw Reading: 2.7800
Comments: taken adjacent rain gauge, sensors are s. of rad stand
ICs taken: baro, soil, trh.
Rnet leveled, was off by about 1/2 bubble high to NE. Domes were OK.
Soil sample taken.
Photos taken. Krypton plugged back in and cleaned.
Sonic boom height = 92 in agl; krypton 23 in "behind" sonic.
- 157: VISIT_LOG, Site 2, Fri 2-May-1997 21:32 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: EK
Weather: overcast very windy
Sensor Maintenance Performed
============================
Krypton unbag and clean
Soil Mois IC
Soil Moisture IC Record Sampled at: 21:38
=======================
IC Reading: 36.30
PAM Reading: 2.45
PAM raw Reading: 2.7500
Comments:
this is the real 2 the other is st1
- 146: VISIT_LOG, Site 2, Thu 1-May-1997 17:43 GMT, Krypton bag
Site Visitation Log Entry
=========================
Tech: EK
Weather:
aneometer height = 94 inche
- 135: VISIT_LOG, Site 2, Wed 30-Apr-1997 17:44 GMT, Routine,
Site Visitation Log Entry
=========================
Tech: EK
Weather: overcat and very windy
Sensor Maintenance Performed
============================
Baro IC
Assman IC
soil core
Soil Mois IC
Assman IC Record Sampled at: 17:54
================
ID Tdry rh Twet Pressure
Assman 11.66 60.0 7.86
PAM Trh 2 12.25 60.5 950.4
Samples: 10
Comments:
Barometer IC Record Sampled at: 17:45
===================
ID Pressure
IC Unit 37039 949.90
PAM 3 950.26
Comments:
Soil Moisture IC Record Sampled at: 18:17
=======================
IC Reading: 29.30
PAM Reading: 2.10
PAM raw Reading: 2.5600
Comments:
- 113: VISIT_LOG, Site 2, Sun 27-Apr-1997 18:43 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: EK
Weather:
Sensor Maintenance Performed
============================
Krypton Work
unbag and clean krypton
disconnected while cleaning
changed voltage from 0.9 to 1.9 V
- 86: VISIT_LOG, Site 2, Wed 23-Apr-1997 17:35 GMT, routine visit
Site Visitation Log Entry
=========================
Tech: MM
Weather: regenerated log report
Sensor Maintenance Performed
============================
Assman IC
Baro IC
Rain Check
Soil Mois IC
Assman IC Record Sampled at: 18:28
================
ID Tdry rh Twet Pressure
Assman 14.40 40.4 7.97
PAM Trh 2 14.13 44.8 955.6
Samples: 11
Comments: hand held assman above head
Barometer IC Record Sampled at: 17:48
===================
ID Pressure
IC Unit 37039 955.73
PAM 3 955.71
Comments:
Rain Gauge Check Record Sampled at: 18:04
=======================
Gauge Type: MRI S/N: 2 Reading: 95 Expected: 100
Comments: not bad
Rain Gauge Check Record Sampled at: 18:11
=======================
Gauge Type: ETI S/N: Reading: 43 Expected: 44
Comments: OK
Soil Moisture IC Record Sampled at: 18:03
=======================
IC Reading: 36.00
PAM Reading: 2.29
PAM raw Reading: 2.6600
Comments: rocky soil. 38.4+33.7(40 deg angle)=36 avg
Changed config to move GOES chan from 117 to 125
- 55: VISIT_LOG, Site 2, Sat 19-Apr-1997 20:10 GMT, Setup
Site Visitation Log Entry
=========================
Tech: SS
Weather: sunny, light winds from the east
Leveled sonic. Shot angles for sonic and prop. Sonic: along NE (low) to SW (high) vector, 219 31 45; Prop: 334 28 42. Installed mount plate for campbell box on rad stand. Loaded prop angle. Put new bag around Krypton.
- 48: VISIT_LOG, Site 2, Fri 18-Apr-1997 20:29 GMT, Install TRH
Site Visitation Log Entry
=========================
Tech: MM
Weather: warm and windy, very windy
Sensor Maintenance Performed
============================
Comp. Chg
Component Change
================
TRH Component: Install Old s/n: NA New s/n: 2
Success? Y
Comments:
OK
Installed Trh sensor.
RMY boom direction was not set
.
Took soil moisture IC with trime
Took 2 readings: 37.6 and 39.3
CS615 raw=2.784 cal=251.3% WRONG!
Did I mention it was windy?
- 39: VISIT_LOG, Site 2, Thu 17-Apr-1997 16:34 GMT, Station dead
Site Visitation Log Entry
=========================
Tech: MM
Weather: sunny and light winds
Station Service Performed
=========================
Load Config
Offload Data
Sensor Maintenance Performed
============================
Soil Sample
Rad Work
This station was programmed as station 1!!!
I guess that's why it disappeared from the air.
Loaded new config with different delay stuff.
soil moisture probe s/n 002
Levelled rad stand.
Checked level of sol_dn and netrad
NOTE: The offloaded data needs to have the station changed to 2
- 30: VISIT_LOG, Site 2, Sat 12-Apr-1997 20:30 GMT, mount krypton, fence,mount krypton, fence
Site Visitation Log Entry
=========================
Tech: SS
Weather:
- 19: VISIT_LOG, Site 2, Wed 9-Apr-1997 16:16 GMT, setup
Site Visitation Log Entry
=========================
Tech: SS
Weather: cold and windt, overcast
goes xmt:12.5 watts forward, 0 reflexed
- 18: VISIT_LOG, Site 2, Wed 9-Apr-1997 13:50 GMT,
Site Visitation Log Entry
=========================
Tech:
Weather: