- 255: VISIT_LOG, Site 4, Sat 24-May-1997 15:20 GMT, Teardown
Site Visitation Log Entry
=========================
Tech: CJ
Weather:
Sensor Maintenance Performed
============================
Baro IC
Zeroing of ATI w axis 15:20, u axis 15:32 v axis 15:42, 16:10:16:20
- 253: VISIT_LOG, Site 4, Fri 23-May-1997 20:45 GMT, Teardown
Site Visitation Log Entry
=========================
Tech:
Weather: CLOUDY WARM WINDY
Sensor Maintenance Performed
============================
Assman IC
Baro IC
Rain Check
Soilm IC
Soil Mois IC
Assman IC Record Sampled at: 21:18
================
ID Tdry rh Twet Pressure
Assman 24.80 61.0 19.45
PAM Trh 8 24.80 62.3 969.5
Samples: 10
Comments:
Barometer IC Record Sampled at: 20:47
===================
ID Pressure
IC Unit 37039 969.63
PAM 1 969.73
Comments: final ic
Rain Gauge Check Record Sampled at: 20:59
=======================
Gauge Type: MRI S/N: 13 Reading: 97 Expected: 100
Comments:
Soil Moisture IC Record Sampled at: 21:20
=======================
IC Reading: 34.80
PAM Reading: .89
PAM raw Reading: 1.7400
Comments:
See ya
- 243: , Site 4, Tue 20-May-1997 22:56:06 GMT, gps readings taken at site 4
gps readings taken at site 4 at 20:30 for 1 hour
- 240: SONIC, Site 4, Tue 20-May-1997 22:31:08 GMT, ati sonic was being interfered with by pam guy wire
the guy wire was caught against the "v" vector of the ati sonic - the ati
was freed at 20:35
- 231: VISIT_LOG, Site 4, Mon 19-May-1997 15:43 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: C
Weather: overcast, windy, muddy, cool
Sensor Maintenance Performed
============================
Soil Mois IC
Soil Moisture IC Record Sampled at: 16:12
=======================
IC Reading: 38.40
PAM Reading: 1.00
PAM raw Reading: 1.8300
Comments:
Krypton died during rain last night. Power to it was OK. ad board OK per
shorting plug. It's dead.
Measurement from ati-sonic W = 19.5", Height=123"
- 183: VISIT_LOG, Site 4, Fri 9-May-1997 13:50 GMT, Routine
Site Visitation Log Entry
=========================
Tech: JM
Weather: cool, high cirrus, lt brz from N/NE
Sensor Maintenance Performed
============================
Baro IC
Soil Mois IC
Assman IC
Assman IC Record Sampled at: 14:03
================
ID Tdry rh Twet Pressure
Assman 11.05 60.2 7.43
PAM Trh 8 10.83 65.4 985.4
Samples: 11
Comments: sun atten by hi cirrus. hung assm. 1-5 over b/e-boxes held 6-10
Assman IC Record Sampled at: 16:01
================
ID Tdry rh Twet Pressure
Assman 11.80 56.5 7.70
PAM Trh 8 11.84 58.6 985.4
Samples: 1
Comments:
Barometer IC Record Sampled at: 13:50
===================
ID Pressure
IC Unit 37039 985.50
PAM 1 985.43
Comments:
Soil Moisture IC Record Sampled at: 13:52
=======================
IC Reading: 37.80
PAM Reading: .87
PAM raw Reading: 1.7200
Comments:
Krypt plugged back in.
Baro, trh, soil IC. Note Assman check first was hung on xarm over elec/batt box area; readings higher than trh, maybe a bit of sun on thermom. shafts. Last 5 readings i held it by hand toward horizon and shaded the shafts; readings
consistent. IMHO, hanging of assman isn't best approach and causes slight offsets.
Downloaded data.
- 173: VISIT_LOG, Site 4, Tue 6-May-1997 19:02 GMT, Krypton,Data Retrieval
Site Visitation Log Entry
=========================
Tech: MM
Weather: starting to sprinkle
Sensor Maintenance Performed
============================
Unplugged Krypton
got all pcmcia data
- 167: VISIT_LOG, Site 4, Mon 5-May-1997 16:35 GMT, No good reason
Site Visitation Log Entry
=========================
Tech: EK
Weather: clear, breezy
Sensor Maintenance Performed
============================
Rad Work
leveled Q7 (rnet). It was slanted to the west
- 155: VISIT_LOG, Site 4, Fri 2-May-1997 19:03 GMT, Krypton
Site Visitation Log Entry
=========================
Tech: EK
Weather: overcast and windy
Sensor Maintenance Performed
============================
Krypton work bag and clean
Soil Mois IC
Soil Moisture IC Record Sampled at: 19:08
=======================
IC Reading: 42.00
PAM Reading: .94
PAM raw Reading: 1.7800
Comments:
krypton 850 before 1500 after
- 148: VISIT_LOG, Site 4, Thu 1-May-1997 19:14 GMT, Krypton bag
Site Visitation Log Entry
=========================
Tech: EK
Weather:
height = 126 inches
- 137: VISIT_LOG, Site 4, Wed 30-Apr-1997 19:51 GMT, Routine
Site Visitation Log Entry
=========================
Tech: EK
Weather: sunny limoderate wind
Sensor Maintenance Performed
============================
Baro IC
Assman IC
Soil Mois IC
Assman IC Record Sampled at: 20:01
================
ID Tdry rh Twet Pressure
Assman 16.77 26.4 7.97
PAM Trh 8 16.83 27.6 965.1
Samples: 10
Comments:
Barometer IC Record Sampled at: 19:55
===================
ID Pressure
IC Unit 37039 964.80
PAM 1 965.04
Comments:
Soil Moisture IC Record Sampled at: 20:17
=======================
IC Reading: 33.00
PAM Reading: .78
PAM raw Reading: 1.6400
Comments:
- 127: VISIT_LOG, Site 4, Mon 28-Apr-1997 20:35 GMT, No good reason
Site Visitation Log Entry
=========================
Tech: MM
Weather: steady southerly wind, high clouds
This station has an old baro s/n NCAR0001
Checked baro config:
Enter parity (E, O, N) [N]->
Opening communications to "/tyCo/1". Type a D when done
Software version PTB220 / 1.01
Serial number N0000001
Linear adjustments ON
Multipoint adjustments ON
Calibration date ????-??-??
Baud Parity Data Stop Dpx 9600 N 8 1 F
Echo OFF
Sending mode POLL / CLOSE
Address 1
Output interval 5 s
Output format "B1 " 4.2 P1 " " 3.1 T1 " " #r #n
Pressure unit mbar
Av
- 110: VISIT_LOG, Site 4, Sun 27-Apr-1997 15:28 GMT, unbag krypton
Site Visitation Log Entry
=========================
Tech: EK
Weather: sunny weather is improving
this happened just a few minutes ago
- 102: VISIT_LOG, Site 4, Fri 25-Apr-1997 21:39 GMT, Routine,Site Photos
Site Visitation Log Entry
=========================
Tech: MM
Weather: cold windy etc
Station Service Performed
=========================
Reboot EVE
Load Config
Sensor Maintenance Performed
============================
Assman IC
Soil Mois IC
Rain Check
Baro IC
Assman IC Record Sampled at: 22:22
================
ID Tdry rh Twet Pressure
Assman 14.97 39.2 8.35
PAM Trh 8 14.49 39.7 977.8
Samples: 10
Comments: ok
Barometer IC Record Sampled at: 22:08
===================
ID Pressure
IC Unit 37039 978.05
PAM 1 978.06
Comments: OK
Rain Gauge Check Record Sampled at: 22:05
=======================
Gauge Type: MRI S/N: 13 Reading: 102.5 Expected: 100
Comments: nice
Soil Moisture IC Record Sampled at: 22:03
=======================
IC Reading: 33.10
PAM Reading: .76
PAM raw Reading: 1.6300
Comments: Avg of two readings. Soil crusty on top
loaded new config--old one had wrong krypton s/n 1089 ==> 1101
Got 360 deg photos and digital shots
- 64: VISIT_LOG, Site 4, Sun 20-Apr-1997 19:23 GMT, No good reason
Site Visitation Log Entry
=========================
Tech: MM
Weather: mostly clear, breezy NW winds
Station Service Performed
=========================
Shoot boom angles
Sensor Maintenance Performed
============================
Soil Mois IC
Soil Moisture IC Record Sampled at: 19:28
=======================
IC Reading: 36.10
PAM Reading: .86
PAM raw Reading: 1.7100
Comments: Crusty on top. Used TRIME hole starter
Soil Moisture IC Record Sampled at: 19:32
=======================
IC Reading: 34.50
PAM Reading: .86
PAM raw Reading: 1.7100
Comments: TRIME at 45 deg angle. Used starter rods
Measured prop angle with DataScope: 144.2 deg
Shot again from other side of boom: 324.3
Shot ATI: 57.1
RED ALERT: prop angle is set to 337!
Either compass mag north is off, or I can't shoot very well.
- 58: VISIT_LOG, Site 4, Sat 19-Apr-1997 23:25 GMT, setup
Site Visitation Log Entry
=========================
Tech: SS
Weather: sunny, light winds from the SE
Sensor Maintenance Performed
============================
Rad Work
TRH Work
Mount TRH sensor. Add ground straps to ATI box and Campbell box. Soldn mounted and leveled.
- 43: VISIT_LOG, Site 4, Thu 17-Apr-1997 21:09 GMT, zero sonic, shoot angle
Site Visitation Log Entry
=========================
Tech: KK
Weather: sunny, windy
zeroed sonic, shot angles - prop boom 336 32 30 sonic 249 53 15
note - mast slighty twisted
- 38: VISIT_LOG, Site 4, Thu 17-Apr-1997 13:55 GMT, fix soil moisture
Site Visitation Log Entry
=========================
Tech: SS
Weather:
wire loose in campbell.
- 28: VISIT_LOG, Site 4, Sat 12-Apr-1997 18:13 GMT, Setup
Site Visitation Log Entry
=========================
Tech: SO
Weather: windy, overcast, cold
innstall krypton, rad, soil
krypt #1101, but bagged
will give 10 MRI tips
- 23: VISIT_LOG, Site 4, Thu 10-Apr-1997 20:11 GMT, Setup
Site Visitation Log Entry
=========================
Tech: SO
Weather: ovc; light wind; allmost warm!
GOES power: 9.6W forward, 0.0W back
Batteries: Decka 3,4