Following is a rough chronology of SGS setup:
Tuesday, August 22
Steve Semmer on site, Tom Horst arrived mid-afternoon.
TH previewed site
Wednesday, August 23
Kurt Knudson arrived mid-afternoon.
TH surveyed ground cover of fields
Thursday, August 24
Marc Parlange, Jan Kleissl arrived mid-afternoon.
TH re-surveyed ground cover
Friday, August 25
Selected site; moved PAM towers from Hanford storage to field site;
began to assemble PAM tripods and masts (TH, MP, JK).
Saturday, August 26
Finished PAM assembly, assisted with EBEX tear down
Sunday, August 27
Packed base trailer, tested Breezecom communications
Monday, August 28
Gordon Maclean arrived mid-morning
Moved base trailer, surveyed and staked array (TH & JK)
Tuesday, August 29
Staked towers in place (TH & MP); brought ADAMs to field site
Wednesday, August 30
Marc took ISCAT box to Port Hueneme; surveyed array angles (TH & SS);
mounted CSAT sonics on PAM/ASTER towers (TH, MP, JK)
Thursday, August 31
Configured CSAT sonics, raised PAM towers, oriented CSAT sonics
Raised ASTER profile towers, instrumented and raised AB towers
Friday, September 1
Steve Semmer left mid-day.
Instrumented prop tower, replaced generator fuel tank, assembled array #4
Saturday, September 2
Raised ASTER CSAT tower, array #4
Sunday, September 3
Kurt Knudson, Marc Parlange, Jan Kleissl leave mid-day.
<><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><>
NCAR ATD
Tom Horst, Edgewater Apt 645C, 559-589-9535
cell 303-994-5998
Gordon Maclean, Edgewater Apt 673A, 559-589-9561
cell 303-994-5997
Charlie Martin
John Militzer
Steve Semmer, Best Western Hanford #114, 559-583-7300
Kurt Knudson, Best Western Hanford #212, 559-583-7300
NCAR MMM
Chin-Hoh Moeng, Edgewater Apt 611F, 559-582-4217
Peter Sullivan
Jeff Weil
Don Lenschow
JHU
Marc Parlange, Edgewater Apt 673D, 559-589-1195
cell 443-255-2204
Jan Kleissl
Charles Meneveau
UCLA
Bjorn Stevens