Entry | Date | Title | Site | Author | #Graphics |
---|---|---|---|---|---|
147 | Wed 19-Feb-2003 | thermocouples running | sage | semmer | |
144 | Tue 18-Feb-2003 | Thermocouples at Sage | sage | semmer |
The thermocouples are now working at Sage. The data path is freewave to the tower then through channel 211 of cosmos.
Juilen set up her thermocouple array out at Sage today. The Freewave interface was tested in the base and worked ok. Tomorrow the Freewave will be moved out to the tower and connected up to a serial channel on cosmos.