- 142: Logistics, Site tower, Tue 18-Feb-2003 17:23:04 MST, Guy tensions checked
Between 13:30 and 14:15 checked all guy tensions.
Noted tensions in logbook # 2
- 141: Logistics, Site tower, Tue 18-Feb-2003 17:18:38 MST, Tower beacon
At noon we climbed to the top of the tower and installed the red blinking beacon
AC power from the 20m ADAM power box.
Beacon operating
Still operating at 17:30
- 74: Logistics, Site tower, Tue 17-Dec-2002 17:04:58 MST, electric fence ok
We see 5000V at the main tower electric fence.
- 8: Logistics, Site base, Mon 04-Nov-2002 09:05:11 MST, PHONE #'s
Base Phones:
Per Century Tel Active 11/02/02 through 04/30/03.
Same phone numbers as last year:
970-723-3251 voice
970-723-3253 data
Includes direct distance dialing.
Other:
Mark Lanier @ Reserve:
970-723-8202 ext 5
KK Cell 303-579-1130
- 6: Logistics, Site lake, Fri 11-Oct-2002 15:12:18 MDT, Lake Site Visit : + Boom Angles
10/10/02
Site Visit:
Krypton Added, s/n 1393, using IHOP config.
Baro hose Added
Echo probes rotated. Echo 'c' fixed
Rnet installed: Not working due to logger program problem.
Logger Cable installed
Photos Taken.
Angles Taken.
Angles NOTE: the assumed declination is 11.5-east. The readings were
adjusted up to account for the settings of the compass (8.5E,
so added 3 / rounded) and the data-scope(6E so added 5.5 / rounded)
Data-Scope Compass
CSAT 90 91 (Looking at sensor from west)
RAD 90 90 (Looking at tripod from west)
PowerTower to PAM 230 229 (approx. mast-mast angle)
PowerTower to Rad 180 180 (approx. centers of structures)
Sonic to Rad 110 (Approx. from sensor to near
side of sawhorse)
- 5: Logistics, Site sage, Fri 11-Oct-2002 14:53:21 MDT, Sage Site Visit : + Boom Angles
10/10/02
Site Visit:
Krypton Added, s/n 1133, using IHOP config.
Serializer Added: sonic running at 20hz
Baro hose Added
Echo probes rotated.
GOES antenna (yaggi) angle adjusted slightly to correct setting
Rnet installed: Not working due to logger program problem.
Photos Taken.
Angles Taken.
Angles NOTE: the assumed declination is 11.5-east. The readings were
adjusted up to account for the settings of the compass (8.5E,
so added 3 / rounded) and the data-scope(6E so added 5.5 / rounded)
Data-Scope Compass
CSAT 95 92 (Looking at sensor from west)
RAD 90 90 (Looking at tripod from west)
PowerTower to PAM 257 253 (approx. mast-mast angle)
PowerTower to Rad 204 199 (approx. centers of structures)
Sonic to Rad 150 (approx. from sensor to near
side of sawhorse)
- 2: Logistics, Site tower, Fri 11-Oct-2002 10:29:39 MDT, GUY WIRE TENSIONS
Guy wire tensions on the tall (114'/35m) tower are as follows
Note: Guy Wire Numbers are BOTTOM to TOP
Notes:
- 10/03/02 Readings taken before adjustments and tower raised.
- 10/10/02 Readings taken in a stiff S-SW wind @ >6m/s at sfc.
I could see the tensions changing (30-40) along with the velocity.
- 11/20/02 Readings taken in calm air.
- 1/6/03 Readings taken in calm air.
- 2/18/03 dead calm, Tony Delany
2002 2003....
Date 10/3 10/4/02 10/10/02 11/20? 12/16 1/6 1/27 2/18
Tensiometer (#1) (#2) (#2) (#1)(#2)
Array Guy#
----- --- --- ---- ---- ---- ---- ---- ---- ---- -----
NE 1 (bot) 390 620 630 540 640 650 575 600 450 540
2 390 580 590 550 600 600 500 660 425 480
3 390 590 590 570 600 610 510 640 430 480
4 500 510 450 450 460 400 420 510 470
5 (top) 560 550 500 480 49 430 430 550 510
SE 1 380 610 650 550 600 610 575 620 520 500
2 350 725 750 690 700 700 660 610 580 560
3 460 680 710 690 630 640 610 590 520 490
4 550 550 470 450 450 450 410 600 510
5 510 510 470 400 420 415 360 500 500
SW 1 360 630 630 550 600 610 575 600 540 510
2 380 590 610 560 510 530 505 470 470 450
3 410 630 650 630 600 590 575 490 500 440
4 610 630 575 490 500 625 420 580 510
5 590 610 610 475 470 450 360 600 490
NW 1 400 600 610 510 560 580 490 550 440 440
2 350 690 710 680 660 650 600 590 500 530
3 480 730 770 710 690 700 600 560 570 580
4 680 680 630 560 550 475 490 610 640
5 550 550 520 440 450 390 340 520 490