CHATS: Logbook Entries

CHATS: Site 30m tower Messages, 146 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
373 Mon 25-Jun-2007Height of 14 m sonic30m towerpatton
371 Fri 22-Jun-2007sensor serial numbers, 30 m tower30m towerpatton
370 Sun 10-Jun-2007PAR sensor heights30m towerpatton
369 Sun 10-Jun-2007Investigated Tcase.out.16m30m towerhorst
368 Sun 10-Jun-2007disconnected sonic splitters30m towerhorst
366 Sun 10-Jun-2007Tcase.out.16m intermittently bad30m towerhorst
363 Fri 08-Jun-20071.5m TRH out for about 7 hours30m towerpatton
360 Fri 08-Jun-20071.5 m kh2o on vertical tower replaced30m towerhorst
358 Thu 07-Jun-2007tower climbing30m towerpatton
355 Wed 06-Jun-2007installed TRH at 3m on tower30m towermaclean
352 Wed 06-Jun-2007Removed ACD CPC instrument from vertical tower30m towerhorst
345 Tue 05-Jun-2007fuse blown on tower transformer30m towermaclean
344 Tue 05-Jun-2007power to WSU SF630m towermaclean
343 Mon 04-Jun-2007cleaned kh2o30m towerhorst
342 Mon 04-Jun-2007cleaned sawhorse radiometers30m towerhorst
340 Mon 04-Jun-2007Sonic configurations for vt30m towerhorst
338 Mon 04-Jun-2007WSU arrived today30m towerhorst
331 Fri 01-Jun-2007ACD power load / WSU Drop30m towermilitzer
330 Fri 01-Jun-2007Scintillometer removed: Tower climbed30m towermilitzer
329 Fri 01-Jun-2007HF tower Pocketec swapped: Tower climbed30m towermilitzer
324 Thu 31-May-2007Scintillometer electronics removed: tower climbed30m towermilitzer
323 Thu 31-May-2007tower rad cleaned again: tower climbed30m towermilitzer
322 Thu 31-May-2007rad stand battery swap30m towermilitzer
321 Thu 31-May-2007Soil Sample - trime + gravimetric30m towermilitzer
320 Wed 30-May-2007rad cleaning30m towermilitzer
309 Mon 28-May-2007Par sensors installed, tower climbed, restart lower data system30m towermilitzer
305 Sun 27-May-2007Changed electronics box of k.14m - tower climb, and other activity30m towerpoulos
302 Sat 26-May-2007PAR sensor work, tower climb30m towerpoulos
301 Sat 26-May-2007Cycled k.14m (S7, upper), inadvertant others30m towerpoulos
300 Sat 26-May-2007Odd behavior in kh2o.7.5m overnight30m towerpoulos
299 Sat 26-May-2007T/RH.6m fan may be failing30m towerpoulos
298 Sat 26-May-2007sonic.9m possibly low?30m towerpoulos
297 Sat 26-May-2007hftower started/triple films installed30m towerpoulos
296 Sat 26-May-2007Tower kryptons cleaned/checked30m towerpoulos
295 Sat 26-May-20071.5m kh2o 'misaligned'30m towermilitzer
286 Wed 23-May-2007hftower down for spraying, tower climbed30m towermilitzer
284 Wed 23-May-20076m trh swapping, tower climbed30m towermilitzer
282 Tue 22-May-2007Exchange TRH.6m30m towerpoulos
280 Tue 22-May-2007T/RH exchange 6 with 7.5m due to oscillation30m towerpoulos
276 Mon 21-May-2007Rlw.16m problem - seems to be in the web plots only30m towerpoulos
275 Mon 21-May-2007branches cut away from Rnet30m towermilitzer
274 Mon 21-May-200714m Kh2o head only swapped30m towermilitzer
273 Mon 21-May-20071.5m TRH swapped30m towermilitzer
272 Mon 21-May-2007Tower Climbed: branches, kh2o30m towermilitzer
270 Sun 20-May-2007Exchange of 1.5m and 3.0m T/RH completed30m towerpoulos
269 Sun 20-May-2007lw.out exceeding 800W30m towerpoulos
267 Sat 19-May-2007mixing ratio profile, that was in question, less so due to ACD h2o profile confirmation30m towerpoulos
266 Sat 19-May-2007Tower Climbing: Scintillometer work30m towermilitzer
262 Sat 19-May-200714m Kh2o bad / recycled power30m towermilitzer
259 Fri 18-May-2007hftower down and now up again - tower climb30m towermilitzer
258 Fri 18-May-2007Tower climbing30m towerpoulos
253 Fri 18-May-2007Soil Sample - trime + gravimetric30m towermilitzer
250 Thu 17-May-2007hftower pocketec exchanged ... again30m towerpoulos
249 Thu 17-May-2007Tower Climbed: hftower swap pocketec30m towermilitzer
247 Thu 17-May-2007Tall Tower Climbed: scintillometer30m towermilitzer
243 Wed 16-May-2007Tall Tower climbed, installed sodar repeater30m towermilitzer
239 Tue 15-May-2007T.3m - 0.05-0.15 noise in 1 second data - since at least April30m towerpoulos
236 Tue 15-May-2007Flakey 14m krypton, power cycle30m towermilitzer
235 Tue 15-May-2007Hftower Pocketec swapped30m towermilitzer
231 Tue 15-May-2007hot-film data copied, pocketecs then cleared30m towerpoulos
229 Mon 14-May-2007CPC height - John to enter30m towermilitzer
228 Mon 14-May-2007Scintilometer height - John to enter30m towermilitzer
227 Mon 14-May-2007hftower back up @ 1650LT (down at 1612LT 13 May)30m towerpoulos
224 Mon 14-May-2007CPC ingest started, lower down for ~20 min30m towerpoulos
222 Mon 14-May-2007Tower Climbing / Helicopter Ops30m towermilitzer
219 Sun 13-May-2007ACD power load / Tower DC30m towermilitzer
218 Sun 13-May-2007Sonic tee'd off to ACD (for Andy)30m towermilitzer
217 Sun 13-May-2007Kleissl scintillometer30m towermilitzer
215 Sun 13-May-2007krypton 7.5m 12 May30m towerpoulos
214 Sun 13-May-2007hftower 12 May30m towerpoulos
212 Sun 13-May-2007Camera 12 May30m towerpoulos
211 Sun 13-May-2007hftower 11 May30m towerpoulos
207 Sun 13-May-2007Oncley p' sensor disconnected May 1030m towerpoulos
205 Sun 13-May-2007TRH.9m May 1030m towerpoulos
200 Sun 13-May-2007Scintillometer work, tower climbing30m towerpoulos
199 Sun 13-May-2007Tower 14 m CPC Aerosol installed (particle counter, ACD Andy30m towerpoulos
198 Sun 13-May-2007Kryp 1.5m cleaning30m towerpoulos
195 Sat 12-May-2007Kryp.14m, 7.5m, 1.5m + cleanings30m towerpoulos
194 Sat 12-May-2007TRH.3m fan adjusted30m towerpoulos
193 Sat 12-May-2007Triple film data system - hftower and TF4 switches adjusted30m towerpoulos
191 Sat 12-May-2007ACD tubes 12 May30m towerpoulos
185 Wed 09-May-2007TRH woes30m towerhorst
183 Mon 07-May-2007rad stand battery fix30m towerknudson
178 Wed 25-Apr-2007resonance30m toweroncley
177 Wed 25-Apr-2007p' port location30m toweroncley
174 Wed 25-Apr-200714 m kh2o recovered April 2330m towerhorst
173 Tue 24-Apr-2007hfarray dead (and resurrected!)30m towermaclean
161 Sat 14-Apr-2007shut down hftower data 30m toweroncley
159 Sat 14-Apr-2007flat washer inserted30m toweroncley
158 Sat 14-Apr-2007triple probes removed30m toweroncley
155 Fri 13-Apr-2007tubing shortened30m toweroncley
153 Fri 13-Apr-2007moved port to other side of boom30m toweroncley
152 Fri 13-Apr-200716m rads cleaned30m toweroncley
151 Fri 13-Apr-2007vertical array azimuth attempt30m towerknudson
148 Fri 13-Apr-2007garden hose installed30m toweroncley
147 Thu 12-Apr-2007p' data rates lowered30m toweroncley
146 Thu 12-Apr-2007Spare quad-disk-port installed at 1m30m toweroncley
145 Thu 12-Apr-20076m TRH replaced30m toweroncley
141 Wed 11-Apr-2007more p rate changes30m toweroncley
140 Wed 11-Apr-2007p' removal instructions30m toweroncley
139 Wed 11-Apr-2007p port now upside down30m toweroncley
138 Wed 11-Apr-2007p.1m now 4sps30m toweroncley
136 Tue 10-Apr-2007needed to restart 4.5m sonic30m toweroncley
132 Tue 10-Apr-2007krypton at 14m strange30m toweroncley
131 Tue 10-Apr-2007krypton 7.5 cleaned30m toweroncley
129 Tue 10-Apr-2007p.ncar installed30m toweroncley
128 Mon 09-Apr-2007TRH recal info30m towerhorst1
125 Mon 09-Apr-2007soil samples30m toweroncley
124 Sun 08-Apr-2007power cycled hub in lower30m toweroncley
119 Sun 08-Apr-2007Radiometer Cleaned30m towerromberg
118 Sun 08-Apr-200711m pressure sensor tube on 30m Tower Filled30m towerromberg
117 Sun 08-Apr-2007Power Board on Viper Data System Replaced30m towerromberg
116 Sun 08-Apr-2007KH2O Sensors on the 30m Tower Cleaned30m towerromberg
115 Sun 08-Apr-2007Reinstalled Triple Hot Film Elements30m towerromberg
111 Sat 07-Apr-2007config mods for upper30m toweroncley
109 Sat 07-Apr-2007hftower network problem30m toweroncley
106 Sat 07-Apr-2007p' tests30m toweroncley
104 Fri 06-Apr-2007p' port connected30m toweroncley
103 Thu 05-Apr-2007upper data collection restarted30m toweroncley
101 Thu 05-Apr-2007tower climbing30m toweroncley
90 Mon 02-Apr-2007radiometers 'dusted' by mowing30m towerhorst
74 Fri 30-Mar-2007Heights of scintillometer and particle counter30m towerhorst
72 Fri 30-Mar-2007Reinstalled hot films on tower30m towerhorst
71 Thu 29-Mar-2007installed rain gauge30m towerhorst
60 Mon 26-Mar-2007deployment and removal of triple hot films30m towerhorst
57 Mon 26-Mar-2007Removed sonic 0740 from vertical tower30m towerhorst
55 Sun 25-Mar-2007Installed surface radiometers30m towerhorst
47 Sat 24-Mar-2007upper adam front panel port 16 bad.30m towerhorst
39 Fri 23-Mar-2007Installed TRH 502 at 1.5 m30m towerhorst
36 Thu 22-Mar-20076 m sonic replacement30m towerhorst
35 Wed 21-Mar-2007Changed 6 m sonic "dc" parameter to 030m towerhorst
33 Wed 21-Mar-2007Changed 6m data rate to 10 Hz30m towerhorst
31 Wed 21-Mar-2007Replaced 6 m TRH30m towerhorst
30 Wed 21-Mar-200710 m kh2o mount changed30m towerhorst
28 Tue 20-Mar-2007radiometer footprint30m towerhorst
26 Mon 19-Mar-2007Moved 16m 4-component radiation to point ~SW30m towerhorst
25 Mon 19-Mar-2007Installed 12.5 m sonic30m towerhorst
24 Mon 19-Mar-2007swapped 4.5 and 6 m sonics30m towerhorst
22 Sun 18-Mar-20076 m T; 3 (or 1.5) m RH30m towerhorst
21 Sun 18-Mar-2007Started zigbee radio for rad stand30m towerhorst
17 Sat 17-Mar-2007TRH heights30m towerhorst
16 Sat 17-Mar-2007Installed pressure port at surface30m towerhorst
15 Sat 17-Mar-20074-comp radiation height30m towerhorst
14 Fri 16-Mar-2007Sonic heights and S/N's30m towerhorst
4 Wed 14-Mar-2007Soil sensor location, s/numbers30m towerhorst
3 Wed 14-Mar-2007Installed sawhorse30m towerhorst


373: sonic, Site 30m tower, Mon 25-Jun-2007 10:09:59 MDT, Height of 14 m sonic
During teardown, on June 11, we took a measurement of top of the 14m boom.  
It was actually located 14.15m (to the top of the uppermost wood block).  

Yes, the 14m boom was moved.  Steve and I moved it early in Phase
1 when we were installing the triple hot-films for the first time.
There were no more sliding mounts, and 14m happened to be immediately
below a point where the guy wires attached to the tower.  So, the guy
wires blocked our ability to raise the boom on the rotating/lifting style
mounts.  We decided at that time to shift the boom up to immediately
above the point where the guy wire attached to the tower.  When we
were dismantling the tower, I had the thought that we might not have
measured the associated height change.  So, before Chris removed that
boom, Steve and I brought the tape up to him for a quick measurement.

So the 14m boom was at this new height for most of the campaign.
The date that it actually changed should be in the log book, i.e. the
day that Steve and I finally got the hot-films installed.


Logbook Entry #60:

Deployed hot films late Saturday afternoon, 3/25 07:07 GMT.


371: whatever, Site 30m tower, Fri 22-Jun-2007 12:01:44 MDT, sensor serial numbers, 30 m tower
Here's the list of the serial numbers of the instruments as we took them
off the 30m tower.  

Also, we took a measurement of top of the 14m boom.  It was actually
located 14.15m (to the top of the uppermost wood block).  I think we
should enter this too.

Thanks,

Ned


instrument      serial #
----------      --------
 1.5m CSAT      0673
      kh2o      1393

 3.0m CSAT      0674

 4.5m CSAT      1120
      kh2o      1390

 6.0m CSAT      0119

 7.5m CSAT      0540
      kh2o      1394

 9.0m CSAT      0536

10.0m CSAT      0671
      kh2o      1101

11.0m CSAT      0364

12.5m CSAT      0743


14.0m CSAT      1123
      kh2o(h)   1397
      kh2o(e)   1392

18.0m CSAT      0738

23.0m CSAT      1117
      kh2o      1525

29.0m CSAT      0744



370: rad_soil, Site 30m tower, Sun 10-Jun-2007 16:39:53 PDT, PAR sensor heights
PAR sensor heights:

11.42m
 8.03m
 5.07m
 2.11m

These are heights to the top of the railroad ties.
Add 0.3m to those for actual height. 
369: rad_soil, Site 30m tower, Sun 10-Jun-2007 12:16:51 PDT, Investigated Tcase.out.16m
Gordon fiddled with logger connections for rad.16m around 11:40(?)
368: sonic, Site 30m tower, Sun 10-Jun-2007 12:15:12 PDT, disconnected sonic splitters
Disconnected sonic splitters on upper channels S7 and S9 at 11:20.
366: rad_soil, Site 30m tower, Sun 10-Jun-2007 09:01:54 PDT, Tcase.out.16m intermittently bad
Tcase.out.16m has been intermittently bad since perhaps May 6.
363: trh, Site 30m tower, Fri 08-Jun-2007 23:23:17 PDT, 1.5m TRH out for about 7 hours
TRH at 1.5m was out starting from about 4pm today.  Cycled power at both the
data logger and at the TRH at about 11pm.  Output from 'rserial /dev/ttyS12
lower' suggests that it is now working again.





360: kh2o, Site 30m tower, Fri 08-Jun-2007 14:49:13 PDT, 1.5 m kh2o on vertical tower replaced
1.5 m kh2o went to zero coincident with watering, but has not recovered.
No water on lenses.  Cleaned 14:38

16:30 replaced 1395 head with 1393 head

358: infrastructure, Site 30m tower, Thu 07-Jun-2007 15:51:36 PDT, tower climbing
climbed the tower today at about 10:30 to install flagging on the TRH booms
at 14, 18, 23m.  was off the tower by 10:45.
355: trh, Site 30m tower, Wed 06-Jun-2007 17:59:41 PDT, installed TRH at 3m on tower
6/6  17:57 PDT

Installed TRH702 on the tower at 3m to replace 
TRH004 which was moved to the array today.


702 is the unit that has previously shown a problem with the RH
values, but we have no spare at the moment.



352: whatever, Site 30m tower, Wed 06-Jun-2007 15:53:26 PDT, Removed ACD CPC instrument from vertical tower
Removed CDC instrument from  30 m tower this morning.
345: infrastructure, Site 30m tower, Tue 05-Jun-2007 12:01:10 PDT, fuse blown on tower transformer
Power to the ACD trailer, WSU shack and the tower died
during the night.  According to WSU's data it died
at 1:30 am local time.

The ISFF data systems and sensors continued to run - 12 V batteries kept 
things going (did not check their voltage).

Power to the main switch was OK, but no voltage at the breaker
panel.  Eventually found a blown fuse - one of the two fuses
on the black Dynatech (sp?) black box mounted on the inside of the
wall from the main power input.  It is a 30A slow-blow.
Kurt says the black box is a surge suppressor.

Replaced the fuse and brought everything back up, with the
exception of the CPC counter, which is disconnected.

Power draw at the transformer breaker box is now:

1 leftmost   ACD west + WSU small pump + WSU sys (14-17A)
2 next       30m tower (2A)
3 next:      WSU big pump (7A)
4 rightmost: ACD north + lights (12-14A)


circuits 1 & 2 are on one leg, and 3 & 4 are on the other.

Measured the draw on each leg:

1+2:  16-19A
3+4:  19-21A

Things were back up at about  11:00 with a full load (without CPC).









344: infrastructure, Site 30m tower, Tue 05-Jun-2007 11:46:55 PDT, power to WSU SF6

WSU requirements (120V):

big pump: 7A
little pump: 3A
other:  3A


The 120V breakers, from left to right, on the white transformer
(da big one) at the tower, control these circuits:

1 leftmost    ACD west (11-13A)
2 next       30m tower (2A)
3 next:      for WSU
4 rightmost: ACD north + lights + CPC(12A)

We put WSU's big pump on #3 (the one labeled WSU)
and added their small pump and systems to the ACD west circuit.

It ran for several hours, then died during the night, see subsequent
entry...



343: kh2o, Site 30m tower, Mon 04-Jun-2007 15:28:03 PDT, cleaned kh2o
Cleaned the 1.5 m and 6 m kh2o
1.5 m at 14:57 - 15:00
4.5 m at 15:06 - 15:09
342: rad_soil, Site 30m tower, Mon 04-Jun-2007 15:26:54 PDT, cleaned sawhorse radiometers
Cleaned all sawhorse radiometers, 14:55 - 14:56
340: sonic, Site 30m tower, Mon 04-Jun-2007 12:16:39 PDT, Sonic configurations for vt
ttyS1 lower (1.5m):
ET= 60 ts=i XD=d GN=223a TK=1 P=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d tf=02600 02600 02600\r\nWM=o ar=0 ZZ=0 DC=1  ELo=010 010 010 ELb=010 010 010 TNo=cb9 d TNb=aba JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 8 8  CA=1 TD=  duty=094  AQ= 60 AC=1 CD=0 SR=1 X=0 MX=0 DT=02320 ss=1 XP=2 RF=018 DS=007 SN0673 25jan07 JC=3 CB=3  MD=5 DF=05000 RNA=1 sa=1 rev 3.0f cs=15996 &=0 os=

ttyS2 lower (3m):
ET= 60 ts=i XD=d GN=122a TK=1 UP=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d tf=02600 02600 02600\r\nWM=o ar=0 ZZ=0 DC=1  ELo=011 010 010 ELb=012 010 010 TNo=aba d TNb=7ba JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=9 8 8 tlb=a 8 8  CA=1 TD=  duty=097  AQ= 60 AC=1 CD=0 SR=1 UX=0 MX=0 DTU=02320 ss=1 XP=2 RF=018 DS=007 SN0674 04aug06 JC=3 CB=3  MD=5 DF=05000 RNA=1 sa=1 rev 3.0f cs=15279 &=0 os= 

ttyS5 lower (4.5m):
ET= 60 ts=i XD=d GN=212a TK=1 P=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d tf=02600 02600 02600\r\nWM=o ar=2 ZZ=0 DC=1  ELo=010 010 010 ELb=010 010 010 TNo=aca d TNb=bab JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 8 8  CA=1 TD=  duty=093  AQ= 60 AC=1 CD=0 SR=1 X=0 MX=0 DT=02320 ss=1 XP=2 RF=018 DS=007 SN1120 21jun06 JC=3 CB=3  MD=5 DF=05000 RNA=1 sa=1 rev 3.0f cs=39729 &=0 os= 

ttyS6 lower (6m):
SN0119 29jun05 rev 4.0s &=0 AC=1 AF=050 AH=1 AO=00300 ar=0 AQ= 60 BR=0 BX=0\r\n CF=1 C0o= 0 0 0 C0b= 0 0 0 CA=1 CD=0 cs=50966 DC=4 dl=015 DM=c DR=03465\r\n duty=089 DT=16240 ET= 60 FA=00050 FL=007 FX=038 GN=444a GO=00000 HA=0\r\n HG=01560 HH=02700 KT=0 LG=00832 LH=00100 MA=-020 MS=-010 MX=0 ND=1 NI=2\r\n ns=00203 OR=1 os=0 PD=2 RA=00020 RC=0 RF=00900 RH=015 RI=1 RS=1 RX=002 SD=0\r\n SL=035 SR=1 ss=1 T0123=1000 TD=a TF=02600 02600 02600 TK=1 TO= 0 0 0 TP=t\r\n ts=i UX=0 WM=o WR=006 XD=d xp=2 XX=00875 ZZ=0

ttyS7 lower (7.5m):
ET= 60 ts=i XD=d GN=111a TK=1 P=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d tf=02600 02600 02600\r\nWM=o ar=0 ZZ=0 DC=1  ELo=010 010 010 ELb=010 010 010 TNo=ddb d TNb=ddc JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 8 8  CA=1 TD=  duty=093  AQ= 60 AC=1 CD=0 SR=1 X=0 MX=0 DT=02320 ss=1 XP=2 RF=018 DS=007 SN0540 07sep06 JC=3 CB=3  MD=5 DF=05000 RNA=1 sa=1 rev 3.0f cs=22863 &=0 os= 

ttyS2 upper (9m):
ET= 60 ts=i XD=d GN=111a TK=1 UP=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d tf=02600 02600 02600\r\nWM=o ar=0 ZZ=0 DC=1  ELo=010 010 010 ELb=010 010 010 TNo=ecd d TNb=ebe JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 8 8  CA=1 TD=  duty=093  AQ= 60 AC=1 CD=0 SR=1 UX=0 MX=0 DTU=02320 ss=1 XP=2 RF=018 DS=007 SN0536 12jan07 JC=3 CB=3  MD=5 DF=05000 RNA=1 sa=1 rev 3.0f cs=30710 &=0 os= 

ttyS5 upper (10m):
T= 60 ts=i XD=d GN=041a TK=1 P=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d tf=02600 02600 02600\r\nWM=o ar=0 ZZ=0 DC=1  ELo=010 010 010 ELb=010 009 010 TNo=eab d TNb=ccb JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 7 8  CA=1 TD=  duty=092  AQ= 60 AC=1 CD=0 SR=1 X=0 MX=0 DT=02320 ss=1 XP=2 RF=018 DS=007 SN0671 11sep06 JC=3 CB=3  MD=5 DF=05000 RNA=1 sa=1 rev 3.0f cs=64681 &=0 os=

ttyS6 upper (11m):
ET= 60 ts=i XD=d GN=111a TK=1 UP=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d sa=1\r\nWM=o ar=0 ZZ=0 DC=1  ELo=010 010 010 ELDb=010 010 010 TNo=dcc d TNb=ddb JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 8 8 DTR=01740 CA=1 TD=  duty=082     AQ= 60 AC=1 CD=0 SR=1 UX=0 MX=0 DTU=02320 DTC=01160 RD=o ss=1 XP=2 RF=018 DS=007 SN0364 27may04 HF=005 JC=3 CB=3 MD=5 DF=05000 RNA=1 rev 3.0a cs=14725 &=0 os=

ttyS17 upper (12.5m):
SN0743 08oct03 rev 4.0r &=0 AC=1 AF=050 AH=1 AO=00300 ar=0 AQ= 60 BR=0 BX=0\r\n CF=1 C0o= 0 0 0 C0b= 0 0 0 CA=1 CD=0 cs=01570 DC=4 dl=015 DM=c duty=085\r\n DT=16240 ET= 60 FA=00050 FL=007 FX=038 GN=411a GO=00000 HA=0 HG=01560\r\n HH=02700 KT=0 LG=00832 LH=00100 MA=-020 MS=-010 MX=0 ND=1 NI=2 ns=00203 OR=1\r\n os=0 PD=2 RA=00020 RC=0 RF=00900 RH=015 RI=1 RS=1 RX=002 SD=0 SL=035 SR=1\r\n ss=1 T0123=1000 TD=a TF=02600 02600 02600 TK=1 TO= 0 0 0 TP=t ts=i UX=0 WM=o\r\n XD=d xp=2 XX=00875 ZZ=0

ttyS7 upper (14m):
ET= 60 ts=i XD=d GN=101a TK=1 P=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d tf=02600 02600 02600\r\nWM=o ar=2 ZZ=0 DC=1  ELo=010 010 010 ELb=010 010 010 TNo=bcb d TNb=bcb JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 8 8  CA=1 TD=  duty=093  AQ= 60 AC=1 CD=0 SR=1 X=0 MX=0 DT=02320 ss=1 XP=2 RF=018 DS=007 SN1123 15jun06 JC=3 CB=3  MD=5 DF=05000 RNA=1 sa=1 rev 3.0f cs=22803 &=0 os= 

ttyS8 upper (18m):
ET= 60 ts=i XD=d GN=121a TK=1 UP=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BXD=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d sa=1\r\nWM=o ar=0 ZZ=0 DC=1  ELo=010 010 010 ELb=010 010 010 TNo=bcb d TNb=bca JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 8 8 DTR=01740 CA=1 TD=  duty=085     AQ= 60 AC=1 CD=0 SR=1 UX=0 MX=0 DTU=02320 DTC=01160 RD=o ss=1 XP=2 RF=018 DS=007 SN0738 28mar03 HF=005 JC=3 CB=3 MD=5 DF=05000 RNA=1 rev 3.0a cs=18961 &=0 os= 

ttyS9 upper (23m):
T= 60 ts=i XD=d GN=212a TK=1 P=5 FK=0 RN=1 IT=1 DR=102 rx=2 fx=038 BX=0 AH=1  AT=0 RS=1 BR=0 RI=1 GO=00000 HA=0 6X=3 3X=2 PD=2 SD=0 ?d tf=02600 02600 02600\r\nWM=o ar=0 ZZ=0 DC=1  ELo=010 010 010 ELb=010 010 010 TNo=688 d TNb=696 JD= 007\r\nC0o=-2-2-2 C0b=-2-2-2 RC=0 tlo=8 8 8 tlb=8 8 8  CA=1 TD=  duty=093  AQ= 60 AC=1 CD=0 SR=1 X=0 MX=0 DT=02320 ss=1 XP=2 RF=018 DS=007 SN1117 07aug06 JC=3 CB=3  MD=5 DF=05000 RNA=1 sa=1 rev 3.0f cs=53343 &=0 os= 

ttyS10 upper (29m):
SN0744 09oct03 rev 4.0r &=0 AC=1 AF=050 AH=1 AO=00300 ar=0 AQ= 60 BR=0 BX=0\r\n CF=1 C0o= 0 0 0 C0b= 0 0 0 CA=1 CD=0 cs=07296 DC=4 dl=015 DM=c duty=085\r\n DT=16240 ET= 60 FA=00050 FL=007 FX=038 GN=222a GO=00000 HA=0 HG=01560\r\n HH=02700 KT=0 LG=00832 LH=00100 MA=-020 MS=-010 MX=0 ND=1 NI=2 ns=00203 OR=1\r\n os=0 PD=2 RA=00020 RC=0 RF=00900 RH=015 RI=1 RS=1 RX=002 SD=0 SL=035 SR=1\r\n ss=1 T0123=1000 TD=a TF=02600 02600 02600 TK=1 TO= 0 0 0 TP=t ts=i UX=0 WM=o\r\n XD=d xp=2 XX=00875 ZZ=0





338: sf6 tracer, Site 30m tower, Mon 04-Jun-2007 12:06:14 PDT, WSU arrived today
WSU crew (Gene Allwine & student) arrived mid-morning.  They are setting up 
their shed immediately south of the ACD (Oncley) trailer and north of the 
transformer.
331: infrastructure, Site 30m tower, Fri 01-Jun-2007 13:26:55 PDT, ACD power load / WSU Drop
13may07

Update 1jun07:   Rewired in 20A breaker for WSU when they come

	Main breaker in transformer distribution panel = 30A 240VAC
	leg1 = ~ 12.5@120ACD + ~2.5@120Tower	= 15A
	leg2 = ~ 11-14A@120ACD			= 14A

	leg2 will have WSU load, what ever that is.   It is on
	the 2nd 20A half of the breaker serving ACD's 'lights.'

	Built adaptor cable for an extension cable for them.
	Gordon, Tom know that their load needs to be measured
	and if significant, we prefer some be put on the 'leg1'
	distribution in the ACD trailer to balance the loads.
	Andreas' CPC can be taken down if capacity is needed
330: whatever, Site 30m tower, Fri 01-Jun-2007 13:20:43 PDT, Scintillometer removed: Tower climbed
1jun07  10:40-12:45  Tower Climbed

Removed scintillometer, cables, and 787 cable ties +/-50.

Initially the winds were very light from the north or non-existent.
By the end they had shifted toward the south.

329: hot films, Site 30m tower, Fri 01-Jun-2007 13:18:24 PDT, HF tower Pocketec swapped: Tower climbed
1jun07  10:40-12:45  Tower Climbed

HF tower pocketec #7 removed, #11 installed

324: whatever, Site 30m tower, Thu 31-May-2007 18:41:37 PDT, Scintillometer electronics removed: tower climbed
31may07  tower climbed 11:42-12:18

Removed scintillometer electronics box.
Because of favorable winds, and I didn't want Don L.
to have to tail the heavier more awkward optics sensing
head, we decided to leave it on the tower until another
day.
323: rad_soil, Site 30m tower, Thu 31-May-2007 18:38:23 PDT, tower rad cleaned again: tower climbed
31may07  tower climbed 11:42-12:18

~12:10 cleaned the 4-comp radiometers.  I had done this yesterday but
was unable to reach the down looking longwave.   Decided to re-clean
all today.   There was no dirt evident on any of the 4 sensors.
322: rad_soil, Site 30m tower, Thu 31-May-2007 11:06:12 PDT, rad stand battery swap
The rad stand battery was swapped.   The one removed was at ~12.1.
321: rad_soil, Site 30m tower, Thu 31-May-2007 10:52:21 PDT, Soil Sample - trime + gravimetric
31may07  9:20 LT

Trime Measurements:
'embedded-probes' = 31.6%	15-TDR
'temporary-probe' = 23.3%	15-TDR

Gravimetric sample, and 'temporary trime' probe sample, were from closer
to where our installed sensors are.   This area visually appeared more
representative of the surface moisture level than where the 'embedded-trime'
probes are where the top looks dry.

Tin weight: 8.0g, but the weights shown are after 'tare'
         Before baking  After baking
           Weight         Weight      delta   Estimate of % water by mass
0-3 cm:     91.5g          74.6g     16.9g    delta/91.5  = 18.5%
3-6 cm:    113.5g          94.3g     18.2g    delta/113.5 = 16.0%

Cooking start: 10:00 31 May
          end: xx:xx  x Jun
        Total: x days y hr


Note: It has been a few days since the last watering on 26May, so this 
should be one of the more moist conditions.

Note: The 0-3cm sample was not a perfect volumetric fit in the disk.
A sliver on top wasn't filled so thus the noticable difference in weights.









320: rad_soil, Site 30m tower, Wed 30-May-2007 17:51:47 PDT, rad cleaning
30may07 

12:30-12:38 LT the sawhorse radiometers were cleaned.
	Note there was quite a bit of filth on the uplooking
	sensors, especially the rnet.

15:20-15:35 LT tower climbed and 4-comp rad cleaned as
	best i could.   There wasn't a significant amount
	of dirt.
	Note I was unable to reach the outside, downlooking
	long-wave without an extension.

	Today we were having good south winds so decided
	to not go back up the tower.
309: rad_soil, Site 30m tower, Mon 28-May-2007 18:35:26 PDT, Par sensors installed, tower climbed, restart lower data system
28may07	16:00-18:00 LT tower climbed

PAR sensor installed
Lower data sys re-start (adn/aup) 1834-1835LT.
PAR data incoming.on lower ttyS19 (low.xml only)
low.xml is changed on aster but not run through new ops yet.

The ACD Apogee PAR sensors and Licor LI190 were installed
at levels: 2.5m, 5m, 8m, 11.5m (licor).
The 2.5m sensor is 'in the clear' at the bottom of the canopy,
the 5m sensor is actually inside some branches, while the
8m is at the top of the canopy and will have minimal shading.
The licor is above the canopy.
I hand leveled the sensors as best possible.

NOTE Re Calibrations:
The nominal calibration provided by Apogee was clearly not
consistent with the observed test.   The pars have a potentiometer
inside the sensor which is factory adjusted to uniform setting
of 5.0umol/(s m^2) per mV.       

A POST-PROJECT 'CALIBRATION' RUN SHOULD BE DONE to improve
upon and verfily what was done prior to putting them on the tower:

-------------------------------------------------------------

The Test run on 27may07 consisted of mote output from the par strings,
with the following output.   Note that the naming here is equivalent to
what we put up on the tower.
             PAR.2.5m       PAR.5m         PAR.8m         PAR.11.5m
			Apogee
chan		raw	   vdc     raw    vdc     raw    vdc     raw    vdc
19:08:39   6670  0.10422  3945  0.06164  6568  0.10262   175  0.00136

Output 57600,n,8,1


Chan 1	gain 4	ADC 0=0x48 SE-1	Wand-1 Apogee
Chan 2	gain 4	ADC 0=0x48 SE-2	Wand-2 Apogee (This one doesn't have diffusers)
Chan 3	gain 4	ADC 0=0x48 SE-3	Wand-3 Apogee
Chan 4	gain 8	ADC 2=0x4C SE-1	Licor

NOTE Re Cleaning:
	I did not do any special cleaning before this test. 
	The intention was to get it out to see 'order of magnitude'
	so that we could decide whether to proceed on the tower or not
	The Apogee 'quantum' manual for the LQS50-6 does not mention
	what to use.   They had appeared clean visually.
	After the test and before putting on the tower I did clean
	with distilled h2o because there was some dust on them from
	overnight and 'car' traffic.

DATA FILES:  RAW
	/media/isff2/projects/CHATS/parsensors/parTestNight1.cap
	/media/isff2/projects/CHATS/parsensors/parTestDay1.cap

EXCEL FILES:
	/media/isff2/projects/CHATS/parsensors/parTestNightDCbias.xls
	/media/isff2/projects/CHATS/parsensors/parTestDay1-1.xls

	These guys are the raw data with some graphs added.
	In the second worksheet of 'day1-1' is a crude 'scalar'
	that can be used to semi-normalize the data to allow you
	a relative micromol/(s m^2) level based upon the voltages
	output and read by the pars.
	Clearly there is a slight shift in the 'scalars' through
	the day.   The average multiplier to normalize the licor
	voltage to the wand readings for the day is shown below,
	plus the 'calibration' into micro-mols / (s M^2)

	Simplistic GAIN
	PAR.11.5m =	PAR4, licor, * 263.635213   = micro-mols
	PAR.8m    = PAR3 / 40.9949 * 263.635213 = micro-mols (* 6.430927)
	PAR.5m    = PAR2 / 26.4434 * 263.635213 = micro-mols (* 9.969793)
	PAR.2.5m  = PAR1 / 43.8834 * 263.635213 = micro-mols (* 6.007630)

	From the 'Night' file a nominal dc-voltage-offset is shown below.

	Simple OFFSET
	PAR.11.5m = PAR4 = .000317	(adc0-1)
	PAR.8m    = PAR3 = .000947	(adc0-2)
	PAR.5m    = PAR2 = .0009	(adc0-3)
	PAR.2.5m  = PAR1 = .000948	(adc2-1)

-----------------------------------------------------------------
Licor:	s/n 11264

	Nominal Calibration using 2290S mV adaptor:
	(8.9microA/1000umol*s-1*m-2) * 1A / 10+6microA * 604 Ohms =
	
	mult=-159.24	umol*s-1*m-2 per microA
	tcoff=.0036
	9feb07

Here is the cal info on the Licor 11264
multiplier        cal constant           604 ohm adapter        cal factor
umol/(s*m2)/uA    uA/1000 umol /(s*m2)   mV/1000 umol /(s*m2)   1000 umol /(s*m2)/mV
-159.24           6.28                   3.79312                0.263635213

The units we put data out in for the Quantum is umols/sm2.
So with the 604 ohm adapter you should use the calibration factor 263.635213


-----------------------------------------------------------------


305: kh2o, Site 30m tower, Sun 27-May-2007 10:57:17 PDT, Changed electronics box of k.14m - tower climb, and other activity
Electronics box S/N 1392 put in for krypton at 14m on tower. S/N 1393 taken out.
We believe this will steady the performance of k.14m (which has been flakey
at regular intervals).

Tower climb began 1118LT and end 1152LT.

The krypton was plugged at 1140LT.

Krypton went bad at ~1302LT, indicating that the electronics box was probably
not the problem.

We decided to then change out the serializer in the CSAT box (rather than 
changing out the entire sonic and CSAT box) as a further test. If that does not
work then we'll have reasonably strong evidence that it is the krypton-CSAT box
cable or the wiring to or from the serializer along the data path.

The system was down from 1543LT until 1604LT with tower climbing beginning at
1535LT. Off tower at 1615LT.


302: rad_soil, Site 30m tower, Sat 26-May-2007 13:01:17 PDT, PAR sensor work, tower climb
PAR sensor placement was begun 12:45LT through 13:30LT with tower climbing. 3
or 4 sensors will be mounted oriented toward the SE or SW depending on mounting.

301: kh2o, Site 30m tower, Sat 26-May-2007 12:55:24 PDT, Cycled k.14m (S7, upper), inadvertant others
kh2o.14m (S7 upper) was power cycled as a change out was not possible due to 
watering.
Inadvertantly, S13 and S17 were also cycled due to mental failure (not by
this author).
300: kh2o, Site 30m tower, Sat 26-May-2007 12:40:42 PDT, Odd behavior in kh2o.7.5m overnight
k.7.5m stood out as high overnight. This could be physical or it could be a bug
crawled across the window (slept there) or some other cause. We are unsure but
it is now clean and functioning normally.
Also, cycled for good measure (S7, lower)

299: trh, Site 30m tower, Sat 26-May-2007 12:39:25 PDT, T/RH.6m fan may be failing
Ned noted a funny fan sound in T/RH.6m. No obvious impact on data and we are
monitoring.
298: sonic, Site 30m tower, Sat 26-May-2007 12:38:15 PDT, sonic.9m possibly low?
Ned found what may be an errant reading in the 9m sonic winds (they seem 
slightly low, perhaps). We are investigating.
297: hot films, Site 30m tower, Sat 26-May-2007 12:32:21 PDT, hftower started/triple films installed
The triple films were installed as before #1 at 6m, #4 at 10m and #3 at 14m 
between 1115LT and 1200LT. hftower was started with the switch and did not
come up. adn/aup was unsuccessful in mounting the Ptec.
Hard cycle was unsuccesful in mounting the Ptec.
adn/aup was successful in starting the data system and mounting the Ptec.
DAQ at 1944:46UTC.

296: kh2o, Site 30m tower, Sat 26-May-2007 12:31:25 PDT, Tower kryptons cleaned/checked
All of the tower kryptons were cleaned between 1110LT and 1230LT today.

Only the 23m sonic/krypton boom was lifted to do the cleaning.

295: kh2o, Site 30m tower, Sat 26-May-2007 10:23:45 PDT, 1.5m kh2o 'misaligned'
23may07 ~12:30 PDT

1.5m Kh2o was smacked hard by Ned's head.
Note the ~.2v drop in output at that time.
Appears the response and fluxes are still reasonable.
There is a noticable (~.5cm) horizontal misalignment now.

Manually aligned at 1112-1115LT today with some gain in voltage.
286: hot films, Site 30m tower, Wed 23-May-2007 18:44:05 PDT, hftower down for spraying, tower climbed
23may07  15:15-16:10  tower climbed

hftower turned off
Ptec#6 removed,  Ptec#7 installed
Removed 3-axis hotfilms and covered connector.

284: trh, Site 30m tower, Wed 23-May-2007 11:22:26 PDT, 6m trh swapping, tower climbed
23may07 10:30-11:00;   12:05-12:20 Tower Climbed

6m TRH swapped out, back in, filter installed:
Originally at 7.5m until last night, trh had been showing 
a broad-band frequency response that at first was thought
to be a feature in the canopy/atmosphere interaction.
That sensor was swapped with 6m last night, but Greg and Ned
observed that it retained the 'feature' so it was removed today.
However, the 'new' unit wasn't working, so we put the original
unit back up.......meanwhile.....Geez Louise....
....noticed gortex filter missing on culprit trh!
Don't know how long that was the situation, but now it has a
filter from the 'spare.'
We'll keep an eye on this to determine whether the missing filter
was the only problem, or if it has been effected by operating without
a filter.


Andy Turnipseed's 14m inlet
Briefly installed a o3 filter for him to check his instrument,
closer to 10:50, for roughly 1-min


282: trh, Site 30m tower, Tue 22-May-2007 16:48:56 PDT, Exchange TRH.6m
On the basis of entry 280 in the logbook we will proceed with using a TRH spare
at TRH.6m on 23 May.

280: trh, Site 30m tower, Tue 22-May-2007 14:39:48 PDT, T/RH exchange 6 with 7.5m due to oscillation
Per ongoing T/RH investigation and Tom's email we feel that there may be a 
non-physical low frequency undulation in T.7.5m including a time lag. We were
unable to detect this behavior in RH.7.5m. 

Today at 1455LT we exchanged the 6m and 7.5m TRHs to see if the feature 
currently at 7.5m changes position.

Start of tower 1455LT
End of tower 1515LT

Result: The feature moves. Not notable in RH measurement. Notable in T however.
(spectra and ts). Will change it out tomorrow (the 6m TRH).



276: rad_soil, Site 30m tower, Mon 21-May-2007 16:02:13 PDT, Rlw.16m problem - seems to be in the web plots only
More analysis of the Rlw plots shows that for a number of weeks at least that
the Rlw web plots differ from the S-plots on Aster. The S plots are much 
smoother and physically realistic and so believe the web plots are accessing
something incorrectly to create a jittery plot. Will look at from hotel where
internet is more amenable.

Summary: Not likely to be a problem with the sensor.

Solution: Tom fixed this problem by adjusting rad.q. It turns out that the 
K&Z at .16m was using Eppley equations resulting in the funky behavior.

275: rad_soil, Site 30m tower, Mon 21-May-2007 13:06:19 PDT, branches cut away from Rnet
21may07 ~11:40  branches cut

These were 'encroaching' the Rnet to within an inch or so.
It could have hit the sensor already, or at some point
although there was no damage.
274: kh2o, Site 30m tower, Mon 21-May-2007 13:02:38 PDT, 14m Kh2o head only swapped
21may07 12:00-12:50

14m kh2o had been a problem, and it went bad again late yesterday.
We decided to replace just the head:
out 1393
in  1397
since according to Campbell this can apparently be done without
effecting the data.    It is breezy today and we decided to not
mess with the electronics box itself.
Still a chance that this won't fix the intermittent problem...

Data looks very good as of 16:00LT.

273: trh, Site 30m tower, Mon 21-May-2007 13:01:08 PDT, 1.5m TRH swapped
21may07 11:45-11:50

TRH swapped out with the newly calibrated / delivered unit from Boulder.
The one removed had been the culprit at 3m with the high-freq. noise.

S-plus shows that the 3m noise remains in place. Thus we conclude that this is
one of the sensors (50Ys) that Steve S. suggests have this behavior and that we
put another one in.

However, the RH and MR values (profiles)
are much more physically realistic and now, consistent with two separate
h2o profiles from ACD (1.5 and 4.5 m) with height. The 'notch' from yesterday
is gone and the 'bulge' from previous days is gone and replaced with a smoothly
varying h2o profile!

Basically, the 3m RH seems to have been high by ~2% until this time.



272: whatever, Site 30m tower, Mon 21-May-2007 12:57:18 PDT, Tower Climbed: branches, kh2o
21may07 11:15 - 12:50  Tower Climbed

Branches trimmed.
The breezy conditions were causing some branches to blow into the 9m trh,
and some other stuff.   Clipped these, and hopefully didn't 'clip' one
of the hotfilm wires at same time...

14m kh2o head swapped....see entry 274
270: trh, Site 30m tower, Sun 20-May-2007 15:57:10 PDT, Exchange of 1.5m and 3.0m T/RH completed
Between 1540 and 1610 the 1.5m and 3.0m TRHs were exchanged. The purpose of 
the exchange is to discern whether the mixing ratio maximum showing at RH.3m 
(relative to 1.5m in particular, where soil moisture was expected to contribute
 moisture more effectively) is real or sensor-related. We expect a 'notch' to
to develop in the profile if the original 3m sensor was reading high or if the
1.5 m sensor was reading low (in creating the current condition).

Result: The notch was created. The exchanged sensors read within 2% RH however,
which is the accuracy of the sensor and so little can be done (unless the 
calibrations are unified to eliminate the bias).
269: rad_soil, Site 30m tower, Sun 20-May-2007 15:55:05 PDT, lw.out exceeding 800W
The 16m rlw.out is much higher than previous values the last two days. 
Investigating.
267: trh, Site 30m tower, Sat 19-May-2007 14:07:22 PDT, mixing ratio profile, that was in question, less so due to ACD h2o profile confirmation
Ned checked with the ACD team regarding their h2o profiles to see if the low
elevation peak at 3 & 4.5m in mixing ratio was real. It was confirmed in their
profiles. This appears to indicate a convergence of water below canopy and 
above ground. Very interesting ... is this counter-gradient transport? Given the
reverse shear going up to the canopy, I don't think so, it is just that the
shear is reversed from our expectation.
266: whatever, Site 30m tower, Sat 19-May-2007 11:43:35 PDT, Tower Climbing: Scintillometer work
19may07 10:40 - 11:20  Tower Climbed

Scintillometer adjustment / data bad
------------------------------------
Anurban and Dawit downloaded the data with Erik, the student from Davis
who is supposed to periodically grab the readings.
However, the data was bad.
At Dawit's suggestion the dip switch settings were adjusted to increase
sensativity.   When we tried covering the optics to sample the background
readings, they were too high indicating excessive gain.   Meanwhile,
they had tried all the standard settings but got either insufficient signal,
or too high sensativity..
Jan is emailing Scintec about the situation.
Likely problem is that the receiver tower on the other side of the
orchard is too low and the signal is being obstructed by trees.
There could be a polarity issue, but it is unknown if that is even
possible.   The apeture is apparently 10-degrees, so wobble in the boom
could be a factor ultimately.
The students went home today, and Jan is considering his options. 
262: kh2o, Site 30m tower, Sat 19-May-2007 09:05:47 PDT, 14m Kh2o bad / recycled power
19may07 9:00  Recycled power to 14m kh2o

The values were bad from 18may 19:30Z - 19may 16:00Z

Previous power recycle overcame this problem for only 4 days.
259: hot films, Site 30m tower, Fri 18-May-2007 15:43:15 PDT, hftower down and now up again - tower climb
18may07  hftower work

15:45 - 16:15 Tower climbed

Removed ptec#7.
Took data system off tower given ongoing
flakey behaviour to change out the interface panel
(its corrosion may contribute to the flaky behavior
after 'water flooding' earlier).
Did not swap viper.   Cleaned power/analog panel.

17:30 - 18:00 Tower climbed
Reinstalled box.   Ptec #6 (which had Gordon's full r/w fsck so
it should be aok).
Bootup had exactly same behavior as before.   Didn't work, no
pocketec, on hard bootup but subsequent 'adn' and 'aup' did
mount it properly and things worked fine.   Thus i don't expect
this run to stay up either.




258: whatever, Site 30m tower, Fri 18-May-2007 15:14:46 PDT, Tower climbing
1445-1505 Andreas tower climbing to 14m (butanol refill).
253: rad_soil, Site 30m tower, Fri 18-May-2007 12:47:17 PDT, Soil Sample - trime + gravimetric
18may07  10:50

Trime Measurements:
'embedded-probes' = 32.1%	30-TDR
'temporary-probe' = 22.8%	31-TDR

took gravimetric, however, difficult soil.

Tin weight: 8.0g
         Before baking  After baking
         Weight w/ tin  Weight w/ tin            Estimate of % water by mass
0-3 cm:     75.4g          71.15g      -4.25g     4.25/(71.15-8.0) =  6.73
3-6 cm:     98.5g          88.25g     -10.25g    10.25/(88.25-8.0) = 12.77

Cooking start: 1610 17 May
          end: 1240 20 May
        Total: 2 days 20.5 hr


Note: it has been many days since the last rain/watering.
Will take another reading after the next watering.


250: data system, Site 30m tower, Thu 17-May-2007 20:24:56 PDT, hftower pocketec exchanged ... again
After getting the hftower pocketec (#6) up at ~1630, Gordon noticed it was down
a couple hours later. Winds were good so we went out at sunset and exchanged
it with ptec#7. 

We did adn and halt before heading for the tower.
At the tower we exchanged 6 for 7 and then powered up.
Ptec writes failed.
We did adn then aup and it came up and started writing at 201152 LT 17 May.
Same pathology as this afternoon.


249: hot films, Site 30m tower, Thu 17-May-2007 17:49:24 PDT, Tower Climbed: hftower swap pocketec
17may07 16:15 16:35

hftower media swap
The pocketec storage was down.
Powered down (Greg shut down daq)
removed #11
install #6	later ran copy_usbdisk.sh (5/15,18:30 - 5/17,5:00
Power up
no-go on pocketec from hard bootup, not mounted.
adn
aup
and everything worked.
Perhaps adam startup sequence needs additional delay to allow pocketec to init?

247: infrastructure, Site 30m tower, Thu 17-May-2007 15:52:15 PDT, Tall Tower Climbed: scintillometer
17may07 9:10 - 9:50  Tower Climbed

Scintillometer:
Dawit and Anirban (Jan's students) went up to tweak gain/resolution
243: communications, Site 30m tower, Wed 16-May-2007 16:28:01 PDT, Tall Tower climbed, installed sodar repeater
16:may07  10:50-13:30 and 15:15-16:15  Tower Climbed

Sodar Repeater put back up.
Discovered no power at top.
worked down to find no power at mid-level junction.
Taped connection had leaked and power pin was corroded away.
Installed new splice cable to ttyS20, upper, and confirmed
working at base.   Reclimbed later in day to rework the cables
and tape the new connections.   Left bad / gray cable on the
tower for now.   Put radio back at sodar, and both ends as far
as the freewaves are concerned are working.   Did not check
the sodar's pc.   When checking at the base later on, did not
see the ppp link running, nor anything in the system log,
but Gordon said to expect it'll only be up ~20min every 1-2 hours,
and it is initiated from the sodar side.

Scintillometer aligned.
I worked on it for awhile and then David took over (student in
charge of the instrument) and he, other student, Jan eventually
realigned it.   Uncertain but it may not have good signal because
the target is 'in the trees' despite being on their crankup tower.
Didn't ask them, just basing this on partially overheard conversation.
See their logs.

239: trh, Site 30m tower, Tue 15-May-2007 17:38:45 PDT, T.3m - 0.05-0.15 noise in 1 second data - since at least April
In the course of an investigation of the low mixing ratio at 1.5m on the tower
(compared to the 3 and 4.5m levels) we looked at T at those 3 levels.

High-rate plots (1Hz) showed highly noticeable noise about the T.3m signal 
(not in the RH.3m signal). We tried one idea related to Xbee radio 
interference to no avail.

Given the earlier fan problem in TRH.3m we are changing the fan. This resulted
in an outage from 1740-1810LT and had no effect.

A search back to 15 April confirmed that this noise has been present since at
least then (data storage here is limited to 15 Apr - the rest is at home). 

From the above we conclude that the sensor itself is unstable and should 
be replaced. Check with Tom.
236: kh2o, Site 30m tower, Tue 15-May-2007 12:25:08 PDT, Flakey 14m krypton, power cycle
15may07 11:40 - 11:50   Upper

14m krypton was flakey once again.
While monitoring the csat, voltage was basically '0'
Cycled power on ttyS7 and it came back up looking ok.
This will not fix the problem (no-doubt), but probably
eliminates a cable problem on the krypton.
Most likely next step either swap kh2o, or the serializer,
one or the other is the culprit (or a cable inside the csat
box).
Ops good today with south winds so did not pursue further.
235: hot films, Site 30m tower, Tue 15-May-2007 12:18:37 PDT, Hftower Pocketec swapped
15may07  11:10 - 11:45  On-Tower

Hftower adam

Swapped pocketec
removed #6
installed #11
swapped cable also

Pocketec had died last night
after working ok for ~4-hours.
Physically the connection appeared OK, and it was powered up,
however, the data system did not have-it mounted.
A 'adn' took down the daq 'normally', and an 'aup' brought
everything back up normally after installing #11.   At that time
new data was being written normally.

Continues to operate as of 1500LT.


231: hot films, Site 30m tower, Tue 15-May-2007 10:23:14 PDT, hot-film data copied, pocketecs then cleared
As part of the ongoing analysis of the data-system/hftower/3-d hotfilm problems
we are planning to change out the 'good' Pocketecs for the 'flaky' pocketecs
today. As a result we have cleared the data off of them.

We cleared PTEC#11 of 2 partial files it had gathered from 11 May before
flaking.

We cleared PTEC#2 of ~ 24hrs of files it had gathered from 12-13 May before
flaking.
229: whatever, Site 30m tower, Mon 14-May-2007 17:58:49 PDT, CPC height - John to enter
CPC measured as follows...
see entry 199...
228: whatever, Site 30m tower, Mon 14-May-2007 17:58:02 PDT, Scintilometer height - John to enter
Scintillometer lens center at ...
see entry 217...
227: hot films, Site 30m tower, Mon 14-May-2007 17:23:36 PDT, hftower back up @ 1650LT (down at 1612LT 13 May)
The 3-d hot-film system has been down since 13 May 1612LT. A large amount of 
time has been spent since ~10LT this morning in trying to resurrect the 
measurements from the three 3-d hotfilms. 

John finally got it going by inserting a USB stick in place of the Pocketec.
This seemed to clear out the system somehow, then allowing the Pocketec
to mount.

Hotfilm is up as of 1650LT 14 May.

The winds swung into the south at ~1630LT (within the +-30degree band of primary
interest).

224: data system, Site 30m tower, Mon 14-May-2007 17:05:13 PDT, CPC ingest started, lower down for ~20 min
The .xml was uploaded and pushed to Lower for ingest by Gordon between
1902 and 1919UTC. Ingest began at 191857 officially.
222: whatever, Site 30m tower, Mon 14-May-2007 13:02:02 PDT, Tower Climbing / Helicopter Ops
14may07 11:50-12:45 Tower climbing during ops, light north winds
	Measurements of cpc, scintillom stuff.
	Removal of sodar repeater.

Helo Ops today, roughly beginning at 12:15
219: infrastructure, Site 30m tower, Sun 13-May-2007 17:36:12 PDT, ACD power load / Tower DC
13may07

ACD loads:
	~ 7.5A @120, leg with lights, etc.
	~10.5A @120, leg with Alex's big load + CPC on tower (~100w)
	Andy said this is very close to everything.

	Update 30may07 for ACD loads:
	~ 12.5 @120
	~ 11-14A @120
	So these are under the requested 20A*2,
	however, for WSU who requested 20A also there could
	be some compromises needed.
	Andreas' CPC load can apparently be removed if needed.

Tower DC:
	13.5 at Power Supply charging/running daq
	12.7 at battery going to boxes
	12.3 into upper's main
	11.7 into lower's main
	11.5 at bulkhead going to ttyS10 (cpc sio only)

	These are low, and I wonder just how low they are at height.
	Too much IR drop.
	Also note that while working on the tower I noticed the lowest
	trh fan 'sagged' noticably for a short period.
	This only happened twice that was observed and since AndyT.
	was there I decided to blame his ACD loads, but......
	could this be and issue with trh quality due to occassional
	insufficient aspiration.

218: sonic, Site 30m tower, Sun 13-May-2007 17:12:03 PDT, Sonic tee'd off to ACD (for Andy)
13may07 15:30
14m sonic /dev/ttyS7 upper tee'd to Andy's ACD.
23m sonic /dev/ttyS9 upper tee'd to Andy's data system. 

217: whatever, Site 30m tower, Sun 13-May-2007 17:06:45 PDT, Kleissl scintillometer
12may07, 15:30 day-before ops begins

The Kleissl system was installed at ~20.5m on the tower
mid-way between the 18m and 23m sonics.

Data Ingest going down sio cable to dangling 232-port
	that Jan uses with his laptop to download data. 

Power	for scintillometer is tee'd off at the beacon,
	and goes back down roughly 15m to the device.
	Jan said it's load is ~12W.
	We did not measure actual voltage or load.

Heights	2.37m from top of Scin.-boom above top of 18m sonic boom.
	18cm from center of optic window to top of Scin.boom.
	15cm from top of Scin.-boom to top of its elect. box
	Box Dim.= 18cm out, 20cm parallel to south leg of tower.
	
13may07 16:40-17:05	Tower climb during ops, wind from north
	Swapped scintillometer electronics box.
	The previous box was for a different sensing head.


215: kh2o, Site 30m tower, Sun 13-May-2007 17:00:45 PDT, krypton 7.5m 12 May
Krypton at 7.5m cleaned with significant increase in V @0955LT. Good for
   operations

214: hot films, Site 30m tower, Sun 13-May-2007 16:59:21 PDT, hftower 12 May
hftower TF4 switches in miniCTA adjusted to proper position 1445LT.
hftower usbdisk replaced. After a complex aup/adn, reboot sequence it is up
   as of 1530LT.
212: whatever, Site 30m tower, Sun 13-May-2007 16:49:14 PDT, Camera 12 May
Web cam on array moved to full array height, central array tower at 1700LT.
Oriented in slight downward position. 









211: hot films, Site 30m tower, Sun 13-May-2007 16:42:36 PDT, hftower 11 May
hftower installed and flakey (incomplete pings 10-40% data loss) - apparently
this is how it behaved earlier, was troubleshot then and deemed sufficient. 
Sensors ordered TF1 bottom (6m), TF4 (spare, 10m) and TF3 (14m). 
Switches not correct  for TF4. Data not being taken yet.



207: pressure, Site 30m tower, Sun 13-May-2007 16:28:15 PDT, Oncley p' sensor disconnected May 10
   - fully disconnected Oncley sensor and put USFS sensor back on (working) 
~ 1300LT
   - Oncley sensor to be installed at array 
205: trh, Site 30m tower, Sun 13-May-2007 16:24:01 PDT, TRH.9m May 10
1445LT re-install the intake for the tower T.9m
   - T.9m now operating well
200: ops, Site 30m tower, Sun 13-May-2007 15:32:14 PDT, Scintillometer work, tower climbing
Work on sighting in the scintillometer occurred 1125LT-1215LT on the tall tower.
199: data system, Site 30m tower, Sun 13-May-2007 15:28:21 PDT, Tower 14 m CPC Aerosol installed (particle counter, ACD Andy
13may07 11:25-12:15 tower climb, ops, north wind

The CPC box was installed 12may07 between 13-13.5m
	on south face of tower.
	need to measure exact height yet.

The tube is laid at the 14 m sonic and data is taken at 10Hz.

Dimensions:
	Intake = 15cm below top of 14m sonic-boom
	Box dimen. = 25cm out from, 33cm parallel to south leg of tower.
	Box top is 52cm and bottom is 83cm below top of 14m sonic-boom.
	Note the is a very bright polished alum. box sitting above
	radiometers.

Installed newly built cable for CPC Aerosol.
Plugged into lower /dev/ttyS10.
isff_lower.xml not yet modified.
baud: 115200
data bits 8
parity none
stop bit 1
data output ascii string, variable lenght, ended by carriage return, no line feed
Data rate 1Hz (of ten 1/10th second values) (10 sps contained in single message)

Power	is A/C estimated by Andy as ~100W,
	coming off the 2nd breaker going to the
	ACD trailer.

Aerosol cable	Bulgin
Tx out   2	5 Rx white
Rx in    3	6 Tx orange
Gnd      5	8 gnd black









198: kh2o, Site 30m tower, Sun 13-May-2007 15:27:17 PDT, Kryp 1.5m cleaning
1.5m krypton cleaned at 1125LT. Good result.
195: kh2o, Site 30m tower, Sat 12-May-2007 18:16:30 PDT, Kryp.14m, 7.5m, 1.5m + cleanings
14m intermittent behaviour was evaluated at 1005LT. Working well but has had
problems. Judged stable enough to go into ops tomorrow. It was cleaned too.

Low voltage on 7.5m lead to a cleaning at 0955LT. Notable increase in V and 
we noted a bee in between the windows!

1.5 m cleaning 1800LT made things worse. Reclean tomorrow.


194: trh, Site 30m tower, Sat 12-May-2007 18:14:24 PDT, TRH.3m fan adjusted
The fan had quit. It turns out that it was caught and by re-rounding the intake
it worked again. Will monitor for intermittent behaviour.Installed 0940LT. Data
looks great.
193: hot films, Site 30m tower, Sat 12-May-2007 14:50:44 PDT, Triple film data system - hftower and TF4 switches adjusted
3-d hotfilms installed on the 30m tower between 1245 and 1345LT. Data system
hard-booted with a new Pocketec in place of the one that had not been working
(we are suspicious that it was the soaking it endured during the break). It
was placed in the USB2 plug. Chris earlier had noted some condensation in the 
data system box (from the Pocketec cloth cover that had absorbed much water)
so we air dried it for a bit.

TF4 - the spare 3-d hotfilm, now installed at 10 m in place of TF2, had its 
switches adjusted to the proper configuration. 

hftower functional as of 1530LT with 130Meg files per half hour being 
written to the Pocketec. 

ssh to root@hftower is slow (be patient). 


191: whatever, Site 30m tower, Sat 12-May-2007 08:30:25 PDT, ACD tubes 12 May
ACD tube installations (Golem/John on tower) completed 1220LT. Profile 
at the following heights: 1.5, 6, 9, 11, 14 and 23m. - completed 1200LT. 
Tubes are ~ 0.7 meters out on boom with a small webbed intake of ~ 5cm
diameter. Some additional tubes are at these heights but at the tower rather
than on the booms.

Tubes were pulled from 1100-1220LT.





185: trh, Site 30m tower, Wed 09-May-2007 09:17:02 MDT, TRH woes
Problems have recently cropped up with the 9, 14, and 23 m TRH's.

9 m TRH is too high during the day, suggesting a fan failure.

14 m TRH has bad data (T=-40, RH=-1.6).  It appears as though there is a bad
connection between the sensor and the A/D.

23 m TRH is not communicating with the data system.  Perhaps a power recycle
will get it going properly.
183: rad_soil, Site 30m tower, Mon 07-May-2007 14:43:52 MDT, rad stand battery fix
the rad stand was fixed by Hanza on friday Apr 27th by running wire from the
large battery, directly to the datalogger.
data started flowing.


178: pressure, Site 30m tower, Wed 25-Apr-2007 13:29:58 MDT, resonance
I determine from the spectrum that we now have resonance at 3.3Hz.  At a nominal
speed of sound of 330 m/s, and assuming that our tubing is one-open-end 
resonator at 1/4 wavelength, the length of tubing would be 100m/4=25m.  Our
garden hose 15m, so there is a bit of a mismatch, but perhaps this is
close enough to be the explanation for the "bump"?

177: pressure, Site 30m tower, Wed 25-Apr-2007 11:52:46 MDT, p' port location
Using photogrammetry, I've estimated that the center of the quad-disk-probe
is 37.4cm from the intersection of the CSAT acoustic paths, at an angle of 
133 degrees from the longitudinal axis of the sonic.  If the sonic was
pointing due west, this would make the bearing of the port 137 degrees true 
from the sonic array. Winds from an angle of 149 degrees true would graze the
edge of the probe's outer disks.  Thus, 11m sonic data from directions from 
about 125--150 degrees are now compromised by the presence of this port.

174: kh2o, Site 30m tower, Wed 25-Apr-2007 09:29:15 MDT, 14 m kh2o recovered April 23
The 14 m kh2o appears to have recovered ~1515 PDT, April 23.
173: adams, Site 30m tower, Tue 24-Apr-2007 14:46:54 MDT, hfarray dead (and resurrected!)


Before SteveO left he plugged in the emptied pocketec to hfarray,
but wasn't able to mount it.

I logged into hfarray from Boulder today but still wasn't
able to mount the pocketec.  I think the error was:

"/dev/sda1 is not a valid block device"

As a hack I rebooted hfarray, and now it won't ping.

(hfarray is the system with the 10% ping error problem).



After an hour or so the system came back.  It must
have been checking the disk.  I logged into it,
verified that the pocketec data has been saved to
the /media/isff backups, and cleared the pocketec.

161: hot films, Site 30m tower, Sat 14-Apr-2007 17:02:01 PDT, shut down hftower data
To avoid filling up the Pocketec with useless files, I stopped data collection
with adn.

159: pressure, Site 30m tower, Sat 14-Apr-2007 15:34:42 PDT, flat washer inserted
Finally inserted a flat washer at the port/hose connection, so it shouldn't
leak.  This done 1508.  The fitting had "bottomed out", so prior data are
somewhat suspect.



158: hot films, Site 30m tower, Sat 14-Apr-2007 15:32:26 PDT, triple probes removed
From about 1430-1500 removed the triple probes in order: 6m (1), 10m (2), and
14m (3).  Both 6m and 10m were sliders, so sonic data probably are okay.
14m was a tilt-up, that was up from ~1453-1457.

155: pressure, Site 30m tower, Fri 13-Apr-2007 18:38:09 PDT, tubing shortened
I removed about 4m of dekoran tubing from the base of the mast, which might
help lower our bump a bit more...
This done about 1830.

153: pressure, Site 30m tower, Fri 13-Apr-2007 14:49:46 PDT, moved port to other side of boom
I remounted the quad-disk-probe on to the south side of the sonic boom, as per
Bill and Jim.  Winds from SE will now put the sonic in the wake of the port.

I also intended to make the hose fitting more secure, but now realize that I
should have a washer inside the fitting (which I didn't have).  Another trip
may be called for.

152: rad_soil, Site 30m tower, Fri 13-Apr-2007 14:45:37 PDT, 16m rads cleaned
I cleaned the 16m radiometers from 1413-1417.  Sky was clear, so it should be
possible to see the effect.  There was a bit of obvious dust on the up-lookers.
As far as I know, this is the first time cleaning these sensors.

The boom was seated on only one side of the clamp, which made me nervous.  It
was redeployed using both sides.

151: sonic, Site 30m tower, Fri 13-Apr-2007 13:05:45 PDT, vertical array azimuth attempt
I attempted to shoot the azmuths of of the sonics on the 30 M  tower using the
datascope   plus or minus .5 deg accy (shooting into the boom)
I didn't get too far due to a lot of leaves obscuring the view.

1.5 meter	94.8
3.0 meter	96.2
4.5 meter	95.6
6.0 meter	94.8 (this one mostly a guess due to limited clear view)
7.5 meter	90.1 (this reading not very believeable because only clear view
			was from a very steep angle)
9.0 meter	94.8
all sonics higher than 9 meters were blocked by foliage, or angle of view was
too steep

I also attempted to shoot the hot film azmuths, but I couldn't get a clear view
of them either.





148: pressure, Site 30m tower, Fri 13-Apr-2007 11:00:03 PDT, garden hose installed
Since last nights' data looked good from a lower port, we decided to try a 
larger pipe.  I installed a garden hose from about 0900-1010 today, plumbed
to the port back at 11m (and set it upright again).

147: pressure, Site 30m tower, Thu 12-Apr-2007 16:52:04 PDT, p' data rates lowered
Now that the tubing noise is reduced, I see the Paroscientific instrument noise
levels.  Thus, I've nudged the data rate down again:
1m Paro: PI=134, PR=48 => 3.85sps (~8ub resolution)
11m ncar: PI=67, PR=24 => 14.6sps (and PS still 128) (~1.6ub resolution)
This done about 16:52


146: pressure, Site 30m tower, Thu 12-Apr-2007 16:03:25 PDT, Spare quad-disk-port installed at 1m
For more pressure diagnosing, I have lashed Bill's spare port on the PAM
port boom and connected both his and my transducers to it.  This eliminates the
water pipe and provides a nearly side-by-side comparison to the reference
Paroscientific on the PAM port.  This was done about 15:00.
We'll run a while like this.


145: trh, Site 30m tower, Thu 12-Apr-2007 15:56:57 PDT, 6m TRH replaced
Since this T has been 0.1 deg low, it was replaced by the sensor just shipped
back from Boulder.
0101 removed 15:16
0502 installed 15:34 (but wait until 15:40 for fan to cool it down)

It took a while because the replacement fan was plugged into the wrong side
of the connector, which obviously had to be fixed.

141: pressure, Site 30m tower, Wed 11-Apr-2007 16:32:07 PDT, more p rate changes
To figure out the bump, I've been playing with paro sampling rates.
At about 15:44, I set:
P.1m: PI=34, PR=12 => 12.1 sps
p.ncar: PI=17, PR=6 => 41.7 sps

These settings had too much noise.

Just now (16:32), I set:
P.1m: PI=67, PR=24 => 7.2 sps
p.ncar: PI=34, PR=12 => 28.2 sps

Recall that p.ncar also has PS=128, running P7 command.

140: pressure, Site 30m tower, Wed 11-Apr-2007 12:55:21 PDT, p' removal instructions
Since I won't be here for tear-down, I thought I'd make a few notes about
removing the pressure stuff.
- To remove the port, I would:
	- lean out with a 5/8(?) wrench and disconnect the copper tubing
	- lean out with a ratcheting 7/16 and loosen the bolt on the top
	of the sonic boom about 1/2 a turn
	- swing the port towards the tower
	- lean out with 2 hands and loosen the Allen setscrews nearest the
	port while holding onto the port
	- put the port carefully in a backpack and lower it down
	- put a hauling line on the rest of the metal mount and fully remove
	the 7/16 top bolt
	- The ports (one more is on the shelf by the Motosat) were shipped in
	a separate cardboard in bubble wrap and peanuts, inside a baggie to
	keep peanuts from jamming between plates.
- To remove the water pipe:
	- disconnect the black Dekoran tubing at the bottom of the tube.
	- remove the adams (to avoid water damage)
	- remove the water -- I'd try making a small cut near the base of
	the tube with a hacksaw; you could also try loosening the bulkhead
	fitting on the bottom end cap
	- continue cutting off the end cap through the inner copper tube
        [SAVE this cap -- I want to keep the bulkhead fitting]
	- pull up the copper tubing from the top; coil up and save
	- undo the cable ties; drop the PVC tubing; cut up with hacksaw and
	discard (maybe Antonio wants some?)
- Disassemble the transducers:
	- Disconnect tubing on T at base of tarp
	- Bill's grey box came out more-or-less loose in a big cardboard box, 
	along with his tarp, bungies, and tubing.  The foam can be excessed.
	- The Pelican case foundation is ours for shipping TRHs
	- Disinter my Aluminum tube
	- **** IMPORTANT ****
	My sensor will be destroyed if it is shipped to Boulder with the
	pressure in the reference volume set to Dixon pressure.
	I need the following steps to be done, even though they are obnoxious.
	(may be easier to do in base trailer)  I'm sorry....
		- disconnect tubing at end cap
		- remove 8 screws (and black tape) securing the connector
		end cap
		- tip up closed end of tube a bit while pulling on the 
		connector end cap and pull out the transducer (about 8").
		- disconnect clear tubing on end of blue transducer on side
		opposite end cap (-).  Be somewhat careful.  There is squishy 
		grey foam around this fitting that needs to be pushed into
		transducer to get a wrench on the fitting.  There might be
		a slight release of air/nitrogen.
		- remove 2 Phillips screws holding transducer to cap
		- disconnect clear tubing from inside of bulkhead
		fitting on end cap
		- reconnect Phillips screws, with end of tubing
		loose inside milled indentation for bulkhead fitting
		- reconnect 8 screws
	- My sensor came wrapped in ping bubble wrap, laid near one side of
	the grey shipping case, and wedged with 2x6 chunks.  The rest of the
	case was filled with the box of fittings and tubing.
	

139: pressure, Site 30m tower, Wed 11-Apr-2007 12:38:32 PDT, p port now upside down
As part of the ongoing determination of why the p' sensors show noise at ~4 Hz,
I have just changed the port to be upside down (and thus now lower).  This
done ~12:00-12:17.  After this was done, I deliberately checked for mechanical
vibrations.  The biggest appears to be the entire boom vibrating in both
pitch and azimuth.  I induced a pitch oscillation of the port with a vertical
displacement of about +/-1 cm at ~12:16.  The frequency would have been a few
Hz.  No vibration at this frequency is obvious in the data.

(An oscillation is obvious, but is much slower -- perhaps due to my body motion
on the tower?)
138: pressure, Site 30m tower, Wed 11-Apr-2007 10:33:57 PDT, p.1m now 4sps
I just set PR=48 (and hopefully PI=134) on the Paro.  This should decrease the
resolution somewhat (5ppm, rather than 0.5ppm), but increase the sampling rate
to 4sps.

136: sonic, Site 30m tower, Tue 10-Apr-2007 23:30:27 PDT, needed to restart 4.5m sonic
data_stats showed that the 4.5m sonic wasn't reporting.  I got it going
by typing &d's at it using rserial.

We had this behaviour during TREX with 2 sonics -- we should check the serial 
numbers.

P.S. This is SN 1120.  The TREX sonic that was logged as misbehaving was 1123.
Did we have this problem in CuPIDO as well?

132: kh2o, Site 30m tower, Tue 10-Apr-2007 15:38:58 PDT, krypton at 14m strange
As I mentioned in status, the 14m krypton is strange.  Keith just reseated
the connectors, so we'll see if there is any change.  (Though a look with
prep() at the signal doesn't show any change.)  It is an intermittent
problem.

131: kh2o, Site 30m tower, Tue 10-Apr-2007 15:37:23 PDT, krypton 7.5 cleaned
Since I saw little change when Keith cleaned the krypton at 7.5m, I asked him
to do it again today (~1515).  I still see no change, so I guess it was
clean after all!  (But it is now the lowest voltage.)

129: pressure, Site 30m tower, Tue 10-Apr-2007 13:11:04 PDT, p.ncar installed
At long last, I've installed my p' sensor in the final configuration.  Note
that from ~12:30-1:00 p.usfs is also bad since I had to break into the pressure
line to install p.ncar.  p.ncar is buried under p.usfs -- I hope it survives
the rain forecast for tomorrow!

Note that it will take quite a while for the temperature of my reference volume
to equilibrate to its current position in the soil.  (The volume has been in
our air-conditioned trailer.)

The transducer reading is -6mb, so apparently my reference volume is at a 
reasonable pressure!

128: trh, Site 30m tower, Mon 09-Apr-2007 18:40:17 PDT, TRH recal info
Please enter this record of the laboratory recalibration of S/N 502 in
the CHATS logbook:

S/N 502 was originally at the 6 m level on the vertical tower and was
replaced with S/N 206 on March 21 (entry 31).  Ned and I had detected
the -0.3 deg C error in the profile plots.  We will send it out to
replace the TRH currently at 6 m (S/N 101) which we removed from the
horizontal array (entry 93) because it appears to be in error by -0.1
deg C.  Send S/N 101 back for laboratory recalibration.

Thanks,
Tom

-------- Original Message --------
Subject: 	T check on TRH502
Date: 	Mon, 09 Apr 2007 08:48:37 -0600
From: 	steve semmer 
To: 	Tom Horst 

Here is the result of the temperature check on TRH502. It had a mean
error of -.3133 C (sensor - ref). If we want we could use this as a
correction to the data when this sensor was deployed. New coefficients
will be computed.

Steve

8/20/07:

The -0.1 degree temperature error in S/N 101 was also confirmed in the
NCAR Calibration Laboratory:



-------- Original Message --------
Subject: Post CHATS TRH info
Date: Tue, 07 Aug 2007 12:06:23 -0600
From: steve semmer 
To: Tom Horst 

Attached is .txt file showing the post cal results for the TRH sensors.
The RH were checked over 10% to 90%  (20% steps) at 25C.
The temperature were checked over the range of 0 to 40 C (10 degree
steps).

Steve

CHATS TRH POST CAL					

TRH	mean T error (sensor - ref)    mean RH
error (sensor - ref)
	apr/may	jun			
704		0.004			0.45
5		0.084			2.02
204		-0.052			1.64
206		0.016			1.39
502	-0.313	-0.062			0.76
7		-0.018			3.25
6		0.035			0.14
104		-0.030			1.85
702		-0.001			1.53
701		-0.061			0.08
1		-0.008			0.26
8		0.043			-0.31
4		-0.008			1.02
101	-0.099	-0.006			0.56
3		0.043			-1.01
703		0.251			0.05


All sensors were calibrated pre CHATS					
Sensors in the apr/may column were re-calibrated on the following dates:				
 S/N 502 -  4/9/07
 S/N 101 -  5/2/07
 

125: rad_soil, Site 30m tower, Mon 09-Apr-2007 08:22:43 PDT, soil samples
I've set up the corer to take 0-3 and 3-6cm cores.  I'm processing the entire 
3cm-thick core as one "aloquot".  I've been turning the oven off between 
samples.

4/9:
This should be considered close to the driest case.  The soil crumbled out of
the corer on my first try.  I undercut the corer with the trowel and tilted
it out of the hole to recover the final core.  Nevertheless, the clay-like
clumps do have some internal adhesion.

I got "bad TDR level" on the TRIME when using the normal probe at 1 location.
I then tried the removable probe and got a reading of 17.4-18.0%.
I then moved the removable to another site and got the 23.4% noted below.
Thus, I'm worried about the soil salinity -- we'll have to watch it.

NOTE!!! I left the removable probes in the 23.4 location.  Future readings
should use these.  They are about 2m to the South and slightly West of the
fixed soil probe stake (with the orange flagging).

4/12:
Slightly moister upper layer after 1mm of rain.  Still a lot of variability 
in TRIME readings, even using prongs that have had a lot of time to settle.  
Actual readings were: 24.1, 25.0, 26.1, 24.7.  
Some of the core dirt pushed out of 0-3 and also there was some spillage.  
Thus 0-3 probably is 0-3.6, 3-6 is 3.6-6.6cm.  I wouldn't use this 0-3 for 
density.

4/15:
Morning after irrigation AND rain, so probably the wettest it is going to get!
0-3 was not quite deep enough, so don't know about bulk density.
TRIME was reasonably consistent: 34.4, 34.6, 34.7.

Date	Time	TRIME	0-3 Wet	0-3 Dry	%	3-6 Wet	3-6 Dry	%	
4/9	07:30	23.4	79.9	74.7	7.0	98.3	88.5	11.1
4/12	11:45	25.0	126.8	117.6	7.8	92.9	83.2	11.7
4/15	09:00	34.6	84.0	61.9	26.3	123.2	97.2	21.1



124: communications, Site 30m tower, Sun 08-Apr-2007 18:47:12 PDT, power cycled hub in lower
We lost communications to the 30m tower this afternoon.  After trying lots of
things (and it not being quite as high a priority as all the other stuff that
Keith just discussed), I just cycled power on the hub, which appears to have
gotten things working.  Unfortunately, we still have the 16% packet dropouts
which is causing Gordon to be unable to update the hotfilm acquisition code.
Thus, the triple-film probes probably still have the channel shift problem
but the singles on hfarray should now be running his new code.

119: rad_soil, Site 30m tower, Sun 08-Apr-2007 18:24:07 PDT, Radiometer Cleaned
The radiometers just west of the 30 meter tower where cleaned today after the Saturday morning tree spraying.


118: pressure, Site 30m tower, Sun 08-Apr-2007 18:22:16 PDT, 11m pressure sensor tube on 30m Tower Filled
The 11 meter pressure sensor tube on the 30 meter tower was filled with water.  No leaks where detected.

Also added one more cable tie to the copper tubing at the top to lessen 
vibration of the tube.

Also Tee-d off Steve's Paro with Bill's xducer and connected the Paro to
lower's ttyS9, but still not getting data.

117: data system, Site 30m tower, Sun 08-Apr-2007 18:17:41 PDT, Power Board on Viper Data System Replaced
While examining the inside of the Viper Data System on the 30 meter tower, I noticed that the connector on the power board of the PC104 stack had a broken solder connection.  The power board from the spare PC104 stack was used to replace it.
116: kh2o, Site 30m tower, Sun 08-Apr-2007 18:16:16 PDT, KH2O Sensors on the 30m Tower Cleaned
All KH2O sensors where cleaned on the 30 meter tower after the Saturday morning spraying of the trees.  Distilled water and QTips where used to clean them.

115: hot films, Site 30m tower, Sun 08-Apr-2007 18:12:49 PDT, Reinstalled Triple Hot Film Elements
After the tree spraying Saturday morning, the triple wire Hot Films where reinstalled on the 30 meter tower starting the lowest and working upward.

P.S.
I  this was the time when we installed the new data acquistion code via
the spare Pocketec to avoid the channel slip problem.

111: pressure, Site 30m tower, Sat 07-Apr-2007 16:51:28 PDT, config mods for upper
In an attempt to determine why the p' signal has a peak at 4Hz, we ran upper
with a base sampling rate of 400 (rather than 200) sps during the period 
~15:58-16:45.  Everything should be back to normal now, but upper has been
restarted several times.

109: communications, Site 30m tower, Sat 07-Apr-2007 11:19:40 PDT, hftower network problem
Yesterday afternoon we started having network problems with hftower and it is
now mostly down.  I reseated many of the cables at about 1730 yesterday but
found no obvious problems.  Next steps would be swapping cables between 
hftower and upper and checking the cable itself going up the tower from
lower [with the hub] and hftower.  These will have to wait until tomorrow
when we can reenter the field.  Since hotfilms are all down, we aren't losing
data in the meantime.

106: pressure, Site 30m tower, Sat 07-Apr-2007 09:48:18 PDT, p' tests
Gordon got the A/D code running early yesterday afternoon.  The main fix was
to change the Diamond A/D card to interrupt #7.

By that time, we
also had added a fuse to get Bill's transducer going.  Bill and I checked
whether his transducer gain was 25 mV/ub (as per the factory/Bedard spec) or
18.6 mV/ub (as per my test in the wind tunnel last month).  We lifted the
box several times by 1.5m, between ~15:05-15:18.  I'll be looking at the 
data soon, but our impression using the DVM was that 18.6 probably was correct.
dp = rho g H; rho~1.23, g~9.81, H~1.5 => 18Pa = 1.8ub => 45mV@25 mV/ub or 
33mV@18.6 mV/ub.  Our impression was that we were seeing closer to 33mV steps.
[Also, I need to calculate rho for the exact conditions at this time.]



104: pressure, Site 30m tower, Fri 06-Apr-2007 08:45:44 PDT, p' port connected
I just connected the quad-disk probe to the "water pipe".  This completes the
installation of the p' sensor (using Bill's transducer), with the exception of
needing to fill the pipe.

Don and I go to Davis today to fill my reservoir with N2, which I need to do
before deploying my transducer.

We expect Gordon to load the software to drive the A/D board later this morning.

103: adams, Site 30m tower, Thu 05-Apr-2007 18:49:10 PDT, upper data collection restarted
Apparently, upper didn't restart correctly when I did the A/D board install 
this morning.  All the Emerald channels (everything above 9m) were not being
recorded.  I restarted with an "adn" and "aup" and everything now appears
normal.  This may have been due to the GPS hanging when I powered up the
system (which was due to the lid of the box covering the GPS receiver when
it was open!).  I finally fixed the lid problem, but apparently the system
wasn't happy.

I'm sorry!!

101: whatever, Site 30m tower, Thu 05-Apr-2007 17:00:55 PDT, tower climbing
To begin the p' sensor install, I climbed at various times between 1445-1645.
The 11m sonic was tilted up from ~1445-1530.
90: rad_soil, Site 30m tower, Mon 02-Apr-2007 16:20:31 PDT, radiometers 'dusted' by mowing
The radiometers have been subjected to dust clouds due to mulching and mowing
since about 15:00.  Don and Keith cleaned radiometers and 1.5 m kh2o.
74: whatever, Site 30m tower, Fri 30-Mar-2007 15:14:57 PDT, Heights of scintillometer and particle counter
Jan Kleissl plans to install his scintillometer on the 30 m tower.  We
are measuring 4-component radiation at a height of 16 m, so we would
like to minimize the influence of the scintillometer as much as
possible.  The influence of scintillometer on the radiation measurements
will decrease with the cosine of the angle from the zenith at which 
the instrument is seen by the radiometers and with the square of the distance 
between the scintillometer and the radiometers.

Let z be the height difference between the radiometers and the
scintillometer and x be the horizontal spacing between them, roughly the
length of the radiometer boom.  Then the cosine of the viewing angle is
z/sqrt(x^2 + z^2) and the distance between them is sqrt(x^2 + z^2).
The relative influence at different mounting heights is then

z/(x^2+z^2)^1.5

The radiometer boom is roughly 1 m long.
The maximum influence occurs at z = x/sqrt(2) = 0.7x, where the relative
influence is equal to 1/(sqrt(2)*1.5^1.5) = 0.385

The influence is 10% of its peak value at z = 5 m or a height of 21 m.  

There are sonics at heights of 18 m and 23 m, so halfway between them
would be 20.5 m, where the influence is 12% of its peak value.

Andreas Held is installing his particle counter at the 14 m sonic.
According to Andrew, he can place it a "meter or so" above or below
the sonic, so we should put it as far below as Andreas thinks feasible.
Mounting his instrument at the height of the boom would have an
influence of 46% of its peak value.  1 m lower at 13 m would place it 
3 m below the radiometers and reduce the influence to 25% of its peak value; 
2 m lower at 12 m would reduce the influence to 15% of its peak value.

72: hot films, Site 30m tower, Fri 30-Mar-2007 12:52:59 PDT, Reinstalled hot films on tower
Installed hot film sensors on vertical tower.  Started hftower adam at
12:53.


71: rain, Site 30m tower, Thu 29-Mar-2007 10:49:00 PDT, installed rain gauge
Steve installed the rain gauge and made some test tips around 10:45 PDT
60: hot films, Site 30m tower, Mon 26-Mar-2007 10:42:06 PDT, deployment and removal of triple hot films
Deployed hot films late Saturday afternoon, 3/25 07:07 GMT.

10/11/07, TWH:  This time makes no sense.  It would be midnight PDT!
                Looking at the hot film data file, this time should be
                00:07:07 GMT

Stopped data collection 3/26 17:52 GMT.
ssh root@hftower
password: ...

root@hftower root# adn
Stopping adam ...
kill -HUP 875 876 878 879 880 882 883 ...
kill -HUP 876 ...
kill -HUP 876 ...
done
Unmounting /var/tmp/usbdisk ... done

Removed hot films and retrieved pocketec, ~11:10 - 11:30 PDT




57: sonic, Site 30m tower, Mon 26-Mar-2007 08:48:49 PDT, Removed sonic 0740 from vertical tower
Late Saturday afternoon, Mar 24, I removed S/N 0740 sonic from the vertical 
tower.  It had been at ~2 m but not plugged into the data system.
55: rad_soil, Site 30m tower, Sun 25-Mar-2007 18:12:38 PDT, Installed surface radiometers
Steve and Ned completed installation of the surface radiometers around
17:25 PDT, March 25.


47: adams, Site 30m tower, Sat 24-Mar-2007 12:23:23 PDT, upper adam front panel port 16 bad.
29 m TRH stopped on March 20.  Discovered today that there was no power 
output by ttyS16 upper.  Problem was port ttyS16 on front panel.
Steve moved internal S16 ribbon cable to ttyS19 front panel port.


39: trh, Site 30m tower, Fri 23-Mar-2007 11:03:15 PDT, Installed TRH 502 at 1.5 m
Installed TRH 502, with bad T, at 1.5 m to test RH.
Installed at 11:02 PDT.

16:55 PDT: Replaced original TRH, S/N 004, at 1.5 m.  
17:40: Took several unplug/plug sequences to get it going.



36: sonic, Site 30m tower, Thu 22-Mar-2007 16:58:09 PDT, 6 m sonic replacement
This morning, we replaced sonic 0740 at 6 m on vertical tower with sonic 0119.
Moved sonic 0740 to TRH boom at 1.70 m + 32 cm.  Thus sonic is at a 
height  of 1.70 m + 32 cm + 5 cm = 2.07 m.

Plugged sonic 0740 into 1.5 m serial port, lower ttyS1.

17:55: plugged 1.5 m sonic, S/N 0673, back into lower ttyS1.

3/23:  From missing kh2o data at 1.5m, I see that sonic 0740 was 
       on ttyS1 from 11:20 - 17:55 PDT

35: sonic, Site 30m tower, Wed 21-Mar-2007 18:04:38 PDT, Changed 6 m sonic "dc" parameter to 0
I talked  with Larry Jacobsen at CSI about sonic sampling problem.   It appears
that the sonic just can't keep up with 60 Hz.  It does not miss samples at
30 Hz and Larry speculates that we might fix this by narrowing the time window
whithin which the sonic looks for the received signal (my interpretation of
what he told me).  The way to narrow the window is to decrease the DC
parameter to 0, which is by default 1 for 60 Hz, using the terminal command
'dc -' (dc + increments DC).  Note that the default DC parameter is larger for
slower sampling rates.

So far I have been unsuccessful reducing the DC parameter for sonic 9b while
it is misbehaving.  I could presumably do it  for sonic 6m because it was
behaving at the time.

In the process, I did not get the sonic going again until 18:12.
33: sonic, Site 30m tower, Wed 21-Mar-2007 13:24:58 PDT, Changed 6m data rate to 10 Hz
Changed 6m sonic data output rate to 10 Hz to try to fix.  Short data dump
suggests better behavior.  Switched back to 60 Hz and data bad again.

Did this test between 1300 and 1330.
31: trh, Site 30m tower, Wed 21-Mar-2007 10:44:24 PDT, Replaced 6 m TRH
Steve replaced the 6 m TRH with the one removed from horizontal array, 
S/N 206.

The original 6 m shield had a loose inner tube, so moved the 1.5 m shield to
6 m.  The 1.5 m trh has no shield at this time.

3/22:  The temperature profiles look much better now.

At some point today Steve fixed the shield and installed it at 1.5 m.

30: kh2o, Site 30m tower, Wed 21-Mar-2007 09:14:32 PDT, 10 m kh2o mount changed
On Tuesday, Mar 20, Steve changed the 10 m krypton from the south to the
north side of the sonic in order to not interfere with the hot film.

28: rad_soil, Site 30m tower, Tue 20-Mar-2007 08:55:38 PDT, radiometer footprint
I have calculated the footprint for a downward looking radiometer:

The footprint is h^2/(r^2 + h^2)^2 where h is the height of the radiometer
and r is radial distance on the surface from a point immediately below
the radiometer.  Thus the footprint has a maximum directly below the 
radiometer equal to 1/h^2, drops to 0.5/h^2 at r/h ~ 0.6, 0.25 at
r = 1, and 0.01 at r=3.

The cumulative footprint is r^2/(r^2 + h^2).  The cumulative footprint
equals 0.5 at r/h = 1, 0.9 at r/h = 3, and 0.99 at r/h = 10.





26: rad_soil, Site 30m tower, Mon 19-Mar-2007 12:37:31 PDT, Moved 16m 4-component radiation to point ~SW
Moved 4 component radiation to NW face of tower, so that the boom is now 
pointing to ~210 degrees.

The height of the top of boom is 15.67+0.32 = 15.99m


25: sonic, Site 30m tower, Mon 19-Mar-2007 12:25:36 PDT, Installed 12.5 m sonic
We (Steve S, Ned Patton, Tom) installed another sonic at 12.5 m on the
vertical tower.  S/N 0743, 12.17+0.05+0.32 = 12.54m


24: sonic, Site 30m tower, Mon 19-Mar-2007 11:50:48 PDT, swapped 4.5 and 6 m sonics
Swapped 4.5 m (ttyS5) and 6 m (S6) sonics on lower adam at 10:39 PDT.  
So far the undersampling error has not re-occured.

Swapped cables back at 12:08 PDT

22: trh, Site 30m tower, Sun 18-Mar-2007 16:48:25 PDT, 6 m T; 3 (or 1.5) m RH
The 6 m T appears to be ~ 0.3 deg C too low;

Either the 3 m RH is high or the 1.5 m RH is low....

21: rad_soil, Site 30m tower, Sun 18-Mar-2007 10:34:55 PDT, Started zigbee radio for rad stand
Steve started zigbee radio for radiation stand.  Only have soil sensors at this
time.
17: trh, Site 30m tower, Sat 17-Mar-2007 13:54:58 PDT, TRH heights
30 m tower heights - clone of entry 14
Heights are (m agl) to top of boom - 32 cm.
Note sonic is 5 cm above boom and TRH inlet is 47 cm below boom.

Port	Location	S/N	Height	Height(AGL)	Height	Height(AGL)
			Sonic		(+37 cm)	TRH	(-15 cm)
--------------------------------------------------------------------------
S10,up	29 m		0744	28.66	29.03		28.66	28.51
S9, up	23 m		1117	22.70	23.07		22.70	22.55
S8, up	18 m		0738	17.67	18.04		17.67	17.52
S7, up	14 m		1123	13.72	14.09		13.72	13.57
S6, up	11 m		0364	10.76	11.13		11.27	11.12
S5, up	10 m		0671	9.66	10.03		10.19	10.04
S2, up	9 m		0536	8.65	9.02		9.19	9.04
S7, lo	7.5 m		0540	7.25	7.62		7.80	7.65
S6, lo	6 m		0740	5.70	6.07		6.22	6.07
S5, lo	4.5 m		1120	4.17	4.54		4.69	4.54
S2, lo	3 m		0674	2.74	3.11		3.26	3.11
S1, lo	1.5 m		0673	1.17	1.54		1.70	1.55

3/22:

Measured heights of booms for TRH's on horizontal array:

10.13 m - 0.47 m = 9.66 m
11.14 m - 0.47 m = 10.67 m

























16: pressure, Site 30m tower, Sat 17-Mar-2007 13:48:57 PDT, Installed pressure port at surface
Installed pam pressure port below the 1.5 m TRH.
15: rad_soil, Site 30m tower, Sat 17-Mar-2007 13:43:24 PDT, 4-comp radiation height
Installed 4-comp radiation at 15.69 (top of boom) + 0.32 = 16.01 m agl

boom is pointing to ~150 degrees.



14: sonic, Site 30m tower, Fri 16-Mar-2007 15:25:20 PDT, Sonic heights and S/N's
30 m tower heights 
Heights are (m agl) to top of boom - 32 cm.
Note sonic is 5 cm above boom and TRH inlet is 47 cm below boom.

Port	Location	S/N	Height	Height(AGL)	Height	Height(AGL)
			Sonic		(+37 cm)	TRH	(-15 cm)
--------------------------------------------------------------------------
S10,up	29 m		0744	28.66	29.03		28.66	28.51
S9, up	23 m		1117	22.70	23.07		22.70	22.55
S8, up	18 m		0738	17.67	18.04		17.67	17.52
S7, up	14 m		1123	13.72	14.09		13.72	13.57
S17, up	12.5m		0743	12.17	12.54	(3/19/07)
S6, up	11 m		0364	10.76	11.13		11.27	11.12
S5, up	10 m		0671	9.66	10.03		10.19	10.04
S2, up	9 m		0536	8.65	9.02		9.19	9.04
S7, lo	7.5 m		0540	7.25	7.62		7.80	7.65
S6, lo	6 m		0740	5.70	6.07		6.22	6.07
S5, lo	4.5 m		1120	4.17	4.54		4.69	4.54
S2, lo	3 m		0674	2.74	3.11		3.26	3.11
S1, lo	1.5 m		0673	1.17	1.54		1.70	1.55

























4: rad_soil, Site 30m tower, Wed 14-Mar-2007 10:35:05 PDT, Soil sensor location, s/numbers
I installed the soil sensors at a depth of 5 cm, south of the sawhorse and at
the boundary between bare ground and clover.  See previous logbook entry for
discussion of surface types. They are close to being directly west of a tree.

I installed the soil heat flux plate at 5 cm with the dot on top.  I installed 
the ECH2O and TPO1 sensors with a vertical orientation to avoid blocking 
vertical water migration.  I installed the soil temperature probe at a
45 degree angle starting near the surface.

The serial numbers are:

HFT	14983123	38.2 W/m^2 per V
Qsoil	No serial number
TPO1	200239		175.8 uV/degK
Soil T	STP 94017

3: rad_soil, Site 30m tower, Wed 14-Mar-2007 10:27:50 PDT, Installed sawhorse
The radiation sawhorse has been installed at the 30 m tower.  It is
located one tree row north and 3 rows west of the tower.
  
There are two distinct types of surfaces.  The surface between the trees in
a  N/S row is bare ground.  The surface between the N/S tree rows has a
ground cover of clover.  I oriented the sawhorse in a N/S direction and
aligned the horizontal beam along a border between clover and bare ground
in order to sample equally both types of surface.  

The height of the middle of the horizontal sawhorse beam is 2 m +/- a few 
centimeters.  It is 120 cm west of the tree line and centered N/S between
two trees.