Entry
| Date
| Title
| Site
| Author
| #Graphics
|
209 | Sun 15-Aug-2004 | Sounding Bahia Kino 16 August 0000Z | ISS3 (Bahia Kino) | Rebeca
|
208 | Sun 15-Aug-2004 | Daily Report for August 15 | ISS3 (Bahia Kino) | Rebeca
|
207 | Sun 15-Aug-2004 | Sounding Bahia Kino 15 August 12Z | ISS3 (Bahia Kino) | Heather
|
206 | Sat 14-Aug-2004 | Daily Report for August 14 | ISS3 (Bahia Kino) | Heather
|
205 | Sat 14-Aug-2004 | Sounding Bahia Kino 15 August 00Z | ISS3 (Bahia Kino) | Heather
|
204 | Sat 14-Aug-2004 | Sounding Bahia Kino 14 August 12z | ISS3 (Bahia Kino) | Jennifer
|
203 | Fri 13-Aug-2004 | Sounding Bahia Kino 14 August 0z | ISS3 (Bahia Kino) | Jennifer
|
202 | Fri 13-Aug-2004 | Daily Report for August 13 | ISS3 (Bahia Kino) | Rebeca
|
201 | Fri 13-Aug-2004 | Sounding Bahia Kino 13 August 1800Z | ISS3 (Bahia Kino) | Rebeca
|
200 | Fri 13-Aug-2004 | Sounding Bahia Kino 13 August 1200Z | ISS3 (Bahia Kino) | Rebeca
|
199 | Fri 13-Aug-2004 | Sounding Bahia Kino 13 August 6Z | ISS3 (Bahia Kino) | Heather
|
198 | Thu 12-Aug-2004 | Daily Report for August 12 | ISS3 (Bahia Kino) | Rebeca
|
197 | Thu 12-Aug-2004 | Sounding Bahia Kino 13 August 0z | ISS3 (Bahia Kino) | Jennifer
|
196 | Thu 12-Aug-2004 | Sounding Bahia Kino 12 August 1800z | ISS3 (Bahia Kino) | Rebeca
|
195 | Thu 12-Aug-2004 | Sounding Bahia Kino 12 August 12z | ISS3 (Bahia Kino) | Jennifer
|
194 | Thu 12-Aug-2004 | Sounding Bahia Kino 12 August 0600Z | ISS3 (Bahia Kino) | Rebeca
|
193 | Wed 11-Aug-2004 | Sounding Bahia Kino 12 August 0000Z | ISS3 (Bahia Kino) | Rebeca
|
192 | Wed 11-Aug-2004 | Daily Report for August 11 | ISS3 (Bahia Kino) | Rebeca
|
190 | Wed 11-Aug-2004 | Kino Roving team visit | ISS3 (Bahia Kino) | June
|
189 | Wed 11-Aug-2004 | Sounding Bahia Kino 11 August 18Z | ISS3 (Bahia Kino) | Heather
|
188 | Wed 11-Aug-2004 | Sounding Bahia Kino 11 August 12z | ISS3 (Bahia Kino) | Jennifer
|
187 | Wed 11-Aug-2004 | Sounding Bahia Kino 11 August 0600z | ISS3 (Bahia Kino) | Rebeca
|
186 | Tue 10-Aug-2004 | Sounding Bahia Kino 11 August 0z | ISS3 (Bahia Kino) | Jennifer
|
185 | Tue 10-Aug-2004 | Sounding Bahia Kino 10 August 18z | ISS3 (Bahia Kino) | Jennifer
|
184 | Tue 10-Aug-2004 | Daily Report for August 10 | ISS3 (Bahia Kino) | Rebeca
|
183 | Tue 10-Aug-2004 | Sounding Bahia Kino 10 August 12Z | ISS3 (Bahia Kino) | Heather
|
182 | Tue 10-Aug-2004 | Sounding Bahia Kino 10 August 0600Z | ISS3 (Bahia Kino) | Heather
|
181 | Mon 09-Aug-2004 | Sounding Bahia Kino 10 August 00Z | ISS3 (Bahia Kino) | Rebeca
|
180 | Mon 09-Aug-2004 | Daily Report for August 9 | ISS3 (Bahia Kino) | Heather
|
179 | Mon 09-Aug-2004 | Sounding Bahia Kino 9 August 18Z | ISS3 (Bahia Kino) | Heather
|
178 | Mon 09-Aug-2004 | Sounding Bahia Kino 9 August 1200z | ISS3 (Bahia Kino) | Rebeca
|
177 | Sun 08-Aug-2004 | Daily Report for August 8 | ISS3 (Bahia Kino) | Rebeca
|
176 | Sun 08-Aug-2004 | Sounding Bahia Kino 9 August 0000z | ISS3 (Bahia Kino) | Rebeca
|
175 | Sun 08-Aug-2004 | Sounding Bahia Kino 8 August 12z | ISS3 (Bahia Kino) | Jennifer
|
174 | Sun 08-Aug-2004 | Sounding Bahia Kino 8 August 0600Z | ISS3 (Bahia Kino) | Rebeca
|
173 | Sat 07-Aug-2004 | Sounding Bahia Kino 8 August 0000Z | ISS3 (Bahia Kino) | Rebeca
|
172 | Sat 07-Aug-2004 | Daily Report for August 7 | ISS3 (Bahia Kino) | Heather
|
171 | Sat 07-Aug-2004 | Sounding Bahia Kino 7 August 18Z | ISS3 (Bahia Kino) | Heather
|
170 | Sat 07-Aug-2004 | Sounding Bahia Kino 7 August 12z | ISS3 (Bahia Kino) | Jennifer
|
169 | Sat 07-Aug-2004 | Sounding Bahia Kino 7 August 0600z | ISS3 (Bahia Kino) | Rebeca
|
168 | Fri 06-Aug-2004 | Sounding Bahia Kino 7 August 0000z | ISS3 (Bahia Kino) | Rebeca
|
167 | Fri 06-Aug-2004 | Daily Report for August 6 | ISS3 (Bahia Kino) | Jennifer
|
166 | Fri 06-Aug-2004 | Sounding Bahia Kino 6 August 18z | ISS3 (Bahia Kino) | Jennifer
|
165 | Fri 06-Aug-2004 | Power Outage at 12z launch! | ISS3 (Bahia Kino) | Jennifer
|
164 | Fri 06-Aug-2004 | Sounding Bahia Kino 6 August 12z | ISS3 (Bahia Kino) | Jennifer
|
163 | Fri 06-Aug-2004 | Sounding Bahia Kino 6 August 0600z | ISS3 (Bahia Kino) | Rebeca
|
162 | Fri 06-Aug-2004 | Daily Report for August 5 | ISS3 (Bahia Kino) | Rebeca
|
161 | Thu 05-Aug-2004 | Sounding Bahia Kino 6 August 0000z | ISS3 (Bahia Kino) | Rebeca
|
160 | Thu 05-Aug-2004 | Power Outage! | ISS3 (Bahia Kino) | Jennifer
|
159 | Thu 05-Aug-2004 | Sounding Bahia Kino 5 August 18z | ISS3 (Bahia Kino) | Jennifer
|
158 | Thu 05-Aug-2004 | Sounding Bahia Kino 5 August 12z | ISS3 (Bahia Kino) | Jennifer
|
157 | Wed 04-Aug-2004 | Sounding Bahia Kino 5 August 0000Z RE-LAUNCH | ISS3 (Bahia Kino) | Rebeca
|
156 | Wed 04-Aug-2004 | Daily Report for August 4 | ISS3 (Bahia Kino) | Rebeca
|
155 | Wed 04-Aug-2004 | Sounding Bahia Kino 5 August 0000Z | ISS3 (Bahia Kino) | Rebeca
|
154 | Wed 04-Aug-2004 | Sounding Bahia Kino 4 August 12Z | ISS3 (Bahia Kino) | Heather
|
153 | Wed 04-Aug-2004 | Sounding Bahia Kino 4 August 0600z | ISS3 (Bahia Kino) | Jennifer
|
152 | Tue 03-Aug-2004 | Daily Report for August 2 | ISS3 (Bahia Kino) | Rebeca
|
151 | Tue 03-Aug-2004 | Sounding Bahia Kino 4 August 0Z | ISS3 (Bahia Kino) | Heather
|
150 | Tue 03-Aug-2004 | Sounding Bahia Kino 3 August 1800z | ISS3 (Bahia Kino) | Jennifer
|
149 | Tue 03-Aug-2004 | Sounding Bahia Kino 3 August 1200z | ISS3 (Bahia Kino) | Heather
|
148 | Mon 02-Aug-2004 | Daily Report for August 3 | ISS3 (Bahia Kino) | Heather
|
147 | Mon 02-Aug-2004 | Sounding Bahia Kino 3 August 0z | ISS3 (Bahia Kino) | Jennifer
|
146 | Mon 02-Aug-2004 | Sounding Bahia Kino 2 August 1200Z | ISS3 (Bahia Kino) | Rebeca
|
144 | Sun 01-Aug-2004 | Daily Report for August 1 | ISS3 (Bahia Kino) | Heather
|
143 | Sun 01-Aug-2004 | Sounding Bahia Kino 2 August 0Z | ISS3 (Bahia Kino) | Heather
|
142 | Sun 01-Aug-2004 | Sounding Bahia Kino 1 August 1800Z | ISS3 (Bahia Kino) | Rebeca
|
141 | Sun 01-Aug-2004 | Sounding Bahia Kino 1 August 12Z | ISS3 (Bahia Kino) | Heather
|
140 | Sun 01-Aug-2004 | Sounding Bahia Kino 1 August 0600z | ISS3 (Bahia Kino) | Jennifer
|
139 | Sat 31-Jul-2004 | Daily Report for July 31 | ISS3 (Bahia Kino) | Heather
|
138 | Sat 31-Jul-2004 | Sounding Bahia Kino 1 August 0Z | ISS3 (Bahia Kino) | Heather
|
137 | Sat 31-Jul-2004 | Sounding Bahia Kino 31 July 1200z | ISS3 (Bahia Kino) | Jennifer
|
136 | Fri 30-Jul-2004 | Daily Report for July 30 | ISS3 (Bahia Kino) | Jennifer
|
135 | Fri 30-Jul-2004 | Sounding Bahia Kino 31 July 0z | ISS3 (Bahia Kino) | Jennifer
|
134 | Fri 30-Jul-2004 | Sounding Bahia Kino 30 July 1200Z | ISS3 (Bahia Kino) | Rebeca
|
133 | Thu 29-Jul-2004 | Sounding Bahia Kino 30 July 0000Z | ISS3 (Bahia Kino) | Rebeca
|
132 | Thu 29-Jul-2004 | Roving team COMMENTS ON LOS MOCHIS | ISS3 (Bahia Kino) | Steve/John
|
131 | Thu 29-Jul-2004 | Roving team notes for July 29 | ISS3 (Bahia Kino) | Steve/John
|
130 | Thu 29-Jul-2004 | Daily Report for July 29 | ISS3 (Bahia Kino) | Heather
|
129 | Thu 29-Jul-2004 | Sounding Bahia Kino 29 July 18Z | ISS3 (Bahia Kino) | Rebeca
|
128 | Thu 29-Jul-2004 | Sounding Bahia Kino 29 July 1200Z | ISS3 (Bahia Kino) | Rebeca
|
127 | Thu 29-Jul-2004 | Sounding Bahia Kino 29 July 06Z | ISS3 (Bahia Kino) | Heather
|
126 | Wed 28-Jul-2004 | Daily Report for July 28 | ISS3 (Bahia Kino) | Jennifer
|
125 | Wed 28-Jul-2004 | Sounding Bahia Kino 29 July 0z | ISS3 (Bahia Kino) | Jennifer
|
124 | Wed 28-Jul-2004 | Sounding Bahia Kino 28 July 1800Z | ISS3 (Bahia Kino) | Rebeca
|
123 | Wed 28-Jul-2004 | Sounding Bahia Kino 28 July 1200Z | ISS3 (Bahia Kino) | Rebeca
|
122 | Wed 28-Jul-2004 | Sounding Bahia Kino 28 July 0600Z | ISS3 (Bahia Kino) | Rebeca
|
121 | Tue 27-Jul-2004 | Sounding Bahia Kino 28 July 0Z | ISS3 (Bahia Kino) | Steve/John
|
120 | Tue 27-Jul-2004 | Roving team notes from LORETO visit | ISS3 (Bahia Kino) | Steve/John
|
119 | Tue 27-Jul-2004 | Roving team notes | ISS3 (Bahia Kino) | Steve/John
|
118 | Tue 27-Jul-2004 | Profiler performance | ISS3 (Bahia Kino) | Steve/John
|
117 | Tue 27-Jul-2004 | Profiler data backup and down time (NAME_KIN03) | ISS3 (Bahia Kino) | Steve/John
|
116 | Tue 27-Jul-2004 | Sounding Bahia Kino 27 July 12z | ISS3 (Bahia Kino) | Rebeca
|
115 | Tue 27-Jul-2004 | Daily Report for July 26 | ISS3 (Bahia Kino) | Jennifer
|
114 | Mon 26-Jul-2004 | Sounding Bahia Kino 27 July 0z | ISS3 (Bahia Kino) | Jennifer
|
113 | Mon 26-Jul-2004 | Sounding Bahia Kino 26 July 12z | ISS3 (Bahia Kino) | Jennifer
|
112 | Mon 26-Jul-2004 | Power Outage! | ISS3 (Bahia Kino) | Brad
|
111 | Sun 25-Jul-2004 | Daily Report for July 25 | ISS3 (Bahia Kino) | Jennifer
|
110 | Sun 25-Jul-2004 | Sounding Bahia Kino 26 July 0z | ISS3 (Bahia Kino) | Jennifer
|
109 | Sun 25-Jul-2004 | Sounding Bahia Kino 25 July 12Z | ISS3 (Bahia Kino) | Rebeca
|
108 | Sat 24-Jul-2004 | Daily Report for July 24 | ISS3 (Bahia Kino) | Heather
|
107 | Sat 24-Jul-2004 | Sounding Bahia Kino 25 July 0Z | ISS3 (Bahia Kino) | Heather
|
106 | Sat 24-Jul-2004 | Sounding Bahia Kino 24 July 12Z | ISS3 (Bahia Kino) | Heather
|
105 | Fri 23-Jul-2004 | Daily Report for July 23 | ISS3 (Bahia Kino) | Heather
|
104 | Fri 23-Jul-2004 | Sounding Bahia Kino 24 July 0z | ISS3 (Bahia Kino) | Heather
|
103 | Fri 23-Jul-2004 | Sounding Bahia Kino 23 July 12z | ISS3 (Bahia Kino) | Jennifer
|
102 | Fri 23-Jul-2004 | Daily Report for July 22 | ISS3 (Bahia Kino) | Jennifer
|
101 | Thu 22-Jul-2004 | Sounding Bahia Kino 23 July, 0z | ISS3 (Bahia Kino) | Brad
|
100 | Thu 22-Jul-2004 | Profiler failure | ISS3 (Bahia Kino) | Steve/John
|
99 | Thu 22-Jul-2004 | Roving team notes: Thursday July 22 | ISS3 (Bahia Kino) | Steve/John
|
98 | Thu 22-Jul-2004 | Sounding Bahia Kino 22 July 18Z | ISS3 (Bahia Kino) | Heather
|
97 | Thu 22-Jul-2004 | Sounding Bahia Kino 22 July 12Z | ISS3 (Bahia Kino) | Heather
|
96 | Thu 22-Jul-2004 | Sounding Bahia Kino 22 July 6Z | ISS3 (Bahia Kino) | Heather
|
95 | Thu 22-Jul-2004 | Daily Report for July 21 | ISS3 (Bahia Kino) | Heather
|
94 | Wed 21-Jul-2004 | Sounding Bahia Kino 22 July 0Z | ISS3 (Bahia Kino) | Heather
|
93 | Wed 21-Jul-2004 | Sounding Bahia Kino 21 July 18z | ISS3 (Bahia Kino) | Jennifer
|
92 | Wed 21-Jul-2004 | Sounding Bahia Kino 21 July 12Z | ISS3 (Bahia Kino) | Jennifer
|
91 | Wed 21-Jul-2004 | Sounding Bahia Kino 21 July, 6z | ISS3 (Bahia Kino) | Brad
|
90 | Wed 21-Jul-2004 | Daily Report for July 20 | ISS3 (Bahia Kino) | Jennifer
|
89 | Tue 20-Jul-2004 | Sounding Bahia Kino 21 July 0z | ISS3 (Bahia Kino) | Jennifer
|
88 | Tue 20-Jul-2004 | Sounding Bahia Kino 20 July 18Z | ISS3 (Bahia Kino) | Heather
|
87 | Tue 20-Jul-2004 | Sounding Bahia Kino 20 July 12Z | ISS3 (Bahia Kino) | Heather
|
86 | Tue 20-Jul-2004 | Sounding Bahia Kino 20 July 06Z | ISS3 (Bahia Kino) | Heather
|
85 | Tue 20-Jul-2004 | Daily Report for July 19 | ISS3 (Bahia Kino) | Jennifer
|
84 | Mon 19-Jul-2004 | Sounding Bahia Kino 20 July 0Z | ISS3 (Bahia Kino) | Jennifer
|
83 | Mon 19-Jul-2004 | Sounding Bahia Kino 19 July 12Z | ISS3 (Bahia Kino) | Heather
|
82 | Mon 19-Jul-2004 | LNA DC voltage measured | ISS3 (Bahia Kino) | Steve/John
|
81 | Mon 19-Jul-2004 | Clary GT1000 UPS running for GAOS | ISS3 (Bahia Kino) | Steve/John
|
80 | Mon 19-Jul-2004 | Daily report for July 18 | ISS3 (Bahia Kino) | Jennifer
|
79 | Sun 18-Jul-2004 | Sounding Bahia Kino 19 July 0Z | ISS3 (Bahia Kino) | Heather
|
78 | Sun 18-Jul-2004 | Roving team report for July 18 | ISS3 (Bahia Kino) | Steve/John
|
77 | Sun 18-Jul-2004 | IRT down during quick check. | ISS3 (Bahia Kino) | Steve/John
|
76 | Sun 18-Jul-2004 | Profiler data backup and down time | ISS3 (Bahia Kino) | Steve/John
|
75 | Sun 18-Jul-2004 | Sounding Bahia Kino 18 July 12Z | ISS3 (Bahia Kino) | Heather
|
74 | Sat 17-Jul-2004 | Daily report for July 17 | ISS3 (Bahia Kino) | Jennifer
|
73 | Sat 17-Jul-2004 | Sounding Bahia Kino 18 July 0z | ISS3 (Bahia Kino) | Jennifer
|
72 | Sat 17-Jul-2004 | Sounding Bahia Kino July 17th, 12z | ISS3 (Bahia Kino) | Brad
|
71 | Sat 17-Jul-2004 | Sounding Bahia Kino 17 July 0Z | ISS3 (Bahia Kino) | Heather
|
70 | Fri 16-Jul-2004 | Daily Report for July 16 | ISS3 (Bahia Kino) | Heather
|
69 | Fri 16-Jul-2004 | Sounding Bahia Kino 16 July 12z | ISS3 (Bahia Kino) | Jennifer
|
68 | Fri 16-Jul-2004 | Daily report July 15 and Power Outage Wrap-up | ISS3 (Bahia Kino) | Brad
|
67 | Fri 16-Jul-2004 | Power Outage! | ISS3 (Bahia Kino) | Brad
|
66 | Thu 15-Jul-2004 | Sounding Bahia Kino 16 July 0Z | ISS3 (Bahia Kino) | Heather
|
65 | Thu 15-Jul-2004 | Sounding Bahia Kino 15 July 12Z | ISS3 (Bahia Kino) | Heather
|
64 | Thu 15-Jul-2004 | Daily report for July 15 | ISS3 (Bahia Kino) | Brad
|
63 | Wed 14-Jul-2004 | Sounding Bahia Kino 15 July 0z | ISS3 (Bahia Kino) | Jennifer
|
62 | Wed 14-Jul-2004 | Sounding Bahia Kino 14 July 18z | ISS3 (Bahia Kino) | Jennifer
|
61 | Wed 14-Jul-2004 | Sounding Bahia Kino 14 July 12z | ISS3 (Bahia Kino) | Heather
|
60 | Wed 14-Jul-2004 | Sounding Bahia Kino 14 July, 06Z | ISS3 (Bahia Kino) | Heather
|
59 | Wed 14-Jul-2004 | Daily report for July 14 | ISS3 (Bahia Kino) | Heather
|
58 | Tue 13-Jul-2004 | Daily report for Power-up 23z 7/13 | ISS3 (Bahia Kino) | Brad
|
57 | Tue 13-Jul-2004 | Sounding Bahia Kino 14 July, 00Z | ISS3 (Bahia Kino) | Heather
|
56 | Tue 13-Jul-2004 | Sounding Bahia Kino 13 July, 18z | ISS3 (Bahia Kino) | Jennifer
|
55 | Tue 13-Jul-2004 | Sounding Bahia Kino 13 July, 12z | ISS3 (Bahia Kino) | Jennifer
|
54 | Tue 13-Jul-2004 | Sounding Bahia Kino 13 July, 6z | ISS3 (Bahia Kino) | Jennifer
|
53 | Tue 13-Jul-2004 | Daily report for July 13 | ISS3 (Bahia Kino) | Heather
|
52 | Mon 12-Jul-2004 | Sounding Bahia Kino 13 July, 00z | ISS3 (Bahia Kino) | Brad
|
51 | Mon 12-Jul-2004 | Measured CLASS pre-amp voltages | ISS3 (Bahia Kino) | Steve/John
|
50 | Mon 12-Jul-2004 | LIST OF BACKUP DISKS | ISS3 (Bahia Kino) | Steve/John
|
49 | Mon 12-Jul-2004 | Roving team notes | ISS3 (Bahia Kino) | Steve/John
|
48 | Mon 12-Jul-2004 | Confirmed PYG wiring; matches Puerto Penasco | ISS3 (Bahia Kino) | Steve/John
|
47 | Mon 12-Jul-2004 | Sounding Bahia Kino 12 July, 18z | ISS3 (Bahia Kino) | Jennifer
|
46 | Mon 12-Jul-2004 | Sounding Bahia Kino 12 July, 12z | ISS3 (Bahia Kino) | Jennifer
|
45 | Mon 12-Jul-2004 | Sounding Bahia Kino 12 July, 6z | ISS3 (Bahia Kino) | Brad
|
44 | Sun 11-Jul-2004 | Daily report for Sunday July 12 | ISS3 (Bahia Kino) | Heather
|
43 | Sun 11-Jul-2004 | Sounding Bahia Kino July 12th, 0z | ISS3 (Bahia Kino) | Heather
|
42 | Sun 11-Jul-2004 | Sounding Bahia Kino July 11th, 12z | ISS3 (Bahia Kino) | Jennifer
|
41 | Sun 11-Jul-2004 | Daily report for Saturday July 11 | ISS3 (Bahia Kino) | Heather
|
40 | Sun 11-Jul-2004 | Daily report for Saturday July 10 | ISS3 (Bahia Kino) | Jennifer
|
39 | Sat 10-Jul-2004 | Sounding Bahia Kino July 11th, 0z | ISS3 (Bahia Kino) | Heather
|
38 | Sat 10-Jul-2004 | Sounding Bahia Kino Saturday July 10, 12z | ISS3 (Bahia Kino) | Brad
|
37 | Sat 10-Jul-2004 | Sounding Bahia Kino Saturday July 10 6z | ISS3 (Bahia Kino) | Jennifer
|
36 | Sat 10-Jul-2004 | Sounding Bahia Kino Template | ISS3 (Bahia Kino) | Jennifer
|
35 | Sat 10-Jul-2004 | Daily report for Friday July 9 | ISS3 (Bahia Kino) | Jennifer
|
34 | Fri 09-Jul-2004 | tklog fixed at Los Mochis | ISS3 (Bahia Kino) | Charlie
|
33 | Fri 09-Jul-2004 | IR Radiation Sensor Tests | ISS3 (Bahia Kino) | Charlie
|
32 | Fri 09-Jul-2004 | Sounding Bahia Kino Friday July 9th 18z | ISS3 (Bahia Kino) | Brad
|
31 | Fri 09-Jul-2004 | Sounding Bahia Kino Friday July 9th 12z | ISS3 (Bahia Kino) | Heather
|
30 | Fri 09-Jul-2004 | Sounding Bahia Kino Friday July 9 6z launch | ISS3 (Bahia Kino) | Brad
|
29 | Thu 08-Jul-2004 | Sounding Bahia Kino for Friday July 9 00Z | ISS3 (Bahia Kino) | Brad
|
28 | Thu 08-Jul-2004 | Daily report for Thursday, July 8 | ISS3 (Bahia Kino) | Brad
|
27 | Thu 08-Jul-2004 | Sounding Bahia Kino for Thursday July 8 18z | ISS3 (Bahia Kino) | Brad
|
26 | Thu 08-Jul-2004 | Sounding Bahia Kino for Thurs. July 08 12z | ISS3 (Bahia Kino) | Jennifer
|
25 | Thu 08-Jul-2004 | Sounding Bahia Kino for Thursday July 8 06Z | ISS3 (Bahia Kino) | Heather
|
24 | Thu 08-Jul-2004 | Daily report for Wed. July 07 | ISS3 (Bahia Kino) | Jennifer
|
23 | Wed 07-Jul-2004 | Sounding Bahia Kino for Wed. July 08 0Z | ISS3 (Bahia Kino) | Heather
|
22 | Wed 07-Jul-2004 | Sounding Bahia Kino for Wed. July 07 18z | ISS3 (Bahia Kino) | Jennifer
|
21 | Wed 07-Jul-2004 | Sounding Bahia Kino for Wed. July 07 12z | ISS3 (Bahia Kino) | Jennifer
|
20 | Tue 06-Jul-2004 | Sounding Launch 00z July 7 | ISS3 (Bahia Kino) | Brad
|
19 | Tue 06-Jul-2004 | Daily report for Tuesday July 6 Power Up | ISS3 (Bahia Kino) | Brad
|
18 | Tue 06-Jul-2004 | Daily report for Tuesday July 6 | ISS3 (Bahia Kino) | Brad
|
17 | Tue 06-Jul-2004 | Sounding Launch 12z July 6 | ISS3 (Bahia Kino) | Heather
|
16 | Mon 05-Jul-2004 | Daily report for Mon. July 5 | ISS3 (Bahia Kino) | Brad
|
14 | Mon 05-Jul-2004 | Profiler settings | ISS3 (Bahia Kino) | Bill
|
13 | Mon 05-Jul-2004 | Daily report for Sun July 4 | ISS3 (Bahia Kino) | Bill
|
12 | Mon 05-Jul-2004 | training session | ISS3 (Bahia Kino) | Operator
|
11 | Sun 04-Jul-2004 | Sounding Bahia Kino Sun July 5 0Z | ISS3 (Bahia Kino) | Jennifer
|
10 | Sun 04-Jul-2004 | training session | ISS3 (Bahia Kino) | Charlie
|
9 | Sun 04-Jul-2004 | Profiler repaired | ISS3 (Bahia Kino) | Bill
|
8 | Sun 04-Jul-2004 | Daily report for Sat July 3 | ISS3 (Bahia Kino) | Bill
|
7 | Sat 03-Jul-2004 | Sounding Launch 3 Jul 2215 | ISS3 (Bahia Kino) | Brad
|
6 | Sat 03-Jul-2004 | Daily report for Fri July 2 | ISS3 (Bahia Kino) | Bill
|
5 | Fri 02-Jul-2004 | fixed ssh port forwarding | ISS3 (Bahia Kino) | Charlie
|
4 | Fri 02-Jul-2004 | Daily report for Thu July 1 | ISS3 (Bahia Kino) | Bill
|
3 | Tue 29-Jun-2004 | Its Alive | ISS3 (Bahia Kino) | Lou
|
2 | Tue 27-Jun-2000 | Sounding Bahia Kino Saturday 10 0z | ISS3 (Bahia Kino) | Jennifer
|
- 209: SOUNDING, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 22:42:58 GMT, Sounding Bahia Kino 16 August 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408412104
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.84
Temp C : 34.29
RH % : 52.5
For Surface Data
Pressure mb : 1009.0
Temp C : 33.9
RH% : 53.6
Wind Spd m/s : 4.7
Wind Dir deg : 231
Pre-Launch Note conditions not observable by automatic systems
Weather Description sunny and clear. convection to north and east. some
cumulus towers to west, light breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb :
Termination Altitude km :
Reason for Termination :
Post-Termination Weather Description:
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 208: DAILY, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 11:35:12 GMT, Daily Report for August 15
All systems normal.
HE tanks:3
sondes: 8
balloons: 10
Profiler disk write: 37.8%
voltage: 133.4 on ct.4
Weather: sunny over our area with large amounts of convection to the east
- 207: SOUNDING, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 11:32:13 GMT, Sounding Bahia Kino 15 August 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408412415
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.21
Temp C : 28.64
RH % : 85.00
For Surface Data
Pressure mb : 1010.9
Temp C : 28.5
RH% : 86.3
Wind Spd m/s : 2.9
Wind Dir deg : 109
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear and calm
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 40.1
Termination Altitude km : 22.052
Reason for Termination : sonde stopped transmitting data
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1011.3
Temp C : 27.048
RH % : 88.727
Wspd m/s : .68373
Wdir deg : 69.038
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 206: DAILY, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 22:46:33 GMT, Daily Report for August 14
All systems normal.
HE tanks:4
sondes: 10
balloons: 14
Profiler disk write:34.4%
voltage: 131.7 on ct.4
Weather: Dark this morning when we left the site, large convective towers have
been building to the North all the way around to the east and also to the west. Breezy and hot today.
- 205: SOUNDING, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 22:45:28 GMT, Sounding Bahia Kino 15 August 00Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 00Z
Sonde coef tape #:408411910
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.28
Temp C : 33.44
RH % : 51.70
For Surface Data
Pressure mb : 1009.6
Temp C : 33.7
RH% : 61.5
Wind Spd m/s : 5.7
Wind Dir deg : 208
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear above, strong convection all around site,hot and breezy.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 47.6
Termination Altitude km : 21.247
Reason for Termination : lost signal
Post-Termination Weather Description: Same as above, convection to the NNE has
gotten deeper, anvil cloud can be seen to the NE.
For Surface Data
Pressure mb : 1008.8
Temp C : 33.281
RH % : 65.465
Wspd m/s : 4.0484
Wdir deg : 231.92
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 204: SOUNDING, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 10:39:28 GMT, Sounding Bahia Kino 14 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408412412
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.18
Temp C : 27.64
RH % : 62.9
For Surface Data
Pressure mb : 1011.3
Temp C : 27.6
RH% : 67.3
Wind Spd m/s : 4.1
Wind Dir deg : 182
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 63.8
Termination Altitude km : 19.254
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1011.4
Temp C : 26.117
RH % : 70.164
Wspd m/s : 2.3742
Wdir deg : 35.47
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 203: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 22:37:04 GMT, Sounding Bahia Kino 14 August 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408412303
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.16
Temp C : 32.79
RH % : 68.04
For Surface Data
Pressure mb : 1009.7
Temp C : 33.5
RH% : 69.1
Wind Spd m/s : 5.6
Wind Dir deg : 211
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies with stratus to the N.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 52.3
Termination Altitude km : 20.664
Reason for Termination : Stopped transmitting data.
Post-Termination Weather Description: Clear skies with stratus to the N and E.
For Surface Data
Pressure mb : 1009
Temp C : 32.343
RH % : 73.848
Wspd m/s : 4.9075
Wdir deg : 208.75
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 202: DAILY, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 16:41:45 GMT, Daily Report for August 13
All systems normal.
HE tanks: 4 3/5
sondes: 12
balloons: 18
Profiler disk write:30.8%
voltage
Weather: Clear and sunny all day.
- 201: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 16:37:43 GMT, Sounding Bahia Kino 13 August 1800Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408411914
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1012.32
Temp C : 34.40
RH % : 53.70
For Surface Data
Pressure mb :1013.6
Temp C : 34.2
RH% : 57.9
Wind Spd m/s : 4.2
Wind Dir deg : 203
Pre-Launch Note conditions not observable by automatic systems
Weather Description hot, sunny and clear in all directions
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 44.9
Termination Altitude km : 21.555
Reason for Termination : lost signal
Post-Termination Weather Description: sunny and clear, scattered cumulus to NE, light breeze
For Surface Data
Pressure mb :1013.2
Temp C : 34.675
RH % : 53.687
Wspd m/s : 6.0884
Wdir deg : 195.72
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 200: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 10:50:02 GMT, Sounding Bahia Kino 13 August 1200Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408403902
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.12
Temp C : 28.81
RH % : 84.3
For Surface Data
Pressure mb :1011.2
Temp C : 28.8
RH% : 85.3
Wind Spd m/s : 1.8
Wind Dir deg : 69
Pre-Launch Note conditions not observable by automatic systems
Weather Description clear sky, humid
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 33.0
Termination Altitude km : 23.415
Reason for Termination : balloon burst
Post-Termination Weather Description: clear skies, humid
For Surface Data
Pressure mb : 1011.7
Temp C : 28.014
RH % : 86.568
Wspd m/s : 2.3416
Wdir deg : 91.337
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 199: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 04:36:25 GMT, Sounding Bahia Kino 13 August 6Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408402504
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.09
Temp C : 30.76
RH % : 79.90
For Surface Data
Pressure mb : 1011.3
Temp C : 30.3
RH% : 78.5
Wind Spd m/s : 4.1
Wind Dir deg : 228
Pre-Launch Note conditions not observable by automatic systems
Weather Description
CLear skies with ligtening to the north and east.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 36.7
Termination Altitude km : 22.765
Reason for Termination : balloon burst
Post-Termination Weather Description: Falling stars and SE winds, no lightening spotted at time of obs.
For Surface Data
Pressure mb : 1011.4
Temp C : 30.563
RH % : 80.716
Wspd m/s : 3.7593
Wdir deg : 226.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 198: DAILY, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 22:41:40 GMT, Daily Report for August 12
All systems normal.
HE tanks: 5 1/5
sondes: 16
balloons:22
Profiler disk write:27.3%
voltage 132.9
Weather: Clear and sunny today with some clouds and lightning in the distance this morning.
- 197: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 22:38:13 GMT, Sounding Bahia Kino 13 August 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408411901
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.2
Temp C : 34.47
RH % : 60.2
For Surface Data
Pressure mb : 1010.1
Temp C : 33
RH% : 65.5
Wind Spd m/s : 4.8
Wind Dir deg : 233
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 33.9
Termination Altitude km : 23.489
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Cirrus to the NE and W.
For Surface Data
Pressure mb : 1009.1
Temp C : 32.875
RH % : 67.508
Wspd m/s : 2.8773
Wdir deg : 212.97
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 196: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 16:39:29 GMT, Sounding Bahia Kino 12 August 1800z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408411913
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.3
Temp C : 33.57
RH % : 74.60
For Surface Data
Pressure mb :1012.5
Temp C : 33.1
RH% : 50.9
Wind Spd m/s : 3.04
Wind Dir deg : 128
Pre-Launch Note conditions not observable by automatic systems
Weather Description sunny and clear stratus clouds to N
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 35.3
Termination Altitude km : 23.084
Reason for Termination : lost signal
Post-Termination Weather Description: sunny and clear with a light breeze
For Surface Data
Pressure mb : 1012.3
Temp C : 33.365
RH % : 61.409
Wspd m/s : 3.2546
Wdir deg : 222.18
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde humidity was higher than sfc humidity by a factor of around 20. we waited for it to stabalize but it did not and we decided to proceed with the launch. on the launch screen, raw met data still had the sonde humidity at around 70 but
the 10-sec data has it showing up at around 50 before we launched.
- 195: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 10:47:07 GMT, Sounding Bahia Kino 12 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408402503
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.87
Temp C : 27.67
RH % : 87.10
For Surface Data
Pressure mb : 1011.3
Temp C : 27.5
RH% : 87.8
Wind Spd m/s : 2.7
Wind Dir deg : 53
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear with lightning to the NNE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 41.3
Termination Altitude km : 21.976
Reason for Termination : Lost signal.
Post-Termination Weather Description: Cumulus in all directions with lightning to the NE.
For Surface Data
Pressure mb : 1013.2
Temp C : 28.233
RH % : 84.414
Wspd m/s : 4.0092
Wdir deg : 76.704
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 194: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 04:43:27 GMT, Sounding Bahia Kino 12 August 0600Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408403903
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb :1009.60
Temp C : 30.58
RH % :75.60
For Surface Data
Pressure mb :1011.1
Temp C : 30.7
RH% : 76.7
Wind Spd m/s :4.7
Wind Dir deg :204
Pre-Launch Note conditions not observable by automatic systems
Weather Description clear night, lightning to north, humid
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 54.2
Termination Altitude km : 20.313
Reason for Termination : stopped recieving data
Post-Termination Weather Description: overcast, humid, light breeze
For Surface Data
Pressure mb : 1011.3
Temp C : 30.131
RH % : 80.043
Wspd m/s : 2.8283
Wdir deg : 164.04
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 193: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 22:39:00 GMT, Sounding Bahia Kino 12 August 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408411904
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.82
Temp C : 32.37
RH % : 79.1
For Surface Data
Pressure mb :1009.3
Temp C : 32.5
RH% : 73.0
Wind Spd m/s : 5.2
Wind Dir deg : 227
Pre-Launch Note conditions not observable by automatic systems
Weather Description sunny and clear with a light breeze, convection to the
north and east.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 41.6
Termination Altitude km : 22.117
Reason for Termination : lost signal
Post-Termination Weather Description: sunny and clear, light breeze, convection
to the north.
For Surface Data
Pressure mb : 1008.5
Temp C : 32.072
RH % : 71.088
Wspd m/s : 3.8344
Wdir deg : 216.89
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 192: DAILY, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 22:38:18 GMT, Daily Report for August 11
All systems normal.
HE tanks: 7 2/5
sondes: 21
balloons:27
Profiler disk write:24.1%
voltage 133.2 on Ct4
Weather: sunny and clear during the day, cloudy at night, convection to the
north and east and a light breeze througout the day/night.
- 190: INFO, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 18:51:16 GMT, Kino Roving team visit
The roving team (Lou and June) visited Kino site on Aug. 10 and Aug. 11. Here is a summary for our visit:
(1) Profiler data backup: We stopped the profiler at 20:05-20:55 UTC on Aug. 10 to back up the profiler data. The data were backed up to two CDs (NAME_KIN04 and NAME_KIN05). We left one copy in the trailer and brought one copy with us. After backup, the disk was ~20% full.
(2) Data backup on DM computer: We backed up raw and NIMA data on DM computer on two DVDs (one for raw and one for NIMA), left one copy in the trailer and brought one copy with us.
- 189: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 16:41:08 GMT, Sounding Bahia Kino 11 August 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408411909
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.7
Temp C : 33.97
RH % : 55.40
For Surface Data
Pressure mb :1012.3
Temp C : 33.3
RH% : 60.7
Wind Spd m/s : 4.2
Wind Dir deg : 214
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Cirrus to the NNE, some convection to the North.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 47.6
Termination Altitude km : 21.174
Reason for Termination : Balloon burst
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1012
Temp C : 33.334
RH % : 66.651
Wspd m/s : 5.6344
Wdir deg : 219.7
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 188: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 10:41:55 GMT, Sounding Bahia Kino 11 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408403900
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.14
Temp C : 27.56
RH % : 100
For Surface Data
Pressure mb : 1010.5
Temp C : 27.5
RH% : 90
Wind Spd m/s : 2.1
Wind Dir deg : 51
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 38.4
Termination Altitude km : 22.431
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Mostly clear with some alto cumulus to the NNE.
For Surface Data
Pressure mb : 1010.9
Temp C : 27.42
RH % : 91.758
Wspd m/s : 1.3322
Wdir deg : 105.17
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 187: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 04:39:37 GMT, Sounding Bahia Kino 11 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408402502
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.63
Temp C : 30.29
RH % : 73.40
For Surface Data
Pressure mb :1011.6
Temp C : 30.5
RH% : 73.3
Wind Spd m/s : 3.1
Wind Dir deg : 180
Pre-Launch Note conditions not observable by automatic systems
Weather Description cloudy with a light breeze and humid.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 39.5
Termination Altitude km : 22.302
Reason for Termination : balloon burst
Post-Termination Weather Description: humid, cloudy with a light breeze
For Surface Data
Pressure mb : 1011.2
Temp C : 29.834
RH % : 80.573
Wspd m/s : 2.7875
Wdir deg : 152.62
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 186: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 22:42:21 GMT, Sounding Bahia Kino 11 August 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408411900
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.39
Temp C : 32.61
RH % : 71.30
For Surface Data
Pressure mb : 1010.8
Temp C : 32.8
RH% : 71.8
Wind Spd m/s : 5.5
Wind Dir deg : 204
Pre-Launch Note conditions not observable by automatic systems
Weather Description Layer of stratus to the E with convection to the N.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 56.7
Termination Altitude km : 20.161
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Overcast with cumulus in all directions.
For Surface Data
Pressure mb : 1010.1
Temp C : 31.531
RH % : 75.988
Wspd m/s : 4.95
Wdir deg : 182.39
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 185: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 16:43:49 GMT, Sounding Bahia Kino 10 August 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408403905
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.10
Temp C : 32.9
RH % : 51.8
For Surface Data
Pressure mb : 1013.7
Temp C : 32.3
RH% : 59.3
Wind Spd m/s : 2.3
Wind Dir deg : 142
Pre-Launch Note conditions not observable by automatic systems
Weather Description Alto cumulus in all directions.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 34.7
Termination Altitude km : 23.157
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Mostly clear.
For Surface Data
Pressure mb : 1013.1
Temp C : 33.376
RH % : 61.309
Wspd m/s : 5.4547
Wdir deg : 219.37
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 184: DAILY, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 10:46:14 GMT, Daily Report for August 10
All systems normal.
HE tanks:7
sondes:25
balloons:31
Profiler disk write:21.3%
voltage 134.0on Ct4
Weather: convection to the N and NE with occasional low cumulus clouds and humid
- 183: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 10:45:01 GMT, Sounding Bahia Kino 10 August 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408403901
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.67
Temp C : 28.08
RH % : 75.90
For Surface Data
Pressure mb :1011.7
Temp C : 28.2
RH% : 75.8
Wind Spd m/s : 6.5
Wind Dir deg : 136
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Overcast, breezy, lightening to the ESE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 73.4
Termination Altitude km : 18.455
Reason for Termination : balloon burst
Post-Termination Weather Description:overcast, winds light.
For Surface Data
Pressure mb : 1011.3
Temp C : 27.226
RH % : 80.656
Wspd m/s : 2.2321
Wdir deg : 99.6
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 182: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 04:50:53 GMT, Sounding Bahia Kino 10 August 0600Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408412113
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.94
Temp C : 31.05
RH % : 80.80
For Surface Data
Pressure mb : 1011.2
Temp C : 30.9
RH% : 80.6
Wind Spd m/s : 2.2
Wind Dir deg : 92.0
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear, lightening to the north .
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 57.2
Termination Altitude km : 20.021
Reason for Termination : sonde stopped transmitting data
Post-Termination Weather Description:
very dark, possibly overcast
For Surface Data
Pressure mb : 1012.2
Temp C : 30.865
RH % : 75.228
Wspd m/s : 1.734
Wdir deg : 120.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 181: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 22:43:32 GMT, Sounding Bahia Kino 10 August 00Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 00Z
Sonde coef tape #: 408400705
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.16
Temp C : 33.82
RH % : 70.8
For Surface Data
Pressure mb : 1008.9
Temp C : 33.4
RH% : 71.6
Wind Spd m/s : 7.4
Wind Dir deg : 230
Pre-Launch Note conditions not observable by automatic systems
Weather Description mostly sunny with convection occuring to the N and NE,
breezy with sudden gusts at times.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 46.1
Termination Altitude km : 21.482
Reason for Termination : lost signal
Post-Termination Weather Description: partly cloudy, convection to N and NE has
increased, cumulus clouds elsewhere
For Surface Data
Pressure mb : 1009.4
Temp C : 32.858
RH % : 74.104
Wspd m/s : 6.1391
Wdir deg : 213.49
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 180: DAILY, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 16:55:06 GMT, Daily Report for August 9
All systems normal.
HE tanks:7 3/5
sondes:28
balloons:34
Profiler disk write:65.1%
voltage 134.4 on Ct4
Weather: mostly sunny skies with convection occuring througout the day to the
north, winds have picked up slightly, humid most of the day
- 179: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 16:53:54 GMT, Sounding Bahia Kino 9 August 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408400706
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.49
Temp C : 34.46
RH % : 52.70
For Surface Data
Pressure mb : 1013.3
Temp C : 34.7
RH% : 53.4
Wind Spd m/s : 1.7
Wind Dir deg : 146
Pre-Launch Note conditions not observable by automatic systems
Weather Description: Cirrus to the SSE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 53.2
Termination Altitude km : 20.498
Reason for Termination : sonde stopped transmitting data
Post-Termination Weather Description: Cumulus on the horizon to the ESE, cirrus to the south.
For Surface Data
Pressure mb : 1012.5
Temp C : 35.288
RH % : 54.169
Wspd m/s : 4.9386
Wdir deg : 220
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 178: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 10:46:37 GMT, Sounding Bahia Kino 9 August 1200z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400600
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.98
Temp C : 29.31
RH % : 91.5
For Surface Data
Pressure mb :1009.8
Temp C : 29.9
RH% : 79.2
Wind Spd m/s : 1.5
Wind Dir deg : 136
Pre-Launch Note conditions not observable by automatic systems
Weather Description mostly clear, some alto stratus in patches, light
breeze, humid.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 73.9
Termination Altitude km : 18.426
Reason for Termination : lost signal
Post-Termination Weather Description: mostly clear with high stratus clouds to the east, alto stratus to the north with a few cumulus clouds to the north as
well, humid.
For Surface Data
Pressure mb : 1011
Temp C : 29.689
RH % : 83.663
Wspd m/s : 2.9083
Wdir deg :132.88
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde relative humidity off again, waited for it to stabalize but did not. we still proceeded with the next launch screen and the ten second data did show relative humidity at around high 70's even though the raw data still had it around low 90's.
- 177: DAILY, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 23:02:52 GMT, Daily Report for August 8
All systems normal.
HE tanks:8 4/5
sondes:31
balloons:37
Profiler disk write:61.6%
voltage 133.7 on Ct4
Weather:
lightning at night to the north east, today was clear and sunny with large
amounts of convection firing up to the north
- 176: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 22:45:06 GMT, Sounding Bahia Kino 9 August 0000z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408400602
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 106.35
Temp C : 32.89
RH % : 89.30
For Surface Data
Pressure mb :1008.7
Temp C : 33.8
RH% : 64.2
Wind Spd m/s : 6.1
Wind Dir deg : 225
Pre-Launch Note conditions not observable by automatic systems
Weather Description sunny and clear everywhere except to the north: large
amount of convection to the north
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 60.8
Termination Altitude km : 19.727
Reason for Termination : lost signal
Post-Termination Weather Description: sunny and clear, convection to north has
decreased, light breeze
For Surface Data
Pressure mb : 1007.5
Temp C : 32.766
RH % : 71.939
Wspd m/s : 5.4204
Wdir deg :228.61
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde initial humidity data was off by more than 20 compared to surface data. we waited a while to see if it would stabalize but it did not. the rest of the
data was good so we launched the balloon.
recieved weak signal througout flight and only could be tracked with omni
antenna
- 175: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 10:51:44 GMT, Sounding Bahia Kino 8 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400715
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.62
Temp C : 28.12
RH % : 81.80
For Surface Data
Pressure mb : 1009.2
Temp C : 28.0
RH% : 85.4
Wind Spd m/s : 1.5
Wind Dir deg : 52
Pre-Launch Note conditions not observable by automatic systems
Weather Description Dark with some clouds over head.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 46.8
Termination Altitude km : 21.199
Reason for Termination : Lost signal.
Post-Termination Weather Description: Mostly clear with alto cumulus to the NE.
For Surface Data
Pressure mb : 1010
Temp C : 27.145
RH % : 86.501
Wspd m/s : .80297
Wdir deg : 65.423
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 174: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 04:42:41 GMT, Sounding Bahia Kino 8 August 0600Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408400709
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.46
Temp C : 31.51
RH % : 75.9
For Surface Data
Pressure mb :1008.4
Temp C :31.5
RH% :75.9
Wind Spd m/s :4.1
Wind Dir deg : 225
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear overhead but cumulus towers and lightning to NE, light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 48.1
Termination Altitude km : 21.048
Reason for Termination : stopped transmitting data
Post-Termination Weather Description: humid, mostly cloudy, light breeze
For Surface Data
Pressure mb : 1009.4
Temp C : 30.871
RH % : 74.811
Wspd m/s : 4.607
Wdir deg : 202.54
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 173: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 22:50:31 GMT, Sounding Bahia Kino 8 August 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408400601
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1004.91
Temp C : 33.21
RH % : 59.2
For Surface Data
Pressure mb : 1007.1
Temp C :33.4
RH% : 61.4
Wind Spd m/s :6.5
Wind Dir deg : 223
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny, clear, light breeze with some convection to the north
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 48.6
Termination Altitude km : 21.121
Reason for Termination : sonde stopped transmitting data
Post-Termination Weather Description: Large cumulus towers building to the north,clear in all directions.
For Surface Data
Pressure mb : 1006.7
Temp C : 32.867
RH % : 65.397
Wspd m/s : 3.9978
Wdir deg : 216.88
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 172: DAILY, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 16:52:14 GMT, Daily Report for August 7
All systems normal.
HE tanks:8 1/5
sondes:34
balloons:39
Profiler disk write:58.1%
voltage 132.2 on Ct4
Weather:
Clouds from this morning have cleared overhead,large convective tower building to the north
- 171: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 16:46:40 GMT, Sounding Bahia Kino 7 August 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408401415
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.93
Temp C : 32.65
RH % : 57.10
For Surface Data
Pressure mb : 1011.3
Temp C : 32.3
RH% : 61.4
Wind Spd m/s : 1.8
Wind Dir deg : 148
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear and calm.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 27.7
Termination Altitude km : 24.6
Reason for Termination : lost signal
Post-Termination Weather Description: Cumulus towers building on the horizon to the WSW, a small batch of cirrus to the south, clear otherwise, winds have
picked up.
For Surface Data
Pressure mb : 1010.4
Temp C : 322.754
RH % : 66.219
Wspd m/s : 4.4698
Wdir deg : 236.94
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 170: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 10:48:02 GMT, Sounding Bahia Kino 7 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401200
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.32
Temp C : 28.06
RH % : 87.6
For Surface Data
Pressure mb : 1010.5
Temp C : 28.0
RH% : 87.4
Wind Spd m/s : 2.7
Wind Dir deg : 92
Pre-Launch Note conditions not observable by automatic systems
Weather Description Dark, with cirrus clouds to the NE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 57.4
Termination Altitude km : 19.931
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Alto cumulus to the NE and NW.
For Surface Data
Pressure mb : 1010.6
Temp C : 27.498
RH % : 86.823
Wspd m/s : 1.6278
Wdir deg : 65.954
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 169: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 04:42:50 GMT, Sounding Bahia Kino 7 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408401312
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.64
Temp C : 29.66
RH % : 83.10
For Surface Data
Pressure mb :1011.2
Temp C : 29.5
RH% : 80.3
Wind Spd m/s : 3.8
Wind Dir deg : 221
Pre-Launch Note conditions not observable by automatic systems
Weather Description
some clouds, hard to see in the dark, light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb :45.0
Termination Altitude km :21.478
Reason for Termination : balloon burst
Post-Termination Weather Description: same as above
For Surface Data
Pressure mb : 1011.0
Temp C : 29.243
RH % : 82.316
Wspd m/s : 3.6417
Wdir deg : 184.21
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 168: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 22:37:29 GMT, Sounding Bahia Kino 7 August 0000z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401308
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.55
Temp C : 31.72
RH % : 64.10
For Surface Data
Pressure mb :1010.8
Temp C : 31.6
RH% : 66.2
Wind Spd m/s : 4.9
Wind Dir deg : 218
Pre-Launch Note conditions not observable by automatic systems
Weather Description thin blanket of stratocumulus clouds over most of sky,
light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 50.1
Termination Altitude km :19.984
Reason for Termination : Stopped transmitting data.
Post-Termination Weather Description:convection firing up to the north, thin
stratus layer to west, light breeze
For Surface Data
Pressure mb : 1009.7
Temp C : 30.284
RH % : 74.389
Wspd m/s : 5.0023
Wdir deg : 220.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 167: DAILY, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 16:55:42 GMT, Daily Report for August 6
All systems normal.
Power outage this morning. Clary is up and running again with the sounding computer hooked up to it.
HE tanks:8
sondes:38
balloons:43
Profiler disk write: 53.6%
Weather: Thunderstorm this morning at 12z launch. Overcast and cloudy today with a slight breeze.
- 166: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 16:44:05 GMT, Sounding Bahia Kino 6 August 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408401303
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.49
Temp C : 30.27
RH % : 60.60
For Surface Data
Pressure mb : 1013.1
Temp C : 29.9
RH% : 63.1
Wind Spd m/s : 2.4
Wind Dir deg : 75
Pre-Launch Note conditions not observable by automatic systems
Weather Description Cumulus towers all around with a slight breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 31.2
Termination Altitude km : 23.857
Reason for Termination : Stopped transmitting data.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1013.1
Temp C : 32.659
RH % : 54.987
Wspd m/s : 1.9234
Wdir deg : 128.68
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 165: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 11:06:25 GMT, Power Outage at 12z launch!
Short power outage this morning at 12z launch from storm. We had to restart the sounding system and bypass the clary as it started beeping at the very start of launch before we let the balloon go. We aborted the sonding, restarted the system without the clary and everything seems fine.
- 164: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 10:49:00 GMT, Sounding Bahia Kino 6 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408414206
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1012.69
Temp C : 27.29
RH % : 84.7
For Surface Data
Pressure mb : 1013.7
Temp C : 26.7
RH% : 92.3
Wind Spd m/s : 10.3
Wind Dir deg : 141
Pre-Launch Note conditions not observable by automatic systems
Weather Description Warmer than usual this morning with more humidity, rain and strong gusty winds with lightning in the distance from all directions.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 83
Termination Altitude km : 17.708
Reason for Termination : Lost signal.
Post-Termination Weather Description: Storm now over with alto cumulus clouds in all directions.
For Surface Data
Pressure mb : 1011.8
Temp C : 28.967
RH % : 73.192
Wspd m/s : 3.0194
Wdir deg : 116.3
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 163: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 04:53:28 GMT, Sounding Bahia Kino 6 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0600z
Sonde coef tape #: 408401510
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.75
Temp C : 30.13
RH % : 79.5
For Surface Data
Pressure mb : 1010.8
Temp C : 30.0
RH% : 80.9
Wind Spd m/s : 3.4
Wind Dir deg : 222
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear skies with a light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 51.5
Termination Altitude km : 20.638
Reason for Termination : stopped transmitting data
Post-Termination Weather Description: light breeze and scattered cumulus clouds
For Surface Data
Pressure mb : 1010.8
Temp C : 29.882
RH % : 79.322
Wspd m/s : 3.0161
Wdir deg : 235.73
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 162: DAILY, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 00:44:31 GMT, Daily Report for August 5
All systems normal.
we powered down after 12z launch this morning because the site power supply would be turned off for one hour from 7am to 8am. Before the 18z launch, we started the systems up again and everything worked fine.
the roving crew was here today for a couple of hours and will be back early next week.
HE tanks:9 2/5
sondes:42
balloons:47
Profiler disk write: 51.3%
Voltage:134.5
Weather: today has been mostly sunny with a variety of scattered clouds
througout the day but no significant weather
- 161: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 22:48:16 GMT, Sounding Bahia Kino 6 August 0000z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401506
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.1
Temp C : 33.08
RH % : 61.6
For Surface Data
Pressure mb : 1010.1
Temp C : 33.2
RH% : 62.2
Wind Spd m/s : 4.8
Wind Dir deg : 221
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny with some convection to the north
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 71.4
Termination Altitude km : 18.726
Reason for Termination : stopped transmitting data
Post-Termination Weather Description: sunny, thin layer of stratus to north, some convection to west
For Surface Data
Pressure mb : 1009.6
Temp C : 32.251
RH % : 69.193
Wspd m/s : 3.7348
Wdir deg : 229.63
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 160: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 16:51:52 GMT, Power Outage!
Power outage this morning from 6:00 am to 9:30 am. All system shut down before outage and all started up successfully.
- 159: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 16:48:17 GMT, Sounding Bahia Kino 5 August 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408414202
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.72
Temp C : 33.16
RH % : 54.10
For Surface Data
Pressure mb : 1012.8
Temp C : 32.5
RH% : 65.1
Wind Spd m/s : 3.5
Wind Dir deg : 120
Pre-Launch Note conditions not observable by automatic systems
Weather Description Alto cumulus to the N and stratus to E.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 32.7
Termination Altitude km : 23.526
Reason for Termination : balloon burst
Post-Termination Weather Description: sunny with scattered cumulus clouds
For Surface Data
Pressure mb : 1012.5
Temp C : 35.739
RH % : 46.331
Wspd m/s : 4.754
Wdir deg : 196.14
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 158: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 10:44:48 GMT, Sounding Bahia Kino 5 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400713
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.10
Temp C : 29.07
RH % : 79.40
For Surface Data
Pressure mb : 1010.4
Temp C : 29.0
RH% : 79.0
Wind Spd m/s : 2.9
Wind Dir deg : 152
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 73.3
Termination Altitude km : 18.466
Reason for Termination : Stopped receiving data.
Post-Termination Weather Description: Strato cumulus clouds to the NE and NW.
For Surface Data
Pressure mb : 1011.4
Temp C : 27.911
RH % : 87.456
Wspd m/s : 2.2338
Wdir deg : 57.179
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 157: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:55:12 GMT, Sounding Bahia Kino 5 August 0000Z RE-LAUNCH
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0000Z
Sonde coef tape #:408401515
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.94
Temp C : 31.48
RH % : 72.80
For Surface Data
Pressure mb :1009.0
Temp C : 31.4
RH% : 74.3
Wind Spd m/s : 4.7
Wind Dir deg : 206
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny with thin layers of stratocumulus clouds over some parts of the sky.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 92.2
Termination Altitude km : 17.197
Reason for Termination : sonde stopped transmitting data
Weather:mostly cloudy skies with a blanket of stratocumulus clouds over most of area, light breeze
For Surface Data
Pressure mb : 1009.0
Temp C : 30.407
RH % : 77.58
Wspd m/s : 4.5302
Wdir deg : 208.64
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Cycled the MotoSat laptop, Motosat, and powerstrip. Turned all off, waited a couple of minutes, powered up, phone and internet back up.
Balloon burst prematurely for the first sone,#408401411, at approx. 543.9mb. Launched second sonde at approx. 0030Z.
- 156: DAILY, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:17:46 GMT, Daily Report for August 4
All systems normal.
Cycled Motostat, working fine now.
Launched second sonde at 0030Z because first one burst at 543.9mb,
see 00Z relaunch log.
ramon came by and told us they are going to turn off the power tomorrow from 7am to 8am. we will shut down the equipment and turn it back on around 8:15am
HE tanks:9 4/5
sondes:45
balloons:50
Profiler disk write: 48.6%
Voltage:134.8
Weather: this morning we saw clouds at all levels this can be shown by the
skew-t chart. they were stratus clouds at higher levels and cumulus and stratocumulus clouds at lower levels. mostly sunny the rest of today with thin layers ofstratocumulus randomly scattered when we first launched to thicker stratocumulusclouds moving in from the south by 0z.
sorry puerto penasco, but we have better seafood drive down and come visit
- 155: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:00:16 GMT, Sounding Bahia Kino 5 August 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0000Z
Sonde coef tape #:408401411
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.50
Temp C : 32.10
RH % : 71.50
For Surface Data
Pressure mb :1009.4
Temp C : 32.4
RH% : 70.7
Wind Spd m/s : 5.4
Wind Dir deg : 215
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny with thin layers of stratocumulus clouds over some parts of the sky.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : balloon burst at 543mb
Termination Altitude km :
Reason for Termination :
Weather:
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Cycled the MotoSat laptop, Motosat, and powerstrip. Turned all off, waited a couple of minutes, powered up, phone and internet back up.
balloon burst at around 543.9mb will relaunch a new sonde.
- 154: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 10:55:15 GMT, Sounding Bahia Kino 4 August 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408401502
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.30
Temp C : 26.85
RH % : 71.70
For Surface Data
Pressure mb :1008.8
Temp C : 26.8
RH% : 72.6
Wind Spd m/s : 0.5
Wind Dir deg : 20
Pre-Launch Note conditions not observable by automatic systems
Weather Description
overcast, cool, calm winds
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 64.4
Termination Altitude km : 19.246
Reason for Termination : lost signal
Post-Termination Weather Description: Low level cumulus layer from the SE to the SW w/ a cumulostratus/stratus layer above in all directions, cool, a little more wind than at launch time.
For Surface Data
Pressure mb : 1009.7
Temp C : 27.241
RH % : 78.603
Wspd m/s : 1.7944
Wdir deg : 87.356
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 153: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 04:41:54 GMT, Sounding Bahia Kino 4 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408401503
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.57
Temp C : 30.93
RH % : 62.30
For Surface Data
Pressure mb : 1009.7
Temp C : 31.0
RH% : 60.1
Wind Spd m/s : 4.3
Wind Dir deg : 203
Pre-Launch Note conditions not observable by automatic systems
Weather Description Lightning off to the NNE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 97.9
Termination Altitude km : 16.787
Reason for Termination : Lost signal.
Post-Termination Weather Description: Clouds moving in, temperatures cooling off
For Surface Data
Pressure mb : 1009.9
Temp C : 30.661
RH % : 57.798
Wspd m/s : 2.6764
Wdir deg : 182.71
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
First sonde we launched was bad, #408401511, no wind data up to termination pressure of 617 mb except for between 1009.6mb to 937.1 mb. The signal was good and the satellites were between 5-8 the whole flight. Launched another sonde, it also had missing wind data at the lower levels but improves with height. -Heather
- 152: DAILY, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 23:55:42 GMT, Daily Report for August 2
All systems normal. Clary UPS malfunction this morning. We bypassed the Clary and plugged sounding system directly into tan box as per Lou's previous directionsEverything is running fine now.
12Z sonde had some problems tracking satellites this morning. Satellite service would come in and out with anywhere from 0 to 8 satellite coverage. The first sonde that we used at the 0Z launch had bad met data (Press:1211, Temp:114, RH:22)so we used another sonde for the launch.Sonde #408414100
HE tanks:11 1/5
sondes:53
balloons:58
Profiler disk write: 41.2%
Weather: Clear skies today with a slight breeze.
- 151: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 22:53:18 GMT, Sounding Bahia Kino 4 August 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401407
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.98
Temp C : 33.60
RH % : 45.5
For Surface Data
Pressure mb : 1007.6
Temp C : 33.2
RH% : 47.8
Wind Spd m/s : 5.1
Wind Dir deg : 243
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Cirrus to the south, cumulus towers to the NNE, clear overhead, temperature backup from last night's low of approximately 22-23 degrees C, nice while it lasted.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 67.8
Termination Altitude km : 19.071
Reason for Termination : lost signal
Post-Termination Weather Description: Scattered cirrus to the SSW and above, cumulus towers, slightly larger than at launch time, to the NNE.
For Surface Data
Pressure mb : 1007.1
Temp C : 33.016
RH % : 54.517
Wspd m/s : 4.282
Wdir deg : 235.78
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Restarted data manager at the beginning of launch because Cambell data not showing up, also paused Profiler briefly to do restart.
Clary seems to functioning fine.
- 150: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 16:44:59 GMT, Sounding Bahia Kino 3 August 1800z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408401402
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.28
Temp C : 33.46
RH % : 41.9
For Surface Data
Pressure mb : 1010.8
Temp C : 33.2
RH% : 39.7
Wind Spd m/s : 2.3
Wind Dir deg : 75
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 34.1
Termination Altitude km : 23.266
Reason for Termination : Stopped receiving data.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1010.2
Temp C : 35.296
RH % : 39.191
Wspd m/s : 3.1207
Wdir deg : 218.24
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Clary back up for this launch, seems to be fine. -H
- 149: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 10:49:23 GMT, Sounding Bahia Kino 3 August 1200z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401507
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.08
Temp C : 24.19
RH % : 911
For Surface Data
Pressure mb :1009.1
Temp C : 23.9
RH% : 91.5
Wind Spd m/s : 1
Wind Dir deg : 11
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 39.3
Termination Altitude km : 22.297
Reason for Termination : balloon burst
Post-Termination Weather Description: mare's tail clouds to the east, clear above, temp. cool and very pleasant.
For Surface Data
Pressure mb : 1009.5
Temp C : 21.738
RH % : 85.752
Wspd m/s : 2.8953
Wdir deg : 23.67
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 148: DAILY, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 22:43:55 GMT, Daily Report for August 3
All systems normal. Clary back in system running fine.Suspect another brief power outage because Clary and data manager-Cambell display were both acting up, allis well now.Restarted data manager and paused profiler to get Cambell going again at the 0Z August 4 sounding.
4 sondes today
HE tanks:9 3/5
sondes:48
balloons:53
Profiler disk write: 44.7%
Voltage: 133.4 on Circuit #4
Weather: Cool this morning, in mid 20's, heating up to average temps., mid 30's,mostly clear skies with a few cirrus to the south and small cumulus towers building on the horizon to the NNE.
First 6Z sonde (408401511) launched only received wind data between 1009.6 to
937.1. Satellite coverage between 5 to 8 and signal in the 70's. Terminated at
617mb and launched a new one.Second sonde also had marginal wind data at the lower levels.
- 147: SOUNDING, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 22:42:35 GMT, Sounding Bahia Kino 3 August 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401514
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.41
Temp C : 32.18
RH % : 67.10
For Surface Data
Pressure mb :1010.1
Temp C : 32.6
RH% : 57.6
Wind Spd m/s : 5.5
Wind Dir deg : 207
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies with a slight breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 124.7
Termination Altitude km : 15.419
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1009.4
Temp C : 31.996
RH % : 59.444
Wspd m/s : 4.1284
Wdir deg : 204.19
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 146: SOUNDING, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 10:55:02 GMT, Sounding Bahia Kino 2 August 1200Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408414211
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.29
Temp C : 27.71
RH % : 86.10
For Surface Data
Pressure mb :1010.7
Temp C : 27.7
RH% : 88.4
Wind Spd m/s : 5.0
Wind Dir deg : 129
Pre-Launch Note conditions not observable by automatic systems
Weather Description
mostly clear skies with a line of cumulus clouds to the south
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 33.9
Termination Altitude km : 23.219
Reason for Termination : lost signal
Post-Termination Weather Description: line of cumulus clouds from south has
moved in over area, also layer of stratocumulus clouds to the north and northeast
For Surface Data
Pressure mb : 1011.6
Temp C : 26.47
RH % : 84.681
Wspd m/s : 2.6225
Wdir deg : 93.432
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde did not track satellites for parts of the launch so some wind data is
missing but most of it was received.
- 144: DAILY, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 22:55:25 GMT, Daily Report for August 1
All systems normal.
3 sondes today
HE tanks: 11 2/5
sondes: 56
balloons:60
Profiler disk write: 37.7%
Voltage: 135.5 on circuit #4
Weather: Overcast layer has remained from this morning although thinner and w/fewer signs of convection, strong southerly breeze.
Ending IOP#5 w/0Z August 2 launch
2 sondes reporting unrealistic data at 6Z and 12Z on August 1, launched sondes were fine.
- 143: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 22:46:51 GMT, Sounding Bahia Kino 2 August 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408413204
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.40
Temp C : 32.89
RH % : 54.30
For Surface Data
Pressure mb : 1009.6
Temp C : 33.0
RH% : 58.5
Wind Spd m/s : 5.9
Wind Dir deg : 161
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Overcast layer of stratus, stratocumulus, strong southerly breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 38.4
Termination Altitude km : 22.642
Reason for Termination : lost siganl
Post-Termination Weather Description: Overcast layer thicker than at lunch time,more statocumulus than stratus.
For Surface Data
Pressure mb : 1009.4
Temp C : 30.996
RH % : 71.472
Wspd m/s : 4.6348
Wdir deg : 189.03
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Bad sonde #408414100, launched different sonde, worked fine.
- 142: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 16:58:36 GMT, Sounding Bahia Kino 1 August 1800Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Kino Bay
launch time UTC: 1800z
Sonde coef tape #: 408412408
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.7
Temp C : 32.72
RH % : 62.60
For Surface Data
Pressure mb : 1010.8
Temp C : 32.8
RH% : 65.8
Wind Spd m/s : 4.3
Wind Dir deg : 170
Pre-Launch Note conditions not observable by automatic systems
Weather Description
mostly cloudy with cumulus clouds in all directions
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 42.7
Termination Altitude km : 21.875
Reason for Termination : lost signal
Post-Termination Weather Description: mostly cloudy: cumulus clouds to the north,stratus deck to the east, convection to the west, breezy
For Surface Data
Pressure mb : 1011.4
Temp C : 32.16
RH % : 63.676
Wspd m/s : 6.2599
Wdir deg : 160.65
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 141: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 10:56:03 GMT, Sounding Bahia Kino 1 August 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408413415
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.28
Temp C : 27.57
RH % : 86.90
For Surface Data
Pressure mb : 1008.90
Temp C : 27.6
RH% : 86.9
Wind Spd m/s : 2.4
Wind Dir deg : 78
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Few high stratus, stratocumulus obscuring the full moon.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 46.3
Termination Altitude km : 21.286
Reason for Termination : lost signal
Post-Termination Weather Description: layer of stratocum.in all directions, calm
For Surface Data
Pressure mb : 1008.9
Temp C : 27.664
RH % : 87.893
Wspd m/s : 1.9185
Wdir deg : 102.42
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Again, the first sonde, 408414103, transmitted bad data, 1076mb,8.6C, 90%RH, so we switched to a new sonde, it worked fine.
- 140: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 04:37:50 GMT, Sounding Bahia Kino 1 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408413502
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.45
Temp C : 30.02
RH % : 77.7
For Surface Data
Pressure mb : 1007.9
Temp C : 30.2
RH% : 77.5
Wind Spd m/s : 4.2
Wind Dir deg : 198
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies with some alto stratus.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 43.8
Termination Altitude km : 21.674
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Clear skies.
For Surface Data
Pressure mb : 1008.7
Temp C : 29.598
RH % : 78.205
Wspd m/s : 3.3559
Wdir deg : 152.67
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
The first sonde, 408414104, was transmitting unrealistic data, 1077mb, -26.52 C,95% RH, so we opened another sonde and it functioned as expected. -Heather
- 139: DAILY, Site ISS3 (Bahia Kino), Sat 31-Jul-2004 22:45:00 GMT, Daily Report for July 31
All systems normal.
HE tanks: 12.25
sondes: 62
balloons:64
Profiler disk write: 34.3%
Voltage:131.9 on Circuit 4
Weather: Clouds and fog from this morning have cleared up. Few cirrus to the
south, stratocumulus to the NNE, scattered cirrus to the west, clear above.
Starting IOP#5 w/0Z August 1 launch
- 138: SOUNDING, Site ISS3 (Bahia Kino), Sat 31-Jul-2004 22:38:54 GMT, Sounding Bahia Kino 1 August 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408413411
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1004.99
Temp C : 33.19
RH % : 61.40
For Surface Data
Pressure mb : 1006.5
Temp C : 32.6
RH% : 67.6
Wind Spd m/s : 5.6
Wind Dir deg : 236
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Stratocumulus to the NNE, few cirrus to the south, cirrus to the west, clear above.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 42.6
Termination Altitude km : 21.951
Reason for Termination : balloon burst
Post-Termination Weather Description: Cleared up since launch time, cirrus to the west, and NNE.
For Surface Data
Pressure mb : 1005.7
Temp C : 32.302
RH % : 65.646
Wspd m/s : 5.2538
Wdir deg : 233.41
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 137: SOUNDING, Site ISS3 (Bahia Kino), Sat 31-Jul-2004 10:44:36 GMT, Sounding Bahia Kino 31 July 1200z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408413506
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.14
Temp C : 26.36
RH % : 68.7
For Surface Data
Pressure mb : 1008.01
Temp C : 27.5
RH% : 67.2
Wind Spd m/s : 1.2
Wind Dir deg : 58
Pre-Launch Note conditions not observable by automatic systems
Weather Description Mostly clear skies with some strato cumulus to the NNE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 40.2
Termination Altitude km : 22.132
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Same as before.
For Surface Data
Pressure mb : 1008.5
Temp C : 25.108
RH % : 72.871
Wspd m/s : 1.0904
Wdir deg : 51.909
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 136: DAILY, Site ISS3 (Bahia Kino), Fri 30-Jul-2004 22:56:00 GMT, Daily Report for July 30
All systems normal.
HE tanks: 12.5
sondes: 64
balloons:66
Profiler disk write: 30.8%
Weather: Clear skies today with a slight breeze.
- 135: SOUNDING, Site ISS3 (Bahia Kino), Fri 30-Jul-2004 22:40:53 GMT, Sounding Bahia Kino 31 July 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408413813
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.78
Temp C : 32.57
RH % : 65.6
For Surface Data
Pressure mb : 1006.5
Temp C : 33.1
RH% : 64.9
Wind Spd m/s : 5.2
Wind Dir deg : 218
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies with a slight breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 38.2
Termination Altitude km : 22.622
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above with some cumulus towers to the NE.
For Surface Data
Pressure mb : 1005.3
Temp C : 32.707
RH % : 61.322
Wspd m/s : 5.5674
Wdir deg : 232.04
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 134: SOUNDING, Site ISS3 (Bahia Kino), Fri 30-Jul-2004 10:40:49 GMT, Sounding Bahia Kino 30 July 1200Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 1200z
Sonde coef tape #:408413505
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.17
Temp C : 26.44
RH % : 90.40
For Surface Data
Pressure mb :1008.1
Temp C : 26.5
RH% : 92.6
Wind Spd m/s : 1.9
Wind Dir deg : 73
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear calm humid morning
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 29.1
Termination Altitude km : 24.145
Reason for Termination : lost signal
Weather post launch: mostly clear and humid
For Surface Data
Pressure mb : 1008.6
Temp C : 25.164
RH % : 94.226
Wspd m/s : 2.3791
Wdir deg : 38.97
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 133: SOUNDING, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 22:36:57 GMT, Sounding Bahia Kino 30 July 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0000z
Sonde coef tape #:408412405
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.33
Temp C : 31.98
RH % : 69.9
For Surface Data
Pressure mb :1008.6
Temp C : 32.6
RH% : 70.3
Wind Spd m/s : 5.5
Wind Dir deg : 231
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny and humid with convection to the east
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 118.3
Termination Altitude km : 15.682
Reason for Termination : lost signal suddenly
Weather post launch: sunny, humid, convection to east has decreased
For Surface Data
Pressure mb : 1007.9
Temp C : 31.789
RH % : 73.027
Wspd m/s : 5.3796
Wdir deg : 227.72
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 132: INFO, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 20:51:48 GMT, Roving team COMMENTS ON LOS MOCHIS
Some good some bad:
- Brad reported that the Motosat was set to "Do Not Disturb" which is why we
could not call in from the other sites.
- Brad also found the Fluke digital multimeter which the roving crew was
falsely accused of removing.
!!!!!!!!!!!!!!!!!!!!
- Two 408 sondes launched at 04 and 08 Z on July 29 didn't look good. There
are not data from ~700-180 mb for 08Z and from ~250-130 mb for 04 Z. But it
was not documented in the tklog file. The students need to pay attention!
!!!!!!!!!!!!!!!!!!!!
- At least some of the Los Mochis crew have been trained on entering
coefficients by hand from the paper tape.
- 131: INFO, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 20:36:44 GMT, Roving team notes for July 29
Today is the last day of roving duty for Steve and John. Lou and June are
here in Kino now and the plebian order of the cell phone will be bestowed
upon them in a ceremony at dinner.
IOP#4 will finish this evening.
Tasks today:
- We did another data backup to DVD of the ISS-3 workstation.
- Showed the new roving team everything we could think of
- CLARY UPS:
Things are looking up at Los Mochis. Brad reported that the Motosat was set to
"Do Not Disturb" which is why we could not call in from the other sites. Brad
also found the Fluke digital multimeter which the roving crew was falsely
accused of removing.
At least one or two of the 408 sondes has launched fine.
At least some of the Los Mochis crew have been trained on entering coefficients
by hand from the paper tape.
GLASS SYSTEM POWER
The GLASS system has been put back on the CLARY GT1000 ups which isw on 3 extension cords .
The operators have been told that if there are any problems to remove plug strip
and to put the strip into the protection box.This is because of high voltage.
The fix sent to us by CLARY is for different model. The 1000's input voltage
is not adjustable.
to be continued....
- 130: DAILY, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 17:59:08 GMT, Daily Report for July 29
All systems normal.
ISS crew visiting- Steve,John, Lou, and June.
HE tanks: 12.75
sondes: 66
balloons:68
Profiler disk write: 27.5%
Voltage: 132.7
clary ups functioning again with 3 extension cords
Weather: Lightening this morning at early launch (12Z) to the NNE, the (18Z) launch had a broken layer of cumulus above and in all directions from the site. The humidity is up, so far less wind than yesterday.
- 129: SOUNDING, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 16:59:05 GMT, Sounding Bahia Kino 29 July 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #:408413501
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.81
Temp C : 33.69
RH % : 56.79
For Surface Data
Pressure mb : 10.12.7
Temp C : 32.5
RH% : 66.2
Wind Spd m/s : 5.1
Wind Dir deg : 149
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Broken layer of cumulus around and overhead, cloudy humid day.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 61.7
Termination Altitude km : 19.530
Reason for Termination : lost signal
Weather post launch:Cleared up overhead during launch, cumulus on the horizon during the launch in all directions except the SE.
For Surface Data
Pressure mb : 1012.3
Temp C : 33.835
RH % : 60.541
Wspd m/s : 5.2767
Wdir deg : 189.35
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 128: SOUNDING, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 10:51:41 GMT, Sounding Bahia Kino 29 July 1200Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 1200Z
Sonde coef tape #: 408413412
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb :1008.97
Temp C :27.4
RH % : 89.6
For Surface Data
Pressure mb : 1010.3
Temp C : 27.5
RH% : 90.9
Wind Spd m/s : 1.2
Wind Dir deg : 103
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear calm morning
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 53.1
Termination Altitude km : 20.410
Reason for Termination : data stopped coming in
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1011.1
Temp C : 26.473
RH % : 93.079
Wspd m/s : 1.5086
Wdir deg : 15.585
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 127: SOUNDING, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 04:47:21 GMT, Sounding Bahia Kino 29 July 06Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408413800
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.39
Temp C : 29.57
RH % : 80.80
For Surface Data
Pressure mb : 1010.9
Temp C : 29.9
RH% : 80.2
Wind Spd m/s : 2.5
Wind Dir deg : 168
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear, lightening to the NNE
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 39.6
Termination Altitude km : 22.274
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1011.1
Temp C : 29.479
RH % : 79.397
Wspd m/s : 2.4314
Wdir deg : 161.1
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 126: DAILY, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 22:50:53 GMT, Daily Report for July 28
All systems normal.
HE tanks: 13.75
sondes: 70
balloons:72
Profiler disk write: 23.9%
Voltage: 134.5
Weather: Breezy with mostly clear skies today.
- 125: SOUNDING, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 22:44:44 GMT, Sounding Bahia Kino 29 July 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408413504
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.58
Temp C : 32.38
RH % : 68.3
For Surface Data
Pressure mb : 1009.6
Temp C : 32.6
RH% : 67.2
Wind Spd m/s : 6.9
Wind Dir deg : 192
Pre-Launch Note conditions not observable by automatic systems
Weather Description Breezy with cumulus towers to the NE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 58.9
Termination Altitude km : 19.910
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1009
Temp C : 31.845
RH % : 74.091
Wspd m/s : 5.2113
Wdir deg : 189.92
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 124: SOUNDING, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 16:55:09 GMT, Sounding Bahia Kino 28 July 1800Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 1800z
Sonde coef tape #: 408413809
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.74
Temp C : 33.74
RH % : 59.00
For Surface Data
Pressure mb :1013.3
Temp C : 32.6
RH% : 64.8
Wind Spd m/s : 7.7
Wind Dir deg : 154
Pre-Launch Note conditions not observable by automatic systems
Weather Description
cumulus clouds in all directions, windy with some gusts
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 43.6
Termination Altitude km : 21.722
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb :1012.5
Temp C :33.751
RH % :61.781
Wspd m/s :7.6189
Wdir deg :181.73
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 123: SOUNDING, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 10:47:52 GMT, Sounding Bahia Kino 28 July 1200Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 1200z
Sonde coef tape #: 408414012
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.67
Temp C : 28.23
RH % : 86.10
For Surface Data
Pressure mb :1010.2
Temp C : 28.3
RH% : 85.6
Wind Spd m/s : 3.6
Wind Dir deg : 104
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear night, breezy at times
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 47.3
Termination Altitude km : 21.103
Reason for Termination : lost signal
Post-Termination Weather Description: mostly clear morning with stratus to NE
For Surface Data
Pressure mb : 1010.7
Temp C :29.851
RH % : 56.997
Wspd m/s :3.9618
Wdir deg : 174.21
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 122: SOUNDING, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 04:45:28 GMT, Sounding Bahia Kino 28 July 0600Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0600z
Sonde coef tape #: 408413207
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.19
Temp C : 30.78
RH % : 71.9
For Surface Data
Pressure mb :1009.9
Temp C : 31.0
RH% : 72.6
Wind Spd m/s : 5.2
Wind Dir deg : 182
Pre-Launch Note conditions not observable by automatic systems
Weather Description
mostly clear, ligtning and cumulus clouds towards NE, breezy with sudden gusts
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 69.0
Termination Altitude km : 18.838
Reason for Termination : lost signal
Post-Termination Weather Description: same as above
For Surface Data
Pressure mb : 1010.1
Temp C : 31.07
RH % : 64.302
Wspd m/s : 3.8998
Wdir deg : 184.05
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 121: SOUNDING, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 22:28:41 GMT, Sounding Bahia Kino 28 July 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408413215
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.51
Temp C : 33.64
RH % : 60.4
For Surface Data
Pressure mb : 1008.4
Temp C : 33.1
RH% : 63.5
Wind Spd m/s : 7.2
Wind Dir deg : 213
Pre-Launch Note conditions not observable by automatic systems
Weather Description Locally clear. Beautiful CB's to N and E.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 150
Termination Altitude km : 14387
Reason for Termination : Lost signal
Post-Termination Weather Description: Same as above. 2/3 Waxing moon.
For Surface Data
Pressure mb : 1007.8
Temp C : 32.3
RH % : 66.9
Wspd m/s : 5.3
Wdir deg : 213
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Winds lost at 200mB.
We did hear and interfering signal. It appeared that the receiver jumped
to another freq. at 103.5 at the end. Beginning freq. was 102.5. The
direction of travel was towards the SE so it's possible that we switched
to the Hermosillo sonde. Aspen data did look fine.
- 120: INFO, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 20:36:46 GMT, Roving team notes from LORETO visit
The LORETO Glass station does not use TKLOG so we are entering a short summary
from here at ISS-3/Kino.
Roving team (Steve and John) flew Hermosillo to Loreto last Friday (July 23).
The Glass site is at the Hotel Pinta which is booked for the season.
Hotel Posada de Loreto was fine. Basic, clean, 395 pesos. It is in the
center of town and a 10-minute walk from the Pinta.
A car is not needed except for transportation to/from the airport. Katie
gave us a ride, but a taxi would have worked.
Flight info:
Aeromexico has one flight/day same each day:
HMO to LOR: Flight AM2290 departs at 4:35pm
LOR to HMO: Flight AM2291 departs at 9:10am
Price was about 3700 pesos round trip (depends on day of week)
LORETO ISSUES:
MOTOSAT:
The Motosat was not working when we arrived. It had failed following a quick
manual shutdown during a strong windstorm. After many restarts by the crew over
many days it got to the configuration screen. Per conversation with Tim we used
the point4020 software on another PC (Steve's laptop on the LAN) to set the
satellite lat/lon. It has worked ok since. A continuing issue is that there are
no other PC's on that LAN which can successfully run point4020.
REGULATOR:
The high-pressure gauge on the Loreto regulator was inoperative, and the hose
may leak. We brought the spare regulator from Puerto Penasco. The low pressure
hose was moved from the Loreto regulator. This regulator will now screwed on
the tanks without the hose. Appears to work well, and without leaking. We also
played with the balloon size. In Kino the students measured a balloon
circumference with 34 cf. The students at Loreto cut a rope to this length.
When filled with 400 lbs helium, the curcumference matched that in Kino
closely.
GLASS PC:
The Glass PC failed after the 12Z sounding on July 25. It appeared to be
a hard drive failure. The students told us that the setup crew had much
trouble with this PC. With reckless abandon JWM opened the laptop and noted
the HDD was loose in its tray. Further there were no screws holding
the HDD in the tray and only 1 screw holding the tray to the case.
A cardboard shim was fashoned
to reduce play of the HDD in its bracket. THe HDD was reinstalled with
a satisfying connection to the motherboard. The PC has been better behaived
since. We ran scandisk which found many "errors". Some were related to old
software (versions of the GLASS software and others). After consultation with
Tim, and over two days, we removed considerable software from this PC. We then
began to defragment the disk. This process had to be interupted several times
to launch sondes. The crew will continue to defrag between launches until
it is done. Apologies to the crew in Boulder for calling an emergency and then
fixing the problem. Ned was willing to scramble an F-18 to get us a replacement
PC.
A second problem with this PC was noted: The case fan is not working.
We are now using four Glass pylons to lift the Glass pc above the desk,
providing the possibility of ventilation below. We have also bought a fan for
the room to circulate air past the PC.
Lou is bringing a replacement pc for GLASS and should install it soon. We would
have tried running GLASS on another laptop but apparently the software can
only be run under Windows-98.
SURFACE TOWER:
The same storm that caused the Motosat to be stowed blew down the GLASS
surface met tower. The students righted the tower and replaced it in the same
position. We tied the station to two nearby trees (in addition to the stakes
already in the sand at the tower base). It turns out that this tower had not
been working since setup. There was no communication between the GLASS pc and
the campbell. JWM worked on that and eventually made contact. But the values
coming back were clearly not calibrated. Possibly we were using the wrong DLD
file? Because we were concerned with data quality/accuracy and did not think
a continuous data stream would benefit the PI we did not pursue this further.
Data quality issues:
- the anemometer propellor broke when the station was blown over
- the pressure sensor has no static port, so P is affected by wind around the
Campbell box.
- the T/RH sensors are aspirated but the fan is weak.
- numerous trees and large buildings were clearly affecting the local flows
at the tower height.
- the anemometer orientation was off >=8 degrees and the reported direction
was even further off indicating that the potentiometer may be rotated in the
collar, or the 'BD or ZN' boom direction/zero north are incorrect.
GLASS expects to use the surface tower for a ground point (P,T,H,WSpd,Wdir),
not for regular time series data. Since this was not available they are simply
copying the sonde values for surface data, estimating the wind speed, and
using the anemometer vane to estimate direction. (Note that we measured the
tower black box direction to be about 8 degrees clockwise of true south).
GENERAL:
Be aware that there is NO test equipment, few tools, and no manuals at this
site.
OTHER COMMENTS:
-- We noticed that GLASS does not aspirate the rawinsonde T/RH sensor prior to
launch. The ISS group has found this to be necessary, especially if the sensor
arm is in direct sunlight.
-- The GLASS receiving antenna is poorly positioned at this site. Its view of
the sky is blocked to the west to more than 45 degrees above the horizon by
the hotel building. This is because the coax between the GLASS rack and GLASS
amplifier, and between the amplifier and the antenna are fairly short. We saw
flights where the balloon went west and we lost signal around 300 mb because
the sonde signal was blocked by the building. We've recommended the next Roving
team bring a replacement/longer cable. Lou reported that a longer coax had to
be used for the GPS ground antenna in this installation.
- 119: INFO, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 20:30:46 GMT, Roving team notes
We (Steve and John) are back in Kino.
IOP#4 is due to begin this afternoon.
Did a profiler backup of days 200-208 onto CD NAME_KIN03.
The profiler was down from 1921-2022Z.
Did a data backup DVD of the ISS-3 workstation. Will bring back to Boulder.
CLARY UPS:
Hotel: we are trying the
- 118: RADAR, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 20:26:27 GMT, Profiler performance
The wind profiler continues to operate well in the monsoon environment.
This morning I note a possible problem:
There is a weak second image in the Y+ beam spectral contour plots; even
weaker in the Y- beam. May indicate that the beam pattern is degrading
but not enough to affect the wind measurement. We should check the
switches carefully when back in Boulder.
- 117: RADAR, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 20:23:51 GMT, Profiler data backup and down time (NAME_KIN03)
Profiler backup today
Backed up the PROFILER SPC files.
VOLUME: NAME_KIN03
Days 04200-04208 (July 18-26)
Profiler down from 19:21 through 20:22 for this process.
Can read (dir) disk on GLASS-pc; ok.
Also note SPC files are present on ISS3 workstation.
Deleted backed up files.
Made two CD copies. Will take one with us. Other stays at ISS3
Now free disk space is about 1.56 GB. Disk use is about 73 MB/day.
Disk write at 20.0%.
Should be enough free space to finish the project but backups are still
needed for redundancy.
NOTE: The CD-writer would not format a disk. I rebooted the profiler PC and
then it was normal. Suspect the power failure/recovery caused some confusion
with the writer.
- 116: SOUNDING, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 10:45:41 GMT, Sounding Bahia Kino 27 July 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408412410
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.75
Temp C : 26.52
RH % : 88.0
For Surface Data
Pressure mb :1009.8
Temp C : 26.2
RH% : 89.7
Wind Spd m/s : 2.3
Wind Dir deg : 52
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear starry morning, humid
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb :51.5
Termination Altitude km : 20.591
Reason for Termination : lost signal
Post-Termination Weather Description: layer of stratus clouds to the north, couple of random strat. cumul. clouds elsewhere.
For Surface Data
Pressure mb : 1010.2
Temp C : 26.095
RH % : 87.236
Wspd m/s : 1.9038
Wdir deg : 82.478
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good launch
- 115: DAILY, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 00:31:02 GMT, Daily Report for July 26
All systems normal.
HE tanks: 14.5
sondes: 76
balloons:78
Profiler disk write: 48.3%
Voltage: 136.7
Weather: Sunny, clear skies today after morning thunderstorms subsided.
- 114: SOUNDING, Site ISS3 (Bahia Kino), Mon 26-Jul-2004 22:44:03 GMT, Sounding Bahia Kino 27 July 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408413213
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.1
Temp C : 33.06
RH % : 60.6
For Surface Data
Pressure mb : 1009.2
Temp C : 32.9
RH% : 61.6
Wind Spd m/s : 5.4
Wind Dir deg : 236
Pre-Launch Note conditions not observable by automatic systems
Weather Description Cumulus towers in all directions with cirrus to the E, SW and above.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 71.1
Termination Altitude km : 18.744
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1008.5
Temp C : 32.2
RH % : 58.845
Wspd m/s : 5.0464
Wdir deg : 221.53
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 113: SOUNDING, Site ISS3 (Bahia Kino), Mon 26-Jul-2004 11:28:48 GMT, Sounding Bahia Kino 26 July 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408413211
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.94
Temp C : 23.86
RH % : 91.7
For Surface Data
Pressure mb : 1011.4
Temp C : 23.8
RH% : 95.4
Wind Spd m/s : 3.8
Wind Dir deg : 38
Pre-Launch Note conditions not observable by automatic systems
Weather Description Light rain.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 42.2
Termination Altitude km : 21.852
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Strato cumulus in all directions 5/8 sky coverage.
For Surface Data
Pressure mb : 1012
Temp C : 24.177
RH % : 91.961
Wspd m/s : 3.1991
Wdir deg : 13.278
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Late launch due to problem with the sounding computer and receiver when we arrived this morning.
- 112: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Mon 26-Jul-2004 11:24:48 GMT, Power Outage!
Power outages last night throughout Kino. When we got in this morning the Clary was beeping. We turned it off and then the receiver and sounding system would not turn back on. We called Lou and he advised us to remove the Clary from the system and plug the sounding system and receiver directly into the beige box with red light. Sounding system started up successfully.
Voltage: 138.4
- 111: DAILY, Site ISS3 (Bahia Kino), Sun 25-Jul-2004 23:46:41 GMT, Daily Report for July 25
All systems normal.
HE tanks: 14.75
sondes: 78
balloons:79
Profiler disk write: 44.8%
Weather: Sunny, clear skies all day today with convection firing up to the west.
- 110: SOUNDING, Site ISS3 (Bahia Kino), Sun 25-Jul-2004 22:38:28 GMT, Sounding Bahia Kino 26 July 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408413212
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.65
Temp C : 32.30
RH % : 66.10
For Surface Data
Pressure mb :1010.4
Temp C : 32.0
RH% : 67.3
Wind Spd m/s : 6.7
Wind Dir deg : 219
Pre-Launch Note conditions not observable by automatic systems
Weather Description Sunny, calm with convection firing up to the west.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 304.3
Termination Altitude km : 9.65
Reason for Termination : Lost signal.
Post-Termination Weather Description: Sunny and breezy. Convection has moved to the north.
For Surface Data
Pressure mb : 1010
Temp C : 31.21
RH % : 70.682
Wspd m/s : 4.3473
Wdir deg : 243.53
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
The accent rate of the balloon was very slow between 1-2 m/s. Called roving crew to get advice about launching a new balloon, but were not able to get a hold of them or Lou and we thought it was to late to launch another one.
- 109: SOUNDING, Site ISS3 (Bahia Kino), Sun 25-Jul-2004 10:40:09 GMT, Sounding Bahia Kino 25 July 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408412400
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.64
Temp C : 23.33
RH % : 71.50
For Surface Data
Pressure mb :1012.7
Temp C : 25.1
RH% : 82.9
Wind Spd m/s :3.3
Wind Dir deg :31
Pre-Launch Note conditions not observable by automatic systems
Weather Description
mostly clear skies with light winds
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 50.9
Termination Altitude km : 20.666
Reason for Termination : popped
Post-Termination Weather Description:
partly cloudy, calm
For Surface Data
Pressure mb : 1012.7
Temp C : 24.628
RH % : 89.301
Wspd m/s : 3.1582
Wdir deg : 22.601
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 108: DAILY, Site ISS3 (Bahia Kino), Sat 24-Jul-2004 22:55:22 GMT, Daily Report for July 24
All systems normal.
HE tanks: 15
sondes: 80
balloons:81
Profiler disk write: 41.3%
Voltage: 134.5
Weather: Thunderstorms and light rain at the morning launch, rained harder
around 7am, tapering off midmorning. Sunny this afternoon with a line of cumuluson the horizon from the NW to the NE. High cirrus to the SW.
- 107: SOUNDING, Site ISS3 (Bahia Kino), Sat 24-Jul-2004 22:37:04 GMT, Sounding Bahia Kino 25 July 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408412403
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb :1009.26
Temp C : 31.62
RH % : 65.50
For Surface Data
Pressure mb :1010.5
Temp C : 31.9
RH% : 64.5
Wind Spd m/s : 5.2
Wind Dir deg : 228
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Cirrus to the southwest, Cumulus towers along the horizon from the NW to the NE,Clear above.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 32.2
Termination Altitude km : 23.707
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1009.9
Temp C : 31.165
RH % : 66.728
Wspd m/s : 4.5547
Wdir deg : 228.6
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 106: SOUNDING, Site ISS3 (Bahia Kino), Sat 24-Jul-2004 10:50:37 GMT, Sounding Bahia Kino 24 July 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408413804
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.55
Temp C : 27.81
RH % : 75.40
For Surface Data
Pressure mb : 1010.4
Temp C : 28.3
RH% : 80.2
Wind Spd m/s : 5.0
Wind Dir deg : 60
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Lightening flashes above, can hear thunder.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 83.2
Termination Altitude km : 17.673
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Overcast with thunder and lightning.
For Surface Data
Pressure mb : 1012.1
Temp C : 25.8
RH % : 82.51
Wspd m/s : 9.1052
Wdir deg : 55.694
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 105: DAILY, Site ISS3 (Bahia Kino), Fri 23-Jul-2004 23:04:29 GMT, Daily Report for July 23
All systems normal except for satellite link up- going through the cycling process right now. We had a brief, approx. one minute, power outage earlier today around 12:30pm. It was so brief that nothing lost power, but now the sat link is acting up. Turned sat system off for one minute, didn't work. Now trying for a longer period of time, probably an hour to see if that will fix the problem.This doesn't seem to be a result of any of the DICTUS folks, just a local power outage
Called Roving Crew and informed them of outage.Powered down for an hour, restarted, it worked.
HE tanks: 15
sondes: 82
balloons:83
Profiler disk write: 37.8%
Voltage: 134.4
Weather: The overcast stratocumulus layer from this mornig has cleared to cirrusoverhead. The local terrain, or mountains (~900 to 1000 ft.) to our west have a few cumulus clouds hanging overhead.
- 104: SOUNDING, Site ISS3 (Bahia Kino), Fri 23-Jul-2004 22:44:12 GMT, Sounding Bahia Kino 24 July 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408412401
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.2
Temp C : 31.15
RH % : 67.7
For Surface Data
Pressure mb : 1007.7
Temp C : 32.1
RH% : 67.8
Wind Spd m/s : 5.6
Wind Dir deg : 188
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Cirrus above, cumulus on the horizon N and East, Cumulus over local terrain to the west.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 41.5
Termination Altitude km : 22.101
Reason for Termination : lost signal
Post-Termination Weather Description: same as above
For Surface Data
Pressure mb : 1007.4
Temp C : 30.929
RH % : 68.345
Wspd m/s : 7.0537
Wdir deg : 175.63
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 103: SOUNDING, Site ISS3 (Bahia Kino), Fri 23-Jul-2004 10:42:56 GMT, Sounding Bahia Kino 23 July 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408413200
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.36
Temp C : 26.97
RH % : 72.8
For Surface Data
Pressure mb : 1008.0
Temp C : 27.1
RH% : 70.9
Wind Spd m/s : 2.5
Wind Dir deg : 78
Pre-Launch Note conditions not observable by automatic systems
Weather Description Light rain at the time of launch. Lightning in the distance to the SE, closer than usual.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 74.4
Termination Altitude km : 18.351
Reason for Termination : Balloon burst.
Post-Termination Weather Description: No longer raining. Overcast stratocumulus.
For Surface Data
Pressure mb : 1009.3
Temp C : 26.047
RH % : 76.436
Wspd m/s : 3.6923
Wdir deg : 84.009
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 102: DAILY, Site ISS3 (Bahia Kino), Fri 23-Jul-2004 00:35:55 GMT, Daily Report for July 22
All systems normal. Profiler is now working fine.
HE tanks: 15 1/2
Will update balloon and sonde inventory tomorrow as we have some boxes back at the house.
Mostly cloudy 6/8 oktas. Has been overcast for most of the day and the seas have been up.
Profiler disk write: 34.6%
Voltage: 134.4
- 101: SOUNDING, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 22:51:24 GMT, Sounding Bahia Kino 23 July, 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401305
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.59
Temp C : 32.58
RH % : 62.3
For Surface Data
Pressure mb : 1008.2
Temp C : 33.1
RH% : 60.8
Wind Spd m/s : 5.3
Wind Dir deg : 176
Pre-Launch Note conditions not observable by automatic systems
Weather Description 7 to 8 oktas coverage for most of the day. Right now, 6 oktas. Waves up to 10 ft today which has only happened one other time.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb :
Termination Altitude km :
Reason for Termination :
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 100: RADAR, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 18:39:33 GMT, Profiler failure
The profiler here at Kino stopped working around the time of the rawinsonde
launch at 17Z. The symptom was no Tx power. Receiver sample comb looked fine,
but also the Rx noise level may have been weak.
Powering down the RX/TX and Interface boxes and restarting the PC solved it.
Also, checked all cables and they looked fine. Not sure of the cause.
- 99: INFO, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 18:34:47 GMT, Roving team notes: Thursday July 22
Steve and John are stopping by to drop our luggage before a flight to Loreto
this afternoon.
The profiler failed sometime around 17:30. It appeared the TX was not
transmitting. RX sample comb was ok. Solved by powering down RX/TX and
interface boxes, rebooting PC. Checked cable connections. Then it worked.
Good news since our flight leaves in a couple of hours.
All else looks great here.
- 98: SOUNDING, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 16:44:49 GMT, Sounding Bahia Kino 22 July 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408401400
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.73
Temp C : 31.93
RH % : 61.10
For Surface Data
Pressure mb : 1011.5
Temp C : 31.9
RH% : 60.5
Wind Spd m/s : 6
Wind Dir deg : 165
Pre-Launch Note conditions not observable by automatic systems
Weather Description
ALtostratus to the SSW, altocumulus to the NNW
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 37.6
Termination Altitude km : 22.7
Reason for Termination : balloon burst
Post-Termination Weather Description:
same as above
For Surface Data
Pressure mb : 1010.5
Temp C : 32.976
RH % : 58.351
Wspd m/s : 7.4229
Wdir deg : 179.56
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Profiler transmitter wasn't sending data for about forty-five minutes just afterthe balloon launched.
- 97: SOUNDING, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 10:42:18 GMT, Sounding Bahia Kino 22 July 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408401508
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.59
Temp C : 29.77
RH % : 84.50
For Surface Data
Pressure mb : 1008.7
Temp C : 29.7
RH% : 82.1
Wind Spd m/s : 5.3
Wind Dir deg : 121
Pre-Launch Note conditions not observable by automatic systems
Weather Description
scattered clouds overhead
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 41.0
Termination Altitude km : 21.997
Reason for Termination : balloon burst
Post-Termination Weather Description: Low level stratocumulus, mostly to the SSW,hazy to the west
For Surface Data
Pressure mb : 1010
Temp C : 29.549
RH % : 75.751
Wspd m/s : 7.0913
Wdir deg : 119.69
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 96: SOUNDING, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 04:52:18 GMT, Sounding Bahia Kino 22 July 6Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 06Z
Sonde coef tape #: 408401301
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.51
Temp C : 30.33
RH % : 77.9
For Surface Data
Pressure mb : 1008.7
Temp C : 30.2
RH% : 78.6
Wind Spd m/s : 3.3
Wind Dir deg :174
Pre-Launch Note conditions not observable by automatic systems
Weather Description
few scattered clouds above
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 35.1
Termination Altitude km : 23.1
Reason for Termination : balloon burst
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1008.5
Temp C : 29.82
RH % : 75.03
Wspd m/s : 3.3983
Wdir deg : 177.28
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 95: DAILY, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 04:49:00 GMT, Daily Report for July 21
All systems normal.
Paused profiler while restarting data manager to get surface met to work before 0Z launch today- few minutes data missing.
Partly cludy this morning clearing to a few cirrus to the south, convective towers on the horizon to the north. A few scattered clouds overhead at time of 06Z launch.
Sonde vs surface station pressure: we've been waiting 5 to 10 minutes to see if the sonde pressure would ever stabilize to be same as the surface met station and have not found it to do so. The sounde almost always seems to be one millibar lower than the met station at the launch time regardless of the wait time.
Profiler disk write: 31.7%
Voltage: 133.5
- 94: SOUNDING, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 22:37:00 GMT, Sounding Bahia Kino 22 July 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401300
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.96
Temp C : 32.44
RH % : 68.40
For Surface Data
Pressure mb : 1007.9
Temp C : 32.5
RH% : 69.7
Wind Spd m/s : 5.7
Wind Dir deg : 202
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Cumulus towers to the north, few high cirrus to the south
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 31.4
Termination Altitude km : 23.9
Reason for Termination : boom
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1006.9
Temp C : 32.1
RH % : 69.0
Wspd m/s : 4.47
Wdir deg : 194.7
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Restarted data manager before launch to get surface data to start coming in, also paused profiler momentarily during this process.
- 93: SOUNDING, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 17:47:00 GMT, Sounding Bahia Kino 21 July 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408401404
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.14
Temp C : 32.87
RH % : 69.8
For Surface Data
Pressure mb : 1010.8
Temp C : 33.2
RH% : 62
Wind Spd m/s : 5.8
Wind Dir deg : 200
Pre-Launch Note conditions not observable by automatic systems
Scattered Cirrus.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 33.9
Termination Altitude km : 23.3
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1010.4
Temp C : 33.984
RH % : 55.291
Wspd m/s : 5.587
Wdir deg : 208.54
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Random stop by police on the way in this morning caused our launch to be delayed.
- 92: SOUNDING, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 10:46:51 GMT, Sounding Bahia Kino 21 July 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408401310
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb :1009.52
Temp C : 29.37
RH % :71.80
For Surface Data
Pressure mb : 1010.9
Temp C : 29.5
RH% : 72.6
Wind Spd m/5.6s : 5.6
Wind Dir deg : 153
Pre-Launch Note conditions not observable by automatic systems
Weather Description
lightening to the NNE
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 50.4
Termination Altitude km : 20.705
Reason for Termination : Balloon Burst
Post-Termination Weather Description: Overcast with stratocumulus.Sky coverage 6/8. Hazey to the SSW.
For Surface Data
Pressure mb : 1010.5
Temp C : 28.916
RH % : 75.965
Wspd m/s : 3.7299
Wdir deg : 156.71
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 91: SOUNDING, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 04:41:04 GMT, Sounding Bahia Kino 21 July, 6z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408401413
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.97
Temp C : 31.85
RH % : 66.1
For Surface Data
Pressure mb : 1010.8
Temp C : 31.8
RH% : 68.3
Wind Spd m/s : 6.6
Wind Dir deg : 158
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear but windy.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 82.9
Termination Altitude km : 17.8
Reason for Termination : Balloon burst
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1010.3
Temp C : 31.467
RH % : 55.4
Wspd m/s : 3.0962
Wdir deg : 166.7
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 90: DAILY, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 00:25:26 GMT, Daily Report for July 20
All systems normal.
Convective towers to the north on the horizon.
Profiler disk write: 27.6%
Voltage: 135.4
- 89: SOUNDING, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 22:40:49 GMT, Sounding Bahia Kino 21 July 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401309
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.34
Temp C : 32.92
RH % : 66.50
For Surface Data
Pressure mb : 1007.1
Temp C : 33.6
RH% : 68.4
Wind Spd m/s : 5.7
Wind Dir deg : 215
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear as can be.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 76.8
Termination Altitude km : 18.3
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1006.7
Temp C : 33.222
RH % : 69.5
Wspd m/s : 5.7275
Wdir deg : 204.17
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 88: SOUNDING, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 16:49:50 GMT, Sounding Bahia Kino 20 July 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC:18Z
Sonde coef tape #: 408401304
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.54
Temp C : 34.84
RH % : 54.20
For Surface Data
Pressure mb : 1010.6
Temp C : 34.3
RH% : 55.1
Wind Spd m/s : 3.1
Wind Dir deg : 222
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 30.5
Termination Altitude km : 24
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1009.8
Temp C : 34.13
RH % : 69.25
Wspd m/s : 5.64
Wdir deg : 214
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 87: SOUNDING, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 10:52:34 GMT, Sounding Bahia Kino 20 July 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bhia Kino
launch time UTC: 12Z
Sonde coef tape #: 408401105
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.47
Temp C : 29.24
RH % : 84.2
For Surface Data
Pressure mb : 1008.7
Temp C : 29.3
RH% : 85.4
Wind Spd m/s : 2.5
Wind Dir deg : 100
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 44
Termination Altitude km : 21.4
Reason for Termination : Signal Faded
Post-Termination Weather Description: Lightly scattered cirrus.
For Surface Data
Pressure mb : 1009.6
Temp C : 27.7
RH % : 86.4
Wspd m/s : 3.44
Wdir deg : 66.4
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 86: SOUNDING, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 04:43:25 GMT, Sounding Bahia Kino 20 July 06Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 06Z
Sonde coef tape #: 408401109
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.45
Temp C : 30.63
RH % : 84.10
For Surface Data
Pressure mb : 1009.6
Temp C : 30.5
RH% : 84.4
Wind Spd m/s : 3.1
Wind Dir deg : 239
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear w/ light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 36.5
Termination Altitude km : 22.811
Reason for Termination : balloon burst
Post-Termination Weather Description: Same as above
For Surface Data
Pressure mb : 1009.5
Temp C : 30.049
RH % : 85.579
Wspd m/s : 1.9022
Wdir deg : 200.2
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Cambell not displaying data before launch or after. Restart of the data manager seemed to resolve this problem- space in data from approximately 6 to 7 UTC according to display.
- 85: DAILY, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 00:44:20 GMT, Daily Report for July 19
Skies are clear with the usual evidence of convection to the North, although it appears unorganized at this time.
Computers,satellite, profiler, RASS and surface tower functioning as expected.
We launched 2 sondes for the 0Z sounding as the first one had a weak signal and no wind data coming in.
Campbell not recording at time of 6z launch. Restarted Data Management computer and all seems to be working fine.Space in display data from approximately 6 to 7 UTC
Profiler disk write: 24.2%
Voltage: 135.6
- 84: SOUNDING, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 22:46:30 GMT, Sounding Bahia Kino 20 July 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 402401504
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.02
Temp C : 32.82
RH % : 69.30
For Surface Data
Pressure mb : 1008.8
Temp C : 33
RH% : 67.2
Wind Spd m/s : 5.8
Wind Dir deg : 207
Pre-Launch Note conditions not observable by automatic systems
Weather Description
scattered cirrus to the south and overhead, cumulus on the horizon to the north.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 44.4
Termination Altitude km : 21.683
Reason for Termination : lost signal
Post-Termination Weather Description: Clear with convection to the north.
For Surface Data
Pressure mb : 1008
Temp C : 32.151
RH % : 70.125
Wspd m/s : 5.8663
Wdir deg : 215.95
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
First sonde (serial #:408401412) was terminated because we were not receiving wind data and the signal was weak.
- 83: SOUNDING, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 10:48:43 GMT, Sounding Bahia Kino 19 July 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408401408
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.4
Temp C : 28.9
RH % : 85.7
For Surface Data
Pressure mb : 1010.4
Temp C : 28.812
RH% : 85.384
Wind Spd m/s : 2.812
Wind Dir deg : 104.75
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear with lightning off to the east.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 33.9
Termination Altitude km : 23.201
Reason for Termination : balloon bust
Post-Termination Weather Description: Cirrus to the west, Strato cumulus to the east, nice sunrise.
For Surface Data
Pressure mb : 1011.3
Temp C : 27.279
RH % : 88.263
Wspd m/s : 1.8989
Wdir deg : 70.126
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 82: SOUNDING, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 01:09:04 GMT, LNA DC voltage measured
We measured the LNA dc voltage out from the injector block:
11.4 was first seen at power up of rack....(was that correct?)
7.1 V was observed during sounding.
The system here has produced good soundings so it isn't worth
changing, but the voltage may be a bit shy and could cause
difficulty perhaps in a more noisy location elsewhere.
- 81: SOUNDING, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 00:55:22 GMT, Clary GT1000 UPS running for GAOS
7/19/ 00:45 Reconfigured Power for GOAS computer/rack.
This system hasn't been on a UPS and consequently was getting
clobbered when the 'authorities' shut off trailer power.
This will take effect for the sounding on 7/19 12:00Z
In an attempt to allow the system to be backed up, we put the
UPS onto the surge supressor via 2-100' extension cords. This
appears to work and the UPS is happier and hasn't shutdown due to
the overvoltage problem the setup crew encountered.
(NOTE the Clary specs are somewhat contradictory indicating in 1 place
132 and in another 135 as the max-input VAC.
NOTE the first time we tried the UPS was by itself plugged directly
into the wall outlet and it was fine. Specs might be conservative?
NOTE the line voltage today is 134.5 so maybe the electrician
improved the situation.)
Anyway we measured the drop from wall into UPS:
using the 4A halogen light: from 134.5 to ~127.
GAOS PC/Rack: from 134.5 to 131.5 on input to UPS.
This implies that the load is roughly ~2A for GAOS stuff.
The GAOS computer will be shutdown between soundings from now
on per Lou. Rebooting the system now on the UPS worked just fine.
I grabbed the url for Clary UPS and downloaded the desc.sheet.
The crew was shown how to reconfigure to the way it was before if
that should be needed or desired.
- 80: DAILY, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 00:33:25 GMT, Daily report for July 18
Partly cloudy to overcast for most of today, clearing this afternoon, then reforming after the 0Z sounding.
Steve and John stopped by to back up Profiler data, play with the electricity, and check on the IR radiation.
Profiler disk write: 20.7%
134.5 volts
- 79: SOUNDING, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 22:35:54 GMT, Sounding Bahia Kino 19 July 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401512
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.8
Temp C : 32.34
RH % : 69.3
For Surface Data
Pressure mb : 1009.5
Temp C : 32.4
RH% : 68.7
Wind Spd m/s : 6.1
Wind Dir deg : 208
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Cirrostratus to the SSW, cumulus towers to the north.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 57.2
Termination Altitude km : 20.1
Reason for Termination : lost signal
Post-Termination Weather Description:
5/8 sky coverage. Stratocumulus in all directions, cumulus towers to the north have degraded.
For Surface Data
Pressure mb : 1008.9
Temp C : 32.704
RH % : 65.071
Wspd m/s : 4.8732
Wdir deg : 206.17
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 78: INFO, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 19:40:09 GMT, Roving team report for July 18
We are back in Kino for a day.
PROFILER DATA BACKUP:
Backed up Profiler SPC files onto two CD's. Two copies of each, one for
the trailer and one to take home. The profiler was down for an hour during
the process. 1705-1803Z. Note that there is about 1.5GB free so good for
almost another 3 weeks. Disk is about 19% full (there is a mystery of what
is taking up about 400 MB of space on D:)
CLASS RECEIVER:
Checked the voltage on the CLASS pre-amp under load. 11.37 volts which is
fine. Much better than Los Moches was. ALso checked T-dome and T-case wiring
is correct. LATER: Checked the pre-amp again during a sounding and found
a lower voltage. Some effect of having the RF in the circuit? Conclusion is
is not to change the class receiver.
POWER
Line voltage to ISS is still too high at 134.2 V. JWM set up a workaround.
We have the UPS preceeded by two 100-foot extension cords to drop the voltage
to within the UPS limits.
ISS3 WORKSTATION BACKUP
Ran data-backup script again. Taking DVD back to Boulder.
- 77: SURFACE, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 18:17:26 GMT, IRT down during quick check.
We checked the IR wiring here (similar to at Los Moches).
6L : T-dome
6H : T-case
This agrees with Steve Semmer's wiring diagram, and Gordon's notes for
Puerto Penasco, and also Los Moches after we switched those.
The sensor was disconnected from 19:20-19:35 Z.
- 76: RADAR, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 18:05:47 GMT, Profiler data backup and down time
Profiler backup today
Backed up the PROFILER SPC files.
VOLUME: NAME_KIN01
Days 04186-04195 (July 4-13)
Also backed up /data/test files directory
VOLUME: NAME_KIN02
Days 04196-04199 (July 14-17)
Profiler down from 17:05 through 18:03 for this process.
Can read (dir) disk on GLASS-pc; ok.
Also note SPC files are present on ISS3 workstation.
Deleted backed up files.
Made two CD copies. Will take one with us. Other stays at ISS3
Now free disk space is about 1.50 GB. Disk use is about 73 MB/day.
Disk write at 19.8%.
I don't understand the extra disk usage on the D: drive. There appears to
be less than 100 MB on the disk, but properties reports about 500 MB used.
Still enough free space for about 3 weeks.
- 75: SOUNDING, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 10:48:07 GMT, Sounding Bahia Kino 18 July 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12 Z
Sonde coef tape #: 408401101
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.25
Temp C : 27.94
RH % : 87
For Surface Data
Pressure mb : 1010.6
Temp C : 27.9
RH% : 86.8
Wind Spd m/s : 2.4
Wind Dir deg : 88
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear skys, no wind.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 48.5
Termination Altitude km : 21.6
Reason for Termination : balloon burst
Post-Termination Weather Description:
Scattered altocumulus.
For Surface Data
Pressure mb : 1011.7
Temp C : 27.549
RH % : 87.327
Wspd m/s : 1.9006
Wdir deg : 54.61
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 74: DAILY, Site ISS3 (Bahia Kino), Sat 17-Jul-2004 23:14:57 GMT, Daily report for July 17
Conditions last night were very abnormal, see 17 July 12 z sounding for detailed report.
Satellite out last night until approx. 4:00 am this morning. Got it running by rebooting the Motostat and laptop computer. Because of this 0z sounding for July 17 was not e-mailed until this morning after 12z launch.
Profiler disk write: 56.8%
133.3 volts
- 73: SOUNDING, Site ISS3 (Bahia Kino), Sat 17-Jul-2004 22:53:23 GMT, Sounding Bahia Kino 18 July 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401005
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009
Temp C : 31.9
RH % : 67
For Surface Data
Pressure mb : 1009
Temp C : 32.6
RH% : 68.5
Wind Spd m/s : 7.1
Wind Dir deg : 204
Pre-Launch Note conditions not observable by automatic systems
Weather Description Convective towers to the N.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 39.9
Termination Altitude km : 22.4
Reason for Termination : lost signal
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1009
Temp C : 31.392
RH % : 70.26
Wspd m/s : 5.06
Wdir deg : 211
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 72: SOUNDING, Site ISS3 (Bahia Kino), Sat 17-Jul-2004 10:59:09 GMT, Sounding Bahia Kino July 17th, 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401113
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.3
Temp C : 29.56
RH % : 68.9
For Surface Data
Pressure mb : 1009.0
Temp C : 29.8
RH% : 69.2
Wind Spd m/s : 2.4
Wind Dir deg : 241
Pre-Launch Note conditions not observable by automatic systems
Weather Description I happened to be up last night when the front came through and it was something spectacular. I would estimate surface gusts between 40-50kt from the south with sustained winds of 30kt and above and visibility less than a mile due to massive amounts of sand for about 30 minutes(beginning at about 8z). Now all is calm and clear.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 44.8
Termination Altitude km : 21.5
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Scattered patches of altocumulus.
For Surface Data
Pressure mb : 1010.3
Temp C : 27.311
RH % : 73.577
Wspd m/s : 3.03
Wdir deg : 108.2
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 71: SOUNDING, Site ISS3 (Bahia Kino), Sat 17-Jul-2004 01:11:32 GMT, Sounding Bahia Kino 17 July 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 00Z
Sonde coef tape #: 408401313
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.62
Temp C : 32.45
RH % : 64.80
For Surface Data
Pressure mb : 1006.6
Temp C : 32.5
RH% : 65.7
Wind Spd m/s : 4.4
Wind Dir deg : 227
Pre-Launch Note conditions not observable by automatic systems
Weather Description Cumulus towers on the horizon to the NNE. High cirrus on the horizon to the SSW. Sky coverage 1/8. Clear above immediate area.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 62.2
Termination Altitude km : 19.138
Reason for Termination : lost signal
Post-Termination Weather Description: Lightening to the Northe and East, cirrus to the west.
For Surface Data
Pressure mb : 1007.3
Temp C : 31.16
RH % : 76.855
Wspd m/s : 3.9079
Wdir deg : 230.66
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Sonde launched late at due to power outage at approximately 1:00 -1:30pm local time and not turned on until approximately 6pm local time.
Launch time 6:45 pm.
Having problems with our satellite link.
- 70: DAILY, Site ISS3 (Bahia Kino), Fri 16-Jul-2004 16:24:40 GMT, Daily Report for July 16
Power status:
Stopped by site this morning at 9AM to speak with the local electricians. They were not working. I spoke to the manager of the DICTUS site, he didn't know when they would be working but said he would tell us if he saw them working. Will have to keep checking on the site every few hours to try to catch them before they cut the power- most likely this will occur during the afternoon.
Brad waited at the site for an hour while I went back to the Hacienda, the electricians finally showed up at around 11AM. I spoke with them again and they told me they did not need to turn off the electricity today but possibly on Monday afternoon. They promised to give us warning before cutting the power.
Things didn't go as planned, the power was turned off on us at approximately 1:00-1:30 pm today. The electricians did try to contact us before hand but left no message. I am going to email Ramon, the manger of the DICTUS site, and tactfullystress that we need more notice about future power outages as well considerationof our launch schedule.
The power was restored at approximately 6-6:15 pm local time, we launched the sonde at approximately 6:45 pm local time.
Current weather: Overcast after this mornings launch, cleared off considerably. Only cumulus towers to the NNW, cirrus to the SSW.
Computers, profiler, RASS and surface tower functioning as expected.
Having some difficulty with our satellite link. Contacted Lou, will contact again if issue doesn't resolve itself.
Profiler disk write: 53.6%
The ISS roving team, Steve and John, is planning on heading this way either tomorrow or the next day.
- 69: SOUNDING, Site ISS3 (Bahia Kino), Fri 16-Jul-2004 10:52:08 GMT, Sounding Bahia Kino 16 July 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401009
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.03
Temp C : 28.68
RH % : 54.7
For Surface Data
Pressure mb : 1009.2
Temp C : 28.7
RH% : 54.7
Wind Spd m/s : 1
Wind Dir deg : 9
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies with some lightning on the horizon to the SSW.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 42
Termination Altitude km : 21.829
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Stratocumulus in all directions. Clearest in the NE. About 5/8 sky coverage.
For Surface Data
Pressure mb : 1009.8
Temp C : 28.264
RH % : 61.492
Wspd m/s : 1.8712
Wdir deg : 310.29
------------------------------------------------------------------------------
COMMENTS (10 second data is now updating.)
--------
- 68: DAILY, Site ISS3 (Bahia Kino), Fri 16-Jul-2004 00:33:57 GMT, Daily report July 15 and Power Outage Wrap-up
Everything is on and working after power failure. We had a tough time communicating with the electricians but determined with the help of the roving crew that since this was not an IOP that it wasn't worth the risk of losing another sonde due to another power failure. Tomorrow we will power down after our 12z launch due to the replacement of the power lines at the site.
Meteorological conditions are as follows:
At time of initial launch we had numerous convective towers in the mature stage over the water for the first time. I was able to observe lightning and surface winds were the strongest yet. At the current time all towers have dissipated and only cirrus clouds remain.
Voltage in the trailer was recorded after the power outage at 135.4 volts which is the highest that I have yet to measure.
- 67: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Fri 16-Jul-2004 00:11:22 GMT, Power Outage!
For our 0z launch on July 16th we launched on time. However, at approximately 750mb we had a power failure and lost everything. At the Dictus site they are in the process of installing new power lines and we were given no heads up as to this outage. It is currently 0015z (5:15 local) and we have half an hour to get off the balloon. We talked with the electricians and it seems as though this may happen again as they are here working until 6:30 local time. Tomorrow they plan on switching all electricity lines in the morning. It seems that we will still be able to execute our launches as we are here from 3:30 to about 6:30 and they plan to begin at 8:00. Our question has to do with the possibility of powering down equipment tomorrow due to the power outage. We don't know how long it will last but will try to find out. Our cell phone wasn't cooperating for a while and we were unable to contact the roving team, Los Mochis, or Puerto Penasco. Lindsey at the Loreto site is working on finding someone to help us out. As of now we have decided not to risk another launch incase of another power failure and we will wait to hear something different. We are at the site and this is the best form of communication that we have at the current time.
- 66: SOUNDING, Site ISS3 (Bahia Kino), Thu 15-Jul-2004 22:35:53 GMT, Sounding Bahia Kino 16 July 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 00Z
Sonde coef tape #:408401500
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.45
Temp C : 31.97
RH % : 62
For Surface Data
Pressure mb :1009.9
Temp C : 32
RH% : 65.1
Wind Spd m/s : 5.7
Wind Dir deg : 243
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Convection present in all directions, including over the water to the WSW, mostly clear over head.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb :
Termination Altitude km :
Reason for Termination :
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (Power outage just after launch at 2308, no telling when it will be back on.)
--------
- 65: SOUNDING, Site ISS3 (Bahia Kino), Thu 15-Jul-2004 10:56:52 GMT, Sounding Bahia Kino 15 July 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408401409
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1012.21
Temp C : 27.8
RH % : 82.1
For Surface Data
Pressure mb :1013.2
Temp C : 27.6
RH% : 83.5
Wind Spd m/s :.4
Wind Dir deg : 308
Pre-Launch Note conditions not observable by automatic systems
Weather Description
partly cloudy
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 53.6
Termination Altitude km : 20.3
Reason for Termination : balloon burst
Post-Termination Weather Description: overcast, 7/8 sky coverage
For Surface Data
Pressure mb : 1013.5
Temp C : 27.224
RH % : 82.14
Wspd m/s : .6478
Wdir deg : 334.87
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
10 second data still frozen
- 64: DAILY, Site ISS3 (Bahia Kino), Thu 15-Jul-2004 00:41:20 GMT, Daily report for July 15
Current weather:
Computers, profiler, RASS and surface tower functioning as expected.
Profiler disk write: 47.0%
Still not receiving 10 second data for sounding. Raw met data is comming in fineand the soundings looked fine.
Awesome convective processes today. Numerous updrafts began to form but lack of speed shear prevented storm genesis. Hopefully they will return tonight.
- 63: SOUNDING, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 22:47:59 GMT, Sounding Bahia Kino 15 July 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #:408401201
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.11
Temp C : 31.64
RH % : 65.7
For Surface Data
Pressure mb : 1012.6
Temp C : 31.9
RH% : 66.4
Wind Spd m/s : 5.6
Wind Dir deg : 214
Pre-Launch Note conditions not observable by automatic systems
Weather Description Convection is present all around. One tower in the southwest, one immaculate tower due north-northwest, and several in the dissipation stages.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 38.6
Termination Altitude km : 22.5
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Overcast with altocumulus.
For Surface Data
Pressure mb : 1012.5
Temp C : 30.273
RH % : 74.962
Wspd m/s : 5.7405
Wdir deg : 207.76
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 62: SOUNDING, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 16:55:06 GMT, Sounding Bahia Kino 14 July 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 18z
Sonde coef tape #:408401405
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1014.22
Temp C : 30.6
RH % : 69.7
For Surface Data
Pressure mb : 1015.5
Temp C : 29.6
RH% : 76.7
Wind Spd m/s : 2.6
Wind Dir deg : 144
Pre-Launch Note conditions not observable by automatic systems
Weather Description Heavy rain and thunder shortly after dawn with a lot of standing water on local roads. Overcast skies with continuous propogation of small scale cumulonimbus clouds over the gulf.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 37.0
Termination Altitude km : 22.7
Reason for Termination : Balloon burst.
Post-Termination Weather Description: 7/8 oktas sky cover with stratus and scattered low level cumulus.
For Surface Data
Pressure mb : 1015.2
Temp C : 33.06
RH % : 57.984
Wspd m/s : 5.7748
Wdir deg : 179.68
------------------------------------------------------------------------------
COMMENTS (10 second PTH and altitude data did not update on this launch like the previous two launches.)
--------
- 61: SOUNDING, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 10:48:02 GMT, Sounding Bahia Kino 14 July 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #:408401314
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.92
Temp C : 26.86
RH % : 73.4
For Surface Data
Pressure mb : 1013.0
Temp C : 27.1
RH% : 72.2
Wind Spd m/s : 3.8
Wind Dir deg : 73
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 41.0
Termination Altitude km : 21.996
Reason for Termination : balloon burst
Post-Termination Weather Description:
Strato Cumulus in all directions and above, small cumulus towers to the WSW, sky coverage approximately 5/8.
For Surface Data
Pressure mb : 1013.8
Temp C : 26.523
RH % : 74.92
Wspd m/s : 1.8777
Wdir deg : 22.561
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
10 second data not updating- raw data coming in,sounding looks okay.
- 60: SOUNDING, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 04:52:54 GMT, Sounding Bahia Kino 14 July, 06Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 06Z
Sonde coef tape #:408403610
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.84
Temp C : 29.09
RH % : 82.7
For Surface Data
Pressure mb : 1012.6
Temp C : 29.1
RH% : 79.3
Wind Spd m/s : 1.9
Wind Dir deg : 163
Pre-Launch Note conditions not observable by automatic systems
Weather Description: Lightning to the East
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 43.9
Termination Altitude km : 21.6
Reason for Termination : Balloon go boom.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
The 10 second data was not updating, frozen on the same numbers throughout the
whole sounding. Raw data coming in fine, sounding looked fine.
- 59: DAILY, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 02:00:54 GMT, Daily report for July 14
Current weather:
Large cumulus towers on the horizon to the east, evidence of convection- degraded towers, cirrostratus, stratocumulus to the north. The cloud cover has cleared some since this morning to approximately 1/8 sky coverage. Cooler ambient temps as well as water temps- waves are up in Bahia Kino.The easterly winds from this morning have moved through the south to the west and have incresed in speed to 6 m/s.
Computers, profiler, RASS and surface tower functioning as expected.
On 6th Helium tank.
2 bad sondes so far- third repaired.
Profiler disk write: 43.8%
During the 06Z and 12Z soundings the 10 second data was not updating, the raw met data was comming in fine, and the sounding looked fine.
- 58: DAILY, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 22:54:03 GMT, Daily report for Power-up 23z 7/13
Power-up went well. Tested voltage in trailer at 135.4v, which is up from previous measurements.
Brad
- 57: SOUNDING, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 22:41:07 GMT, Sounding Bahia Kino 14 July, 00Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 00Z
Sonde coef tape #:408401213
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.5
Temp C : 31.7
RH % : 58.1
For Surface Data
Pressure mb : 1009.7
Temp C : 32.024
RH% : 61.29
Wind Spd m/s : 4.313
Wind Dir deg : 215
Pre-Launch Note conditions not observable by automatic systems
Weather Description Scattered cirrus and altocumulus/stratus
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 34.1
Termination altitude km : 23.327
Reason for Termination : Ballon burst
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1010.1
Temp C : 31.31
RH % : 66.159
Wspd m/s : 3.34
Wdir deg : 205
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 56: SOUNDING, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 17:01:46 GMT, Sounding Bahia Kino 13 July, 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 18z
Sonde coef tape #:408401001
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.6
Temp C : 30.8
RH % : 62.1
For Surface Data
Pressure mb : 1012.6
Temp C : 30.868
RH% : 63.741
Wind Spd m/s : 6.139
Wind Dir deg : 149.81
Pre-Launch Note conditions not observable by automatic systems
Weather Description Overcast with slight showers.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 40.7
Termination Altitude km : 22.124
Reason for Termination : Balloon Burst.
Post-Termination Weather Description: Overcast.
For Surface Data
Pressure mb : 1012.5
Temp C : 31.823
RH % : 59.568
Wspd m/s : 4.0272
Wdir deg : 150.81
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 55: SOUNDING, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 10:43:38 GMT, Sounding Bahia Kino 13 July, 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408413403
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.57
Temp C : 29.27
RH % : 78.9
For Surface Data
Pressure mb : 1010.5
Temp C : 29.4
RH% : 77.8
Wind Spd m/s : 5.5
Wind Dir deg : 136
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies with strong surface winds from the east.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 45.6
Termination Altitude km : 21.343
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Strato cumulus in all directions with some overhead, approx. 2/8-3/8 sky coverage.
For Surface Data
Pressure mb : 1011.1
Temp C : 27.411
RH % : 69.743
Wspd m/s : 6.5931
Wdir deg : 120.53
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 54: SOUNDING, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 04:39:02 GMT, Sounding Bahia Kino 13 July, 6z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408403605
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.12
Temp C : 30.66
RH % : 75.6
For Surface Data
Pressure mb : 1008.9
Temp C : 30.6
RH% : 77.2
Wind Spd m/s : 3.0
Wind Dir deg : 119
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 69.1
Termination Altitude km : 18.6
Reason for Termination : Lost signal
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1009.4
Temp C : 30.326
RH % : 79.932
Wspd m/s : 3.9847
Wdir deg : 141.45
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 53: DAILY, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 01:22:26 GMT, Daily report for July 13
Current weather:
The cumulus towers to the north have degraded as the day has progressed and now appear mostly as cirrus and stratus along the horizon- some cumulus in the NE. Last night during the July 11 06Z sounding experienced periods of heavy rain. It was not raining when we launched the sounding or left the site.
Computers, profiler, RASS and surface tower functioning as expected.
On 5th Helium tank.
3 bad sondes so far- one can be repaired.
Profiler disk write: 40.4%
- 52: SOUNDING, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 22:49:55 GMT, Sounding Bahia Kino 13 July, 00z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 00Z
Sonde coef tape #: 408403709
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.57
Temp C : 33.85
RH % : 56.3
For Surface Data
Pressure mb : 1006.7
Temp C : 34.2
RH% : 54.9
Wind Spd m/s : 6.2
Wind Dir deg : 195
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear overhead; some towers on horizon, E, N, and SW
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 88.4
Termination Altitude km : 17.4
Reason for Termination : Signal Loss
Post-Termination Weather Description: Outlying towering-Q clearing/fizzling. Humidity rising due to rain last night.
For Surface Data
Pressure mb : 1005.9
Temp C : 32.57
RH % : 64.4
Wspd m/s : 8.47
Wdir deg : 194.1
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 51: SURFACE, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 22:47:54 GMT, Measured CLASS pre-amp voltages
As a baseline to compare with Los Moches,
we measured voltages at the CLASS antenna tower:
Input VOC: 12.4
Voltage at pre-amp: 7.3
DC current: 25mA
- 50: SOFTWARE, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 22:24:28 GMT, LIST OF BACKUP DISKS
Please add to this log as DVD's are written.
ISS3 WORKSTATION BACKUPS
KINO ISS3 System Backup: 12-July-2004 : Created a system image (backup) no data option using /iss/scripts/backup (Charlie)
KINO ISS3 Data Backup: 12-July-2004 : Created a data backup, 02-12 July-2004.
Includes SPC files through Day 193 (11-July). Taking back to Boulder.
KINO ISS3 Data Backup: 18-July-2004 : Created a data backup. Includes SPC
files through Day 199. Taking back to Boulder.
PROFILER BACKUPS
NAME_KIN01: D04186-D04195 (July 4-13) created 7/18/04
NAME_KIN02: D04196-D04199 (July 14-17) created 7/18/04
- 49: INFO, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 19:38:32 GMT, Roving team notes
Steve, John, Charlie at Kino today. Hal flew home this morning.
We got to meet Jennifer and Brad. Sounding from here look very good.
They note a couple of times losing signal when the sonde travels far
to the SSE. No big obstructions in thtat direction.
We had an impressive lightning show at the Hermosillo hotel last
night, from about 9-9:45pm (4-4:45Z). The storm was moving East to West.
The Bahia Kino soap plots show rain aloft approx. 5:45-7:00Z and another
brief shower around 8:30Z.
Rain gauge shows rain at the surface: 0.4 mm near 6Z and another 0.1 mm near 7Z.
No tips around 8:30Z.
Profiler POP consensus winds look good, despite some bird clutter in the
individual dwells. Nice match of low winds with surface tower.
We added tie-downs to the rain gauge.
Checked profiler level: ok. In fact about as level as can be.
- 48: SURFACE, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 19:35:29 GMT, Confirmed PYG wiring; matches Puerto Penasco
We checked the cabling on the PYG. Matches the notes from Puerto Penasco.
Data gap for a few of minutes, approx. 1916-1923 and again 1928-1933Z.
Dc on photopile 5H-5L ~.3mV on meter....ie no resolution to read.
- 47: SOUNDING, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 16:49:39 GMT, Sounding Bahia Kino 12 July, 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408413201
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.1
Temp C : 33.4
RH % : 60.2
For Surface Data
Pressure mb : 1009.3
Temp C : 33.657
RH% : 62.209
Wind Spd m/s : 3.3967
Wind Dir deg : 218.05
Pre-Launch Note conditions not observable by automatic systems
Weather Description Mostly cloudy.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 44.8
Termination Altitude km : 21.534
Reason for Termination : Balloon burst
Post-Termination Weather Description: Same as above. Humidity rising due to rain last night.
For Surface Data
Pressure mb : 1009.3
Temp C : 33.558
RH % : 59.181
Wspd m/s : 5.1738
Wdir deg : 212.72
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 46: SOUNDING, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 10:46:16 GMT, Sounding Bahia Kino 12 July, 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408412409
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.86
Temp C : 29.09
RH % : 81.2
For Surface Data
Pressure mb : 1006.7
Temp C : 29.7
RH% : 78.3
Wind Spd m/s : 1.7
Wind Dir deg : 86
Pre-Launch Note conditions not observable by automatic systems
Weather Description Overcast.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 47.7
Termination Altitude km : 21
Reason for Termination : balloon burst
Post-Termination Weather Description: Scattered clouds.
For Surface Data
Pressure mb : 1007.2
Temp C : 27.385
RH % : 83.358
Wspd m/s : 2.384
Wdir deg : 61.405
------------------------------------------------------------------------------
COMMENTS
--------
- 45: SOUNDING, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 04:48:24 GMT, Sounding Bahia Kino 12 July, 6z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408413514
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.14
Temp C : 31.63
RH % : 65.2
For Surface Data
Pressure mb : 1006.6
Temp C : 31.774
RH% : 65.1
Wind Spd m/s : 3.2
Wind Dir deg : 258
Pre-Launch Note conditions not observable by automatic systems
Weather Description Great lightning show to immediate NE. Clear around here
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 132.7
Termination Altitude km : 15
Reason for Termination : Lost transmission of MET data.
Post-Termination Weather Description: Thunderstorms and Rain.
For Surface Data
Pressure mb : 1008.3
Temp C : 31.632
RH % : 60.496
Wspd m/s : 4.2526
Wdir deg : 101.47
------------------------------------------------------------------------------
COMMENTS (We have our first precipitation in the form of a thunderstorm! Trailer door is leaking and Charlie said we would look into repairing it in the morning. Volts tested in trailer at 134.2)
--------
- 44: DAILY, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 23:02:56 GMT, Daily report for Sunday July 12
Current weather:
Large Cumulus tower with a well defined anvil and updraft region on the horizon to the North, closer than those observed previously at the 00Z launch.
Computers, profiler, RASS and surface tower functioning as expected.
Profiler disk write: 36.6%
- 43: SOUNDING, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 22:35:21 GMT, Sounding Bahia Kino July 12th, 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 22:35
Sonde coef tape #: 408413208
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1004.11
Temp C : 35.19
RH % : 52.8
For Surface Data
Pressure mb :1005.5
Temp C : 34.8
RH% : 54.7
Wind Spd m/s : 5.4
Wind Dir deg : 214
Pre-Launch Note conditions not observable by automatic systems
Weather Description Towering cumulus to the NNE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 52.7
Termination Altitude km : 20.614
Reason for Termination : no longer receiving new data, lost signal
Post-Termination Weather Description:
Cumulus tower to the north less organized, anvil top facing south, cumulus on
the horizon NNE
For Surface Data
Pressure mb : 1004.6
Temp C : 34.145
RH % : 56.549
Wspd m/s : 5.7389
Wdir deg : 211.86
------------------------------------------------------------------------------
COMMENTS ()Lost winds around 80 mb, lost signal around 50 mb.
--------
- 42: SOUNDING, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 10:44:36 GMT, Sounding Bahia Kino July 11th, 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 10:47
Sonde coef tape #: 408413202
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.05
Temp C : 28.4
RH % : 64.20
For Surface Data
Pressure mb : 1008.6
Temp C : 28.4
RH% : 73.4
Wind Spd m/s : .3
Wind Dir deg : 143
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skys.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 58.1
Termination Altitude km : 19.858
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Cirrus and stratus along the NE horizon.
For Surface Data
Pressure mb : 1009
Temp C : 26.546
RH % : 67.229
Wspd m/s : 1.9006
Wdir deg : 33.752
------------------------------------------------------------------------------
COMMENTS ()
--------
- 41: DAILY, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 00:07:51 GMT, Daily report for Saturday July 11
Current weather:
Cumulus Towers on the horizon to the North around to the East.
Profiler disk write: 33.3%%
132.1 volts
- 40: DAILY, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 00:03:27 GMT, Daily report for Saturday July 10
Current weather is cumulus towers and maris tail cirrus to the north.
Profiler disk write: 29.9%
133.8 volts
- 39: SOUNDING, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 22:38:54 GMT, Sounding Bahia Kino July 11th, 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408412402
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1003.86
Temp C : 34.97
RH % : 48.2
For Surface Data
Pressure mb : 1005.8
Temp C : 34.2
RH% : 50.8
Wind Spd m/s : 6.7
Wind Dir deg : 245
Pre-Launch Note conditions not observable by automatic systems
Weather Description (Clear Skies all around with exception of developing cumulonimbus towers on the horizon from ESE to North.)
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 60.4
Termination Altitude km : 19.8
Reason for Termination : out of range
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1004.9
Temp C : 34.921
RH % : 48.193
Wspd m/s : 5.0513
Wdir deg : 258.67
------------------------------------------------------------------------------
COMMENTS (We were unable to retrieve raw met data from sonde #408413406 so we cancelled the flight. On a side note, we had to terminate the flight rather than hitting the panic stop button so I don't know if a false D file was created and published to the site. We will examine the website and see if we can find out.Ther is a false D file.)
--------
- 38: SOUNDING, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 10:55:42 GMT, Sounding Bahia Kino Saturday July 10, 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #:408413510
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.21
Temp C : 23.24
RH % : 64.9
For Surface Data
Pressure mb : 1007.9
Temp C : 26
RH% : 79.4
Wind Spd m/s : 1.5
Wind Dir deg : 47
Pre-Launch Note conditions not observable by automatic systems
Weather Description All clear.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 54
Termination Altitude km : 21
Reason for Termination : Inconsistent Data
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1008.3
Temp C : 24.434
RH % : 76.278
Wspd m/s : 2.7303
Wdir deg : 6.3289
------------------------------------------------------------------------------
COMMENTS (Good Launch)
--------
- 37: SOUNDING, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 04:46:33 GMT, Sounding Bahia Kino Saturday July 10 6z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 06Z
Sonde coef tape #:408413209
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.91
Temp C : 29.52
RH % : 76.60
For Surface Data
Pressure mb :1007.6
Temp C : 29.9
RH% : 65.4
Wind Spd m/s : 4.6
Wind Dir deg : 245
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Lightening to the ENE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 43.9
Termination Altitude km : 21.630
Reason for Termination : balloon burst
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1007.6
Temp C : 29.943
RH % : 65.236
Wspd m/s : 3.4767
Wdir deg : 247.26
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Lightening to the north.
- 36: SOUNDING, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 04:43:24 GMT, Sounding Bahia Kino Template
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:
launch time UTC:
Sonde coef tape #:
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb :
Temp C :
RH % :
For Surface Data
Pressure mb :
Temp C :
RH% :
Wind Spd m/s :
Wind Dir deg :
Pre-Launch Note conditions not observable by automatic systems
Weather Description
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb :
Termination Altitude km :
Reason for Termination :
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 35: DAILY, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 00:29:22 GMT, Daily report for Friday July 9
Current weather is cumulus towers and maris tail cirrus to the north.
Profiler disk write: 29.9%
133.8 volts
- 34: SOFTWARE, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 23:48:26 GMT, tklog fixed at Los Mochis
Remotely fixed the tklog at Los Mochis. The log file had gottent corrupted, so I replaced it with the .auto file. They only lost one partial log entry.
- 33: SURFACE, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 18:23:22 GMT, IR Radiation Sensor Tests
Replaced the PYG at Kinoat about 1600 Z with the PYG from Los Mochis to test the Los Mochis sensor, it seems to work both without a battery and with a battery, the battery seems to reduce the output by about 10 to 20 Watts. I have returned the Kino Bay PYG to its stand. John Millitzer should pick up the Los Mochis Pyg at Kino to return to Los Mochis. John should check the wiring at Los Mochis especially the pins in the connectors.
Hal
- 32: SOUNDING, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 16:25:55 GMT, Sounding Bahia Kino Friday July 9th 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040709
launch time UTC: 18z
Sonde coef tape #:408413409
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.7
Temp C : 32.12
RH % : 48.1
For Surface Data
Pressure mb :1009.8
Temp C : 31.4
RH% : 53.2
Wind Spd m/s : 2.5
Wind Dir deg : 173
Pre-Launch Note conditions not observable by automatic systems
Weather Description (Partly cloudy with 4/8 coverage.)
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 49.1
Termination Altitude km : 20.8
Reason for Termination : Inconsistent Data
Post-Termination Weather Description: Cumulus to east but clear in Bahia Kino.
For Surface Data
Pressure mb : 1009.8
Temp C : 32.49
RH % : 53.16
Wspd m/s : 3.4228
Wdir deg : 215.27
------------------------------------------------------------------------------
COMMENTS (Good Launch.)
--------
- 31: SOUNDING, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 10:26:31 GMT, Sounding Bahia Kino Friday July 9th 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040709
launch time UTC: 12z
Sonde coef tape #:408413205
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.3
Temp C : 25.9
RH % : 84.70
For Surface Data
Pressure mb : 1008.1
Temp C : 26.0
RH% : 87.2
Wind Spd m/s : 2.6
Wind Dir deg : 9
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( visibility, sea state, cloud coverage and cloud type,
rain, virga, etc. )
partially overcast
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 100.2
Termination Altitude km : 16.4
Reason for Termination : Loss of Data
Post-Termination Weather Description: Partly cloudy with mid-level cumulus approaching from SE.
For Surface Data
Pressure mb : 1008.5
Temp C : 26.5
RH % : 86
Wspd m/s : 3.8
Wdir deg : 20
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 30: SOUNDING, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 04:36:58 GMT, Sounding Bahia Kino Friday July 9 6z launch
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040709
launch time UTC: 06Z
Sonde coef tape #:408413412
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.22
Temp C : 27.7
RH % : 75.7
For Surface Data
Pressure mb : 1008.5
Temp C : 28.9
RH% : 86.4
Wind Spd m/s : 4.2
Wind Dir deg : 229
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( visibility, sea state, cloud coverage and cloud type,
rain, virga, etc. )
visibility clear, lightening and cumulus on the horizon to the ENE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 43.0
Termination Altitude km : 23.6
Reason for Termination : Balloon Burst
Post-Termination Weather Description: Same
For Surface Data
Pressure mb : 1008.5
Temp C : 28.641
RH % : 77.912
Wspd m/s : 4.2313
Wdir deg : 198.38
------------------------------------------------------------------------------
COMMENTS (Good Launch.)
--------
- 29: SOUNDING, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 22:22:40 GMT, Sounding Bahia Kino for Friday July 9 00Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040709
launch time UTC: 0z
Sonde coef tape #: 408401609
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.98
Temp C : 31.97
RH % : 72.1
For Surface Data
Pressure mb : 1007.9
Temp C : 31.7
RH% : 72.5
Wind Spd m/s : 5.5
Wind Dir deg : 226
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( See daily log for Thursday July 8th. )
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 50.3
Termination Altitude km : 20.88
Reason for Termination : Data too inconsistent to continue.
Post-Termination Weather Description: All clouds to south completely eroded. Only remaining clouds are cirrus over Gulf and convective towers on the horizon both in the East as well as new convective initiation to the north.
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (We encountered a problem with sonde # 408413413 and cancelled it. We never launched the sonde and restarted the GLASS program with the new sonde. I don't know what the problem was with the transmission signal when trying to locate the new sonde but I ended up turning off the AFC on the computer screen, manually shifting the frequency down to 402.05 on the screen, and then tuning the sonde until I reached 99db and the highest level of reception. At the current time we have no way to toggle the AFC and we are getting static interference but the db is still at 99 and locked on our frequency so everything is going okay for now.After 200mb we resolved this problem.)
--------
- 28: DAILY, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 22:19:26 GMT, Daily report for Thursday, July 8
Atmosphere is beginning to change. We had 7 to 8 oktas cloud cover today, almost overcast, for about 2 hours earlier this afternoon. Cloud erosion is beginning to occur to the southeast but even more exciting is the appearance of a few convective towers including a cumulonimbus in the mature stage to the east near Hermosillo from our perspective. Hopefully storms are not far behind.
- 27: SOUNDING, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 16:25:30 GMT, Sounding Bahia Kino for Thursday July 8 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040708
launch time UTC: 1705z
Sonde coef tape #: 408401404
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.16
Temp C : 33.05
RH % : 59.90
For Surface Data
Pressure mb : 1011.2
Temp C : 32.6
RH% : 59.9
Wind Spd m/s : 5.2
Wind Dir deg : 159
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( Rather interesting scenario today. Upper level cirrus are the same but some evidence of orographic lifting because of new cumulus field to our immediate northwest. Very interesting. Monsoon is nearing? )
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 26.9
Termination Altitude km : 24.8
Reason for Termination : Balloon burst
Post-Termination Weather Description:
For Surface Data
Pressure mb : 1010.8
Temp C : 32.171
RH % : 66.837
Wspd m/s : 5.9545
Wdir deg : 195.95
------------------------------------------------------------------------------
COMMENTS (Data quality very good this launch. Cumulus clouds still present in NW with increasing altocumulus/cirrus from the SE. Good launch.)
--------
- 26: SOUNDING, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 10:30:20 GMT, Sounding Bahia Kino for Thurs. July 08 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040708
launch time UTC: 10:30
Sonde coef tape #: 408413206
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.95
Temp C : 28.30
RH % : 51.5
For Surface Data
Pressure mb : 1009.6
Temp C : 28.3
RH% : 52.3
Wind Spd m/s : 2.1
Wind Dir deg : 162
Pre-Launch Note conditions not observable by automatic systems
Weather Description (Clear skies. Lightning can be see in the distance to the northeast.)
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 32.2
Termination Altitude km : 22
Reason for Termination : Balloon burst
Post-Termination Weather Description: Mix of cirrus, stratus, cumulus to the NNE,few alto stratus to South, visibility 1/8.
For Surface Data
Pressure mb : 1010
Temp C : 26.726
RH % : 80.814
Wspd m/s : 2.5131
Wdir deg : 80.176
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Panic stopped GLASS program in order to tune in new frequency- wasn't responding-worked fine on second attempt,straight line along the 345 degree radial out 2-3km right after start appeared on position graph, humidity sensor cover fell off as balloon was being released.
- 25: SOUNDING, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 04:28:48 GMT, Sounding Bahia Kino for Thursday July 8 06Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040708
launch time UTC: 06Z
Sonde coef tape #:408403713
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.72
Temp C : 29.19
RH % : 89
For Surface Data
Pressure mb :1009.2
Temp C : 28.9
RH% : 88.4
Wind Spd m/s : 4.4
Wind Dir deg : 223
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( Clear skies.)
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 34.9 mb
Termination Altitude km : 23.071
Reason for Termination : balloon burst
Post-Termination Weather Description:
For Surface Data
Pressure mb : 1009.9
Temp C : 28.962
RH % : 84.727
Wspd m/s : 2.923
Wdir deg : 172.4
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
All is well, no problems.
- 24: DAILY, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 00:44:56 GMT, Daily report for Wed. July 07
Atmospheric conditions are clear in our area with scattered cirrus to the south and a developing cumulus field to the SSW.
Profiler disk at 23.0%
- 23: SOUNDING, Site ISS3 (Bahia Kino), Wed 07-Jul-2004 22:33:21 GMT, Sounding Bahia Kino for Wed. July 08 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:
date yymmdd: 040708
launch time UTC: 00Z
Sonde coef tape #:408413214
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.04
Temp C : 32.04
RH % : 68.5
For Surface Data
Pressure mb : 1009.7
Temp C : 31.908
RH% : 69.296
Wind Spd m/s : 7.1223
Wind Dir deg : 215.22
Pre-Launch Note conditions not observable by automatic systems
Weather Description (visibility clear, high cirrus to south and west.)
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 177.9
Termination Altitude km : 13.198
Reason for Termination : Quit recording data and lost signal.
Post-Termination Weather Description: High cirrus and cumulus to the south. Visibility still clear.
For Surface Data
Pressure mb : 1008.5
Temp C : 31.035
RH % : 73.484
Wspd m/s : 3.9831
Wdir deg : 218.76
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Launch button not hit before balloon release by 2-4 minutes.
- 22: SOUNDING, Site ISS3 (Bahia Kino), Wed 07-Jul-2004 16:15:36 GMT, Sounding Bahia Kino for Wed. July 07 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040707
launch time UTC: 1650
Sonde coef tape #: 408413515
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1013.3
Temp C : 31.4
RH % : 58
For Surface Data
Pressure mb : 1012
Temp C : 32
RH% : 55
Wind Spd m/s : 4.4
Wind Dir deg : 190
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( Partly cloudy with 4/8 oktas coverage cirrus deck. )
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 108.9
Termination Altitude km : 16.1
Reason for Termination : Out of Range
Post-Termination Weather Description:
For Surface Data
Pressure mb : 1012.9
Temp C : 31.768
RH % : 67.397
Wspd m/s : 6.616
Wdir deg : 194.06
------------------------------------------------------------------------------
COMMENTS (10 Second update in GLASS malfunctioned at 2m AGL causing all meteorological data to be reported the same throughout flight. 1 second data worked fine.)
--------
- 21: SOUNDING, Site ISS3 (Bahia Kino), Wed 07-Jul-2004 10:04:11 GMT, Sounding Bahia Kino for Wed. July 07 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040707
launch time UTC: 10:04
Sonde coef tape #: 408413408
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.29
Temp C : 28.79
RH % : 78.2
For Surface Data
Pressure mb : 1010.6
Temp C : 28.8
RH% : 76.9
Wind Spd m/s : 3.9
Wind Dir deg : 202
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( Not as humid as yesterday at this time. Clear skies and cirrus deck to the east. )
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 48.8
Termination Altitude km : 20.7
Reason for Termination : Out of range
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1011.1
Temp C : 27.445
RH % : 87.567
Wspd m/s : 2.7156
Wdir deg : 68.479
------------------------------------------------------------------------------
COMMENTS (Seems to be doing the same thing as yesterday. Once sonde gets to 100mb we seem to have transmission problems.)
--------
- 20: SOUNDING, Site ISS3 (Bahia Kino), Tue 06-Jul-2004 22:14:35 GMT, Sounding Launch 00z July 7
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: bahia kino
date yymmdd: 040707
launch time UTC: 0z
Sonde coef tape #:408412407
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.88
Temp C : 31.4
RH % : 71.2
For Surface Data
Pressure mb : 1010.6
Temp C : 31.3
RH% : 74.1
Wind Spd m/s : 4.4
Wind Dir deg : 224
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( Scattered cirrus on the horizon but clear in our area.Humidity similar to yesterday. )
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 87.1
Termination Altitude km : 17.3
Reason for Termination : out of range at approx. 30km
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1009.2
Temp C : 30.861
RH % : 72.58
Wspd m/s : 5.7062
Wdir deg : 215.49
------------------------------------------------------------------------------
COMMENTS (Balloon appeared out of range because it passed the 30km diameter circle. All radio sonde data was offset 3km to East NE immediately after launch.)
--------
- 19: DAILY, Site ISS3 (Bahia Kino), Tue 06-Jul-2004 22:13:42 GMT, Daily report for Tuesday July 6 Power Up
Power up went great, getting ready to launch.
- 18: DAILY, Site ISS3 (Bahia Kino), Tue 06-Jul-2004 13:07:28 GMT, Daily report for Tuesday July 6
There is a lot going on in Bahia Kino this morning. Atmospheric conditions are clear in our area with scattered cirrus to the west and a developing cumulus field to the WSW.
The power is going to be shut off soon for work on the electricity at the DICTUS site so we will do a complete shutdown just prior to avoid problems. We will then post another report after power-up to report specific conditions of the atmosphere.
- 17: SOUNDING, Site ISS3 (Bahia Kino), Tue 06-Jul-2004 11:16:46 GMT, Sounding Launch 12z July 6
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: bahia kino
date yymmdd: 040706
launch time UTC: 1110Z
Sonde coef tape #:408413203
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.97
Temp C : 26.41
RH % : 81.20
For Surface Data
Pressure mb : 1011.9
Temp C : 26.5
RH% : 82
Wind Spd m/s : 1.3
Wind Dir deg : 17
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( Minimal visibility due to darkness but very humid this morning. )
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 37.2
Termination Altitude km : 22
Reason for Termination : balloon burst
Post-Termination Weather Description: Just after sunrise and the west is mostly cloudy with cirrus cloud deck. Seems to erode with adiabatic heating during themid-morning. East of site, all is clear, 0-1 oktas.
For Surface Data
Pressure mb : 1012
Temp C : 24.236
RH % : 88.624
Wspd m/s : 1.7879
Wdir deg : 29.864
------------------------------------------------------------------------------
COMMENTS (Good launch today, wind data throughout entire flight)
--------
- 16: DAILY, Site ISS3 (Bahia Kino), Mon 05-Jul-2004 22:04:59 GMT, Daily report for Mon. July 5
Daily Report July 5
Equipment check okay. Scattered cirrus around the area. Humidity up today at 75% Hal, Charlie, and Nick left today with sondes (420) for Los Mochis and Mike and Bill left for Puerto Penasco.
Temperature at present is 35c with winds ssw at 6-7 m/s.
- 14: RADAR, Site ISS3 (Bahia Kino), Mon 05-Jul-2004 03:27:30 GMT, Profiler settings
Bahi Kino ISS3 Profiler Settings:
#2 (low) #3 (high) #4 (RASS)
IPP (microsec) 60 110 20
PW (nanosec) 700 1700 400
CODE 4 2 0
NHTS 57 47 22
DELAY (ns) 2400 4900 1800
SPACE (ns) 700 1700 400
COH.AVG. 80 44 10
SPEC.AVG. 36 37 15
NPTS 128 128 128
SCALE (m/s) 17.1 16.9 409.6
DWELL (sec) 28 28 3 (actually about 15)
HEIGHT (km) 0.20 0.48 0.12
(km) 6.07 12.21 1.26
IPP (km) 8.43 15.83 2.68
PULSE (m) 105 255 60
BEAMS 1 1 1 1 1 1 1 1 1 AZI ZEN
yvert22 2 3 285 0
xvert21 2 15 0
y+W38 2 285 21
y-E26 2 3 105 21
x+N25 2 3 15 21
x-S37 2 195 21
Wind consensus 30 minutes 55% Oblique 2m/s Vert 1.5 m/s
RASS consensus 5 minutes 55% 2m/s
RASS Spectra 15C to 45C
Source 10C to 50C
RASS is off from 4UT to 17UT because of nearby houses.
ICRA Averaging. Spectra are being saved.
Consensus files are written via trailer network to data manager computer.
POP moments are transmitted via serial cable to data manager to generate SOAP plots.
Once per day (after 0Z) spectra are copied for data manager for archiving and NIMA processing.
The site is next to an estuary. The water is fairly calm but does generate
some clutter at times. There are also trees, bushes, and power lines in the
area, however the signals are relatively clean.
The profiler was situated such that the trailer partially blocks a main lobe
directed towards the water. The antenna was also orientated to put the
diagonal nulls towards the sea.
Note that this system uses the RX/TX box and the computer from ISS2 because
of the repairs for the noise problem noted in a separate tklog entry.
- 13: DAILY, Site ISS3 (Bahia Kino), Mon 05-Jul-2004 02:09:28 GMT, Daily report for Sun July 4
Daily Report Sun July 4
Weather fine, brisk southerly, high approx 33C.
Low clouds early, clearing during morning.
More humid today, there appears to be a weather change, is the monsoon coming?
Profiler working well, getting winds to 2 - 4 km, rass to about 700m.
Disk 14.1 % full.
Training sonde with the students at 23Z
Last day here for Hal & Charlie (who are going to Los Mochis) and Mike & Bill (to Peurto Penasco).
- 12: INFO, Site ISS3 (Bahia Kino), Mon 05-Jul-2004 00:45:38 GMT, training session
Conducting Bahia Kino training session. Initiated Power Off at approx 530 LST, repowered system at 545 LST...everything fine...
- 11: SOUNDING, Site ISS3 (Bahia Kino), Sun 04-Jul-2004 21:54:58 GMT, Sounding Bahia Kino Sun July 5 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040704
launch time UTC:
Sonde coef tape #:408413210
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.6
Temp C : 31.46
RH % : 66.3
For Surface Data
Pressure mb : 1008.9
Temp C : 31.9
RH% : 67.7
Wind Spd m/s : 6.9
Wind Dir deg : 209
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear, few scattered cirrus, moderate winds.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 77.8
Termination Altitude km : 18
Reason for Termination : balloon burst
Post-Termination Weather Description: Same as before
For Surface Data
Pressure mb : 1007.9
Temp C : 30.139
RH % : 78.963
Wspd m/s : 3.9243
Wdir deg : 236.53
------------------------------------------------------------------------------
COMMENTS Think that we got interference from Hermesillo 0Z radio sonde at about 325mb.
--------
- 10: INFO, Site ISS3 (Bahia Kino), Sun 04-Jul-2004 21:49:02 GMT, training session
Conducting Bahia Kino training session.
- 9: RADAR, Site ISS3 (Bahia Kino), Sun 04-Jul-2004 04:41:26 GMT, Profiler repaired
Replacement parts arrived from Peurto Pensaco.
Replaced interface and rx/tx boxs which did not fix the problem.
Replaced computer and the noise went away, so the problem appears to be with
either the integrator card or the dsp card.
The system then had serious spectral spurs.
Tried increasing the delay and postblanking which helped,
however this wiped out the lowest gates (< 200m) on RASS.
Replaced the new rx/tx with the original and the spurs went away.
Returned delay and blanking to original settings.
Profiler operating normally from about 4:20UT (July 4).
- 8: DAILY, Site ISS3 (Bahia Kino), Sun 04-Jul-2004 04:27:35 GMT, Daily report for Sat July 3
Daily Report Sat July 3
Weather fine, light SW seabreeze. High approx 33C.
Partly cloudy, cirrus. Saw some nice mare's tail clouds.
Profiler - continued to suffer noise problem most of day,
however was repaired and is operating normally from about 0430 UT (July 4).
See separate entry.
Approx 600 sondes arrived today.
Charlie, Heather and Jennifer took approx 140 sondes to meet Gordan and Rebecca
about half way to Peurto Penasco, who brought down profiler replacement parts.
Hal did a training sonde with Nick & Brad.
- 7: SOUNDING, Site ISS3 (Bahia Kino), Sat 03-Jul-2004 22:12:48 GMT, Sounding Launch 3 Jul 2215
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040703
launch time UTC: 2230
Sonde coef tape #: 408413414
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.88
Temp C : 33.05
RH % : 59.7
For Surface Data
Pressure mb : 1009.2
Temp C : 31.699
RH% : 62.554
Wind Spd m/s : 6.2746
Wind Dir deg : 196.38
Pre-Launch 4/8 oktas upper level cirrus coverage
Weather Description Hot with increasing moisture in afternoon
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 110
Termination Altitude km : 18
Reason for Termination : Loss of Signal
Post-Termination Weather Description:
For Surface Data
Pressure mb : 1008.31
Temp C : 31.39
RH % : 64.418
Wspd m/s : 4.2379
Wdir deg : 219.43
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Loss of wind data at 200mb. Reason unknown, possibly interaction with jet stream.
- 6: DAILY, Site ISS3 (Bahia Kino), Sat 03-Jul-2004 01:27:20 GMT, Daily report for Fri July 2
Daily Report Fri July 2
Weather fine and clear, light SW seabreeze. High approx 34C.
Scattered high clouds gradually increasing this afternoon.
Profiler still has the intermittant internal noise problem.
The problem seems to be either in the interface boxes or the integrator & dsp cards in the computer.
Replacement computer and interface boxes have been shipped from Boulder.
The students went to Hermasillo to work on distributing the radiosondes.
- 5: SOFTWARE, Site ISS3 (Bahia Kino), Fri 02-Jul-2004 19:11:20 GMT, fixed ssh port forwarding
For some reason the port forwarding in Winroute for ssh stopped working.
I fooled around with it for a while without luck.
Finally fixed it by removing the entry in Winroute, and reentering.
I noticed that the orginal entry only had tcp slected. When I reenterd the values, I changed this to tcp/udp. I don't think that should have caused the problem, though.
- 4: DAILY, Site ISS3 (Bahia Kino), Fri 02-Jul-2004 01:46:13 GMT, Daily report for Thu July 1
Daily Report Thu July 1
Weather fine and clear, light SW seabreeze. High approx 34C.
Temperature/RH fan replaced about 1730 UT.
Profiler moved about late morning to behind the trailer to get better shielding from clutter from the lagoon.
Profiler also seems to have an intermittant internal noise problem which is being worked on.
Bill and Mike arrived yesterday evening. Lou, Tim, Rebecca, and Gordan moved on to Peurto Penasco. .
- 3: INFO, Site ISS3 (Bahia Kino), Tue 29-Jun-2004 23:56:20 GMT, Its Alive
ISS3 Kino Bay Is alive
- 2: SOUNDING, Site ISS3 (Bahia Kino), Tue 27-Jun-2000 13:01:25 GMT, Sounding Bahia Kino Saturday 10 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
date yymmdd: 040710
launch time UTC: 0z
Sonde coef tape #:408412411
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.6
Temp C : 32.1
RH % : 57
For Surface Data
Pressure mb : 1007.1
Temp C : 32.4
RH% : 53.5
Wind Spd m/s : 6.4
Wind Dir deg : 214
Pre-Launch Note conditions not observable by automatic systems
Weather Description ( Cumulus towers on the horizon to the north and maris tail cirrus to the north.)
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 120.9
Termination Altitude km : 15.534
Reason for Termination : No longer receiving data and no satalites.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1006.2
Temp C : 32.453
RH % : 52.283
Wspd m/s : 5.1493
Wdir deg : 233.06
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------