- 191: INFO, Site , Sun 15-Aug-2004 02:15:39 GMT, Archive computer reboot
Archive computer reboot 15 Aug 2004, 2:14 utc
- 156: INFO, Site ISS2 (Puerto Penasco), Sun 08-Aug-2004 16:27:49 GMT, Roving Team Visit June & Lou.
Saturday Aug 7
An IOP was contiueing
Display Manager backup was made
Meet with operators asked if they had any concerns on operations or equipment
all seemed fine with how things are running
Asked them to shut down all equipment at the end of project.
There is some question at all sites but especially at this site due to the long drive to Hermosillo when is the final launch of the project. An email needs to
sent to all sites covering this issue. Students at Penasco have noon flights out
of Hermosillo on the 16th and a 6 hour drive to get there. Local students could cover last flights if need be.
Sunday Aug 8
Surface met was shutdown from approx 16:50 z to 18:05 z.This was to collect
sample files to observe the t-dome and t-case temperatures on the IR sensor
in an attempt to figure out the spikes in the data.
Profiler was shutdown from 18:40z for approx 1 hour to back up hard drive data.
- 97: INFO, Site ISS2 (Puerto Penasco), Sat 24-Jul-2004 23:52:33 GMT, Coeff's for sondes 420711810 and 420711813
Following are the Coefficients for the following sondes
SONDE # 420711810 # 420711813 (FLIGHT TERMINATED)
PY0 15729 15729
P0 -3163 -2689
P1 12303 10836
P2 -6665 -4025
P3 7513 5598
P4 -1706 -1111
CS -32427 4988
DY0 15729 15729
D0 28 36
D1 -56 -295
D2 -91 646
D3 196 -692
D4 -81 280
CS 20996 1127
SY0 15729 15729
S0 -1335 -1515
S1 -1057 -544
S2 6335 5694
S3 0 0
S4 0 0
CS 16029 29087
TY0 15729 15729
T0 -1754 -1771
T1 2328 2366
T2 597 348
T3 -82 -14
T4 0 0
CS 16078 18533
UY0 364 364
U0 -62 -116
U1 1408 1629
U2 -2329 -2435
U3 0 0
U4 370 370
CS -8676 -18112
- 75: INFO, Site ISS2 (Puerto Penasco), Tue 20-Jul-2004 21:09:10 GMT, Roving Crew Notes for 7/20/04
7/20/04
ISS2 Workstation Data Backup written: OK. Data Only.
- 67: INFO, Site ISS2 (Puerto Penasco), Mon 19-Jul-2004 22:07:13 GMT, Roving crew notes for July 19
We arrived today at ISS-2 Puerto Penasco.
PROFILER BACKUP
See seperate entry. Some problems making this backup, but data backed up
at least once through Day 200.
ISS2 FULL SYSTEM BACKUP without Data.