ISPA-2002: Logbook Entries

ISPA-2002: SOFTWARE Messages: 2 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
103 Sun 24-Feb-2002WORKSTATION HARD DRIVE?SNOWFALL02Mike
64 Mon 11-Feb-2002Comm failure and solution SNOWFALL02Steve


103: SOFTWARE, Site SNOWFALL02, Sun 24-Feb-2002 13:49:19 GMT, WORKSTATION HARD DRIVE?
MAYBE IT'S OKAY, BUT THE WORKSTATION FOR ARMISS HAS A LOT OF NOOISE COMING OUT OF IT SOMETIMES.
64: SOFTWARE, Site SNOWFALL02, Mon 11-Feb-2002 05:19:28 GMT, Comm failure and solution
The ppp link on the sun was failing to dial out because the swap
space (/tmp on the sun) was full. This filled because there were
several IDL jobs which were not exiting properly.
The solution (thanks Gary) was to reboot the sun.
We did this and transferred the last day's data by hand.
Note that the 1299 serial link may timeout during this process
so POP on the 1299 may need to be restarted (not this time).
Can check by looking at the latest data time on the Zebra
Data icon's "last data display".