SGS00: Logbook Entries

SGS00: KH2O Messages: 3 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
45 Mon 11-Sep-2000kh20 fixedmartin
34 Wed 06-Sep-2000voltage on Krypton Hygrometerkleissl
23 Sun 03-Sep-2000clean and swap kryptonparlange


45: KH2O, Site , Mon 11-Sep-2000 15:42:05 PDT, kh20 fixed
Analog cable between the breakout box and the adam 
was plugged into the wrong analog port on the adam.
Once plugged into the port for channels 0-3, the 
kh20 signal came through fine.

This was corrected around 1130 PDT.

Mistake is probably due to the analog connectors
not being labelled on this particular adam. 

34: KH2O, Site , Wed 06-Sep-2000 15:32:59 PDT, voltage on Krypton Hygrometer
measured voltage inside the ADAM next to the profile towers on one card:
ground and pin on channel 1: 10.2 mV +- .5 mV
two capacities at input of channel 1: same
23: KH2O, Site , Sun 03-Sep-2000 11:20:26 PDT, clean and swap krypton
The krypton was cleaned for the first time 9/3/00 at 9:20 am pst.

Around 1745 pdt we swapped s/n 1397 for s/n 1395.  There was no change
in the output (37 gm/kg), so we replaced s/n 1395.  twh