CuPIDO: Logbook Entries

CuPIDO: licor-co2 Messages: 2 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
94 Thu 13-Jul-2006St 5: NaNs in LiCor data5poulos
29 Mon 03-Jul-2006Station 5 LiCor5poulos


94: licor-co2, Site 5, Thu 13-Jul-2006 16:20:29 MDT, St 5: NaNs in LiCor data
During a brief set of data analysis we noted the existance of Nans in the LiCor raw data at regular intervals. This will be investigated further soon.
29: licor-co2, Site 5, Mon 03-Jul-2006 16:05:22 MDT, Station 5 LiCor
The LiCor at Station 5 was found to be offline when the system was restarted during the 3 July station visit. data_stats showed no ttyS7, rserial confirmed no ooutput.

With that a power cycle was initiated to no avail.

Voltage at one end of the port 7 fuse was found to be near nil (blown fuse) and the LiCor began recording when a 3A new fuse was installed that was large enough to handle the startup current.

We believe that no CO2 data has been collected until this visit ~ 11am 3 July.