15-Nov-2001 P25511 JL/RR 23:30 The damaged S-Pol rotary joint was replaced with CHILL's rotary joint. [Clutter filter is to be "ON" for IMPROVE-II] 23:45 Vertical pointing. Looks pretty good. Jon did initial bias removal. 23:55 SUR scans for clutter review. 16-Nov 01:34 End of today's testing.
16-Nov-2001 P25512/13 JL 18:20 Vertical pointing (Good case!) 18:24 Clutter filter "OFF" 18:25 Sequence, clutter filter "OFF" 18:46 Sequence, clutter filter "ON" 19:47 Long-range [test]. [CF "On" from here out] 21:00 Dual polarization scanning with clutter filter -- "Research" sequence. 22:08 STOP 22:10 START 22:30 [Time] approx. RDA crashed. "P" tape stopped. 22:50 All RDA tape drives were cleaned. 23:10 Re-start recording. 17-Nov 00:39 Paused recording.
17-Nov-2001 P25513 RR/JVA 19:20 Started recording. Still writing to tape P25513. 20:35 Transmit powers show 10dB low. No real signal [Tx had faulted, no Tx]. 21:32 Transmitter back on. 22:45 Special clutter scans. 64 hits, 3-deg/sec, elevs: 0.0, 0.3, 0.6, 0.9 Transmitter faulted three times over past ~1.5 hours. 23:53 Back to routine SUR scans. 18-Nov 00:42 Stopped recording.
19-Nov-2001 P25512/13 RR/JVA 17:00 [S-Pol computer network power-down/up tests]
24-Nov-2001 P25xxx JE 19:10 SUR scans [testing, only for the day]
25-Nov-2001 P25xxx JE 18:30 SUR scans [testing, only for the day]
26-Nov-2001 P25514 JE/RR 20:23 Start recording. Wave cloud (?) to WSW with very high Zdr. (Is this correct?) CHAFF drop! 23:43 Loaded modified translator software to RDA-1. Software should correct a "backward time" problem. This will be reviewed.
27-Nov-2001 P25515 JE/RR 17:55 Start. Stoelinga scan tests and Susan's Web testing. No real weather. 28-Nov 01:00 Time uncertain, but RDA-1 re-booted [itself; should really say RDA-2 in this entry]. Some data not recorded to P-tape. 01:38 Re-started tapes 02:15 (Time is approximate) RDA-2 re-booted, again. We lowered van thermostat to 72, and moved RDA closer to the vent. Q-tape was over-written. Data started on RDA-2 at about 02:20.
28-Nov-2001 P25516/17 AP 08:27 Running research [scan] sequence.
29-Nov-2001 P25518/19/20 AP 13:05 Running research [scan] sequence. 30-Nov 00:42 Tapes paused. Tape P25520 and Q25520 paused at 0042 on 30 Nov (see next page)[next entry]
30-Nov-2001 P25520/21 AP/RR 00:42 Tapes Paused. Tape P25520 and Q25520 paused at 0042 on 30 Nov Re-started 30-Nov at 1452 (only P-tapes running; could not get Q-tape to run). 14:52 Started radar. 21:00 Vertical scans. Pretty Shallow. 22:02 Vertical scans. 01-Dec 01:32 Tape ping-pong.
01-Dec-2001 P25522/23 AP 13:45 Running research sequence.
02-Dec-2001 P25524 ?? xx:xx [no log entries for this day]
03-Dec-2001 P25525/26 DF 00:45 Began unattended ops. 19:48 Chaff line 60 km west 23:09 Solar calibration.
04-Dec-2001 P25527/28/29 DF 00:24 Began research sequence, unattended ops. 04:20 Horizontal USWR Fault [DF came in to re-set transmitter] 18:06 Vertical scans 18:14 Done with vertical 18:51 Had to fix H semi-rigid cable [Al Phinney?]
05-Dec-2001 P25530 JE xx:xx Began unattended ops 17:17 Recording paused. System stopped for maintenance. Expect to be down for about 3 hours. Did solar. Adjusted azimuth CCW 0.15 deg. Moved thumbwheel switches from -120.15 to -120.30 19:35 Started clutter scans for Bob Rilling 19:48 Re-started clutter scans, [elevations of] .25 to 3.0 in .25 degree steps. No transmitter. [Transmitter "off", as requested]. 20:16 Started research sequence, IMP2_EW.scn 21:10 [Another chaff drop noted, 20:38 to 22:00]
06-Dec-2001 P25531/32/33/34 JE 18:14 Running research sequence. 07-Dec 17:26 End operations.
08-Dec-2001 P25535 AP 13:13 Started ops running long-range SUR 14:45 Switched to short [range scans], Research IMP2_EW.SCN 16:15 Switched back to long-range. 19:18 Changed to SUR scans, no RHIs. [Long-range] 19:35 Changed to short-range 19:40 Start short-range research sequence, IMP2_EW.SCN
09-Dec-2001 P25536/37 JE 08:45 Unattended ops 17:00 Found that test pulse range had not been set when changing from long-range to short-range. 18:00 Shutdown ops for now.
10-Dec-2001 P25538/39 AP 04:40 Started ops running research scan
11-Dec-2001 P25540/41 Unattended ops 17:46 Vertical pointing 17:55 Stopped vertical scan; started research scan
12-Dec-2001 P25542/43 00:42 Unattended ops 16:55 Transmitter off 17:10 Restart [transmitter] 17:55 Ran vertical pointing 19:30 Long-range mode 20:12 Back to short range 20:48 Began long-range scans Short range 21:05 Changed Zdr_FUDGE_FACTOR from 0.15 to -0.09 (reduced by .24 dB) 21:06 Vertical pointing mode, short range 21:12 End vertical, start research sequence, short range 21:47 Start long range 22:05 Start short range. Change CONFIG.RDR Zdr from 0 to -0.24. Test pulse Zdr now -0.80
13-Dec-2001 P25544/45/46 20:37 Started vertical pointing 20:44 Restarted research sequence
14-Dec-2001 P25546/47/48 19:07 Changed to SUR scans, still short-range 20:10 Changed to DPol.srv and added 0.0 and 3.5 deg elevation [tilts]. Since long-range SUR was not going to Zebra. 22:22 Change to research scans.
15-Dec-2001 P25549/50 17:35 Change to long-range SUR, only. 19:21 Changed to short range 23:45 Cleaned Q-0 and P-1 tape drives
16-Dec-2001 P25551/52 05:19 Cleaned Q-1 and P-0 tape drives. 21:17 Changed RHI angles to start from 60 and go to 240 17-Dec 01:15 Ran vertical pointing scan 04:25 Antenna pedestal stopped -- high wind tripped breaker
17-Dec-2001 P25553/54 20:42 Began long range SUR 22:50 End ops.
18-Dec-2001 P25555/56 17:00 Receiver H/V switch was left in H-only overnight
19-Dec-2001 P25557/58 xx:xx 16:10 to 17:10, Possible data loss on 25558 tapes. -- both [tape] drives full upon arrival in morning [Post review note: RDA disk caching seems to have worked as intended, resulting in no data loss.] 22:58 Ran vertical pointing.
20-Dec-2001 P25559/60 20:15 End ops
21-Dec-2001 P25561 19:01 Clutter scan, no transmit. 19:39 Clutter scan, with transmitter "ON" 19:58 Turned off clutter filter. 20:19 End clutter scan 02:28 Started ops
22-Dec-2001 P25562 14:21 Running research sequence, IMP2_EW.SCN 15:25 Ran vertical 15:33 End vertical 22:05 End IMPROVE-II ops.
*** END-OF-PROJECT ***
| Initials | Name |
|---|---|
| SE | Scott Ellis |
| JE | Jonathan Emmett |
| DF | Don Ferraro |
| TL | Tashi Lama |
| JL | Jon Lutz |
| AP | Al Phinney |
| RR | Bob Rilling |
| MS | Mike Strong |
| JVA | Joe VanAndel |