Project #2000-143 TOPSE

Tropospheric Ozone Production about the Spring Equinox

Elliot Atlas, et al.

NSF/NCAR EC-130Q Hercules (N130AR)

Research Flight Report

 

Aircraft: N130AR Date: 5 March 2000 J/D:  
Project No.: 2000-143 Title: TOPSE (Depl. #3) Flight No.: RF08A Data Type:  
Pilot: Heiting Co-Pilot: Genzlinger F/E: Cusack P/M: Schanot
Observer(s):       P/I: Atlas

  Tape
No.
Start
Time
End
Time
Elapsed
Time
Comments
1. R1448 14:06:08 21:51:50 7:45:43       
2.        :   :       :   :                 
3.        :   :       :   :                 
4.        :   :       :   :                 

Input Tape Discrepancies:

Tape only partial flight
Data gaps from ADS timing errors.
Multiple (7) files from hard disk.

 

Calibration Maneuvers
  Start End
Rvrs. Hdg.    :   :       :   :   
Pitch    :   :       :   :   
Yaw    :   :       :   :   
Speed Var.    :   :       :   :   
Block Out 14:51
Block In 18:02
Flight Hours W/Tenths 3.2

 

 

 

 

 

 

Departure Ramp Coordinates ID
N 39° 54.8' E 105° 07.1' BJC
S W
Destination Ramp Coordinates ID
N 49° 54.0' E 97° 13.8' CYWG
S W

 

 

 

Mode Time
Align 14:02
Ready Nav 14:06
Nav 14:36
Off 21:52
Time in Nav 7.3
IRU Serial No. Nav IRU Destination Readout
176 N 58° 45.7' E 94° 07.0'
S W
IRU Serial No. Res IRU Destination Readout
  N    °   ' E    °   '
S W

 

 

 

 

 

 

Alignment True Hdg. Nav Terminal Error Nav Position Error
° N 0.9' E 2.7' 0.23
(NM/Hr)
S W
Alignment True Hdg. Res Terminal Error Res Position Error
° N ' E '
(NM/Hr)
S W