T-28 Pilot Report
Flight:
802
Date:
030523
Flight Time:
1.6
Pilot:
Tom Warner
Controller:
Andy Detwiler
Location:
Norman, OK (KOUN)
Mission:
Research
Computer Time |
Video Time |
Comments |
|
152120 |
Start |
|
2535 |
Taxi |
|
2835 |
Time check video is +1
second from computer display and actual time |
|
3130 |
Takeoff |
|
3310 |
Instruments on |
|
3800 |
Liquid precip on video
window |
|
3935 |
Out of cloud |
|
4033 |
Right turn to 300 |
|
4450 |
Right turn to 030 |
4530 |
|
FM on, 10,300 MSL |
4600 |
|
FM off |
|
5302 |
High blower |
|
5440 |
080 / 17,000 MSL |
|
5508 |
In cloud |
|
5529 |
Flash |
|
5623 |
P-static stop |
|
5643 |
P-static |
|
5656 |
P-static stop |
|
5718 |
Snow or ice crystals
visible outside |
|
5740 |
P-static |
|
160010 |
P-static |
|
0038 |
Out of cloud |
|
0123 |
260 / 17,000 MSL, in cloud |
|
0140 |
P-static |
|
0301 |
Flash |
|
0334 |
280 |
|
0410 |
P-static |
0603 |
|
Out of cloud, end p-static |
|
0724 |
In cloud, 280 |
|
0742 |
P-static |
|
0810 |
Possible p-static discharge |
|
0817 |
End p-static |
|
0848 |
Possible flash |
|
0950 |
Right turn to 120 |
|
1003 |
P-static |
|
1010 |
Light turbulence |
|
1015 |
P-static |
|
1138 |
End p-static |
|
1204 |
P-static |
|
1246 |
End p-static |
|
1304 |
P-static |
|
1325 |
End p-static |
|
1451 |
NO test on |
|
1425 |
NO test off |
|
1540 |
Right turn to heading 300 |
|
1946 |
P-static |
|
2021 |
End p-static |
|
2050 |
Possible flash |
|
2058 |
P-static |
|
2240 |
End p-static |
2258 |
|
Light turbulence |
|
2354 |
Out of cloud |
|
2456 |
NO test on |
|
2528 |
NO test off |
|
2720 |
Begin recovery to Norman |
|
2837 |
Low blower |
|
3310 |
Report radio problem to
Oklahoma City approach (lots of static) |
|
3518 |
Approach directs 170
heading |
|
3536 |
Report radio problem to
Westheimer tower |
|
4246 |
Landing |
NOTES
Weather
-
A dissipating MCS
moved through the northeast quadrant of the domain
-
At 17,000 MSL,
light clouds with ice particles and frequent p-static
Maintenance
-
Oil temp ran at
100 C
-
Left helmet earphone failed during descent,
repaired
-
Intercom wire
loose, repaired
Operations
-
Good coordination
between Ops and Thor
-
Radio was
occasionally scratchy in the northeast quadrant