PI Information
PI Name: Brigitte Baeuerle for all ATD personnel located at Norman
and Oklahoma City
Mailing Address: NCAR/ATD
P.O. Box 3000
Boulder, CO 80307
E-mail: baeuerle@ucar.edu
Phone(Voice): 303 497 2061
Fax: 303 497 8770
Co-PIs:  

Norman Operations Center Space Issues
People from your group coming to Norman Operations Center: Susan Stringer (ELDORA)
Michael Bell (ELDORA)
Bob Rilling (ELDORA)
Gary Granger (ELDORA)
Dick Oye (ELDORA)
Wen-Chau Lee (ELDORA)
Fleur Couvreau (ATD SCIENCE)
Crystal Pettet (ATD SCIENCE)
David Parsons (PI)
Tammy Weckwerth (PI)
Brigitte Baeuerle (PROJECT OFFICE)
Melinda Tignor (PROJECT OFFICE, ADMIN SUPPORT)
Mary Ann Pykkonen (ADMIN SUPPORT)
Holly Filkins (ADMIN SUPPORT)
Jeff Keeler (LEANDRE)
Bruce Morley (LEANDRE)
Largest number at one time?: 12
Other students/volunteers available for IHOP?: none
Approximate Office/air-conditioned Space needed: ELDORA: approx 130 sqft for 5 people, preferably in the NWS analysis room, co-located with Wakimoto
ATD Science Support: 100 sqft, co-located with CNRS group in analysis center
ATD IHOP Support: 100 sqft in overflow trailer (incl. fax,
printer and copier space)
Approximate Office/non air-conditioned Space needed: none
Approximate Lab/air-conditioned Space needed: none
Approximate Lab/non air-conditioned Space needed: none
Approximate Storage/air-conditioned Space needed: none
Approximate Storage/non air-conditioned Space needed: 40 sqft for boxes
Special requirements for lab space : n/a
24 hour access to office/lab? yes
Onsite power- Watts needed: ELDORA: 3 kW
Other: 600 - 1000 W
Onsite power- Voltage needed: 110/120
Onsite power- Hertz needed: 60Hz
Onsite power- Amperage needed: ELDORA: 30 AMPS
other: approx 8 AMPS
Comments with regard to onsite power: ELDORA will bring own UPS for ELDORA workstations

Oklahoma City Operations Center Space Issues
People from your group coming to Oklahoma City Operations Center: Kurt Zrubek
Larry Murphy
Dick Friesen
Eric Loew
Frank Pratte
Aditi Kapoor
Grant Gray
Mike Strong
Jonathan Emmett
Tim Lim
Tim Rucker
Janet Ansett
Mike Spowart
Theresa Campos
David Rogers
Eric Loew
Largest number at one time?: RAF: 7 first 10 days, 2 after that
RTF: 6 - 8 at all times
Other students/volunteers available for IHOP?: none
Approximate Office/air-conditioned Space needed: ELDORA: 100 sqft
RAF: 50 sqft
Approximate Office/non air-conditioned Space needed:  
Approximate Lab/air-conditioned Space needed: ELDORA: 1 workbench (6 x 4 ft)
RAF: 2 workbenches, one of these for TDL pump
Approximate Lab/non air-conditioned Space needed: none
Approximate Storage/air-conditioned Space needed: none
Approximate Storage/non air-conditioned Space needed: ELDORA: 80 sqft for boxes etc.
RAF: 100 sqft
sondes: 30 spft
Special requirements for lab space : access to Nitrogen, may need access to large fork lift
ground power and air conditioner
RTF will bring own workbench and tables
24 hour access to office/lab? yes
Onsite power- Watts needed: ELDORA: 3300 Watts
RAF: 1725 Watts
Onsite power- Voltage needed: ELDORA: 110
RAF: 115 (2 to 3 line services)
Onsite power- Hertz needed: 60 Hz
Onsite power- Amperage needed: ELDORA: 25 Amps
RAF: 15 Amps
Comments with regard to onsite power:  

SPol Region Space Issues
People from your group coming to SPol Region: taken care of by our people
Largest number at one time?:  
Other students/volunteers available for IHOP?:  
Approximate Office/air-conditioned Space needed:  
Approximate Office/non air-conditioned Space needed:  
Approximate Lab/air-conditioned Space needed:  
Approximate Lab/non air-conditioned Space needed:  
Approximate Storage/air-conditioned Space needed:  
Approximate Storage/non air-conditioned Space needed:  
Special requirements for lab space :  
24 hour access to office/lab?  
Onsite power- Watts needed:  
Onsite power- Voltage needed:  
Onsite power- Hertz needed:  
Onsite power- Amperage needed:  
Comments with regard to onsite power:  

Norman Operations Computer Support
# Unix/Linux computers you will be bringing: ELDORA: 5
Other: 1 or 2
# Windows 95/98/2000 computers you will be bringing: ELDORA: 2
Other: at least 5
# Mac OS computers you will be bringing: none
Number of other computers you are bringing and the operating system type : n/a
Number of computers to be connected to the LAN at the Operations Center: ELDORA: need only one port because all 7 will be connected through an ATD bridging machine
Other: all of them
Access to your computers from outside the Operations Center? ELDORA: yes
Desired access method for reaching your computer: ELDORA: Secure shell and some ftp needs

Oklahoma City Operations Computer Support
# Unix/Linux computers you will be bringing: ELDORA: 1 workstation (Linux)
# Windows 95/98/2000 computers you will be bringing: ELDORA: 1 laptop
RAF: 2 to 4 laptops
Dropsonde: 1
# Mac OS computers you will be bringing: none
Number of other computers you are bringing and the operating system type : none
Number of computers to be connected to the LAN at the Operations Center: up to six
Access to your computers from outside the Operations Center? no
Desired access method for reaching your computer:  

SPol Region Computer Support
# Unix/Linux computers you will be bringing: taken care of by our people
# Windows 95/98/2000 computers you will be bringing:  
# Mac OS computers you will be bringing:  
Number of other computers you are bringing and the operating system type :  
Number of computers to be connected to the LAN at the Operations Center:  
Access to your computers from outside the Operations Center?  
Desired access method for reaching your computer:  

Lodging and Other Needs
Type of lodging you need: taken care of
Lodging location, number of units, and time frames:taken care of
Number of rental cars: taken care of
Please give comments questions or other needs not specified above here: