PI Name: | William Brown (et al) |
---|---|
Mailing Address: | NCAR/ATD PO Box 3000 Boulder CO 80307 |
E-mail: | wbrown@ucar.edu |
Phone(Voice): | 1-303-497-8774 |
Fax: | 1-303-497-8770 |
Co-PIs: | Dave Parsons, Steve Cohn, Tian Yu, James Pinto |
People from your group coming to Norman Operations Center: | |
---|---|
Largest number at one time?: | |
Other students/volunteers available for IHOP?: | |
Approximate Office/air-conditioned Space needed: | |
Approximate Office/non air-conditioned Space needed: | |
Approximate Lab/air-conditioned Space needed: | |
Approximate Lab/non air-conditioned Space needed: | |
Approximate Storage/air-conditioned Space needed: | |
Approximate Storage/non air-conditioned Space needed: | |
Special requirements for lab space : | |
24 hour access to office/lab? | |
Onsite power- Watts needed: | |
Onsite power- Voltage needed: | |
Onsite power- Hertz needed: | |
Onsite power- Amperage needed: | |
Comments with regard to onsite power: |
People from your group coming to Oklahoma City Operations Center: | |
---|---|
Largest number at one time?: | |
Other students/volunteers available for IHOP?: | |
Approximate Office/air-conditioned Space needed: | |
Approximate Office/non air-conditioned Space needed: | |
Approximate Lab/air-conditioned Space needed: | |
Approximate Lab/non air-conditioned Space needed: | |
Approximate Storage/air-conditioned Space needed: | |
Approximate Storage/non air-conditioned Space needed: | |
Special requirements for lab space : | |
24 hour access to office/lab? | |
Onsite power- Watts needed: | |
Onsite power- Voltage needed: | |
Onsite power- Hertz needed: | |
Onsite power- Amperage needed: | |
Comments with regard to onsite power: |
People from your group coming to SPol Region: | William Brown, Tian Yu, James Pinto, Steve Cohn Mike Susedik, Charlie Martin. Dates TBD. Will be at at AUX Site approx 17 km east of S-Pol. |
---|---|
Largest number at one time?: | Will have 4 for setup (May 7-13), then 1-2 for ops, then 4 for teardown (June 25 - Jul 1) |
Other students/volunteers available for IHOP?: | |
Approximate Office/air-conditioned Space needed: | 1 or 2 people will occasionally visit S-Pol and may request desk space (say 15 sq ft a few hours/week). |
Approximate Office/non air-conditioned Space needed: | |
Approximate Lab/air-conditioned Space needed: | |
Approximate Lab/non air-conditioned Space needed: | |
Approximate Storage/air-conditioned Space needed: | |
Approximate Storage/non air-conditioned Space needed: | 200 sq ft |
Special requirements for lab space : | |
24 hour access to office/lab? | No |
Onsite power- Watts needed: | |
Onsite power- Voltage needed: | |
Onsite power- Hertz needed: | |
Onsite power- Amperage needed: | |
Comments with regard to onsite power: | (Specs directly to site manager) |
# Unix/Linux computers you will be bringing: | |
---|---|
# Windows 95/98/2000 computers you will be bringing: | |
# Mac OS computers you will be bringing: | |
Number of other computers you are bringing and the operating system type : | |
Number of computers to be connected to the LAN at the Operations Center: | |
Access to your computers from outside the Operations Center? | |
Desired access method for reaching your computer: |
# Unix/Linux computers you will be bringing: | |
---|---|
# Windows 95/98/2000 computers you will be bringing: | |
# Mac OS computers you will be bringing: | |
Number of other computers you are bringing and the operating system type : | |
Number of computers to be connected to the LAN at the Operations Center: | |
Access to your computers from outside the Operations Center? | |
Desired access method for reaching your computer: |
# Unix/Linux computers you will be bringing: | |
---|---|
# Windows 95/98/2000 computers you will be bringing: | Occasional visitor to S-Pol will bring laptop |
# Mac OS computers you will be bringing: | |
Number of other computers you are bringing and the operating system type : | |
Number of computers to be connected to the LAN at the Operations Center: | Occasional use of 1 data port (DHCP) |
Access to your computers from outside the Operations Center? | |
Desired access method for reaching your computer: |
Type of lodging you need: | Hotel rooms and/or apartments |
---|---|
Lodging location, number of units, and time frames: | Liberal KS 4 hotel rooms for setup (May 7 - 13) 1 or 2 hotel rooms or an apartment for ops (May 13 - June 25) 4 hotel rooms for teardown (Jun 25 - Jul 1) |
Number of rental cars: | 1 rental |
Please give comments questions or other needs not specified above here: | Note this group will be based at the Aux site about 17 km east of S-Pol |