PI Information
PI Name: Dr. William L. Smith - NAST Program Manager
Mailing Address: NASA Langley Research Center
MS 401
HAmpton, Virginia 23681-2199
E-mail: bill.l.smith@larc.nasa.gov
Phone(Voice): 757-864-5914
Fax:  
Co-PIs: Dr. Allen M. Lara

Norman Operations Center Space Issues
People from your group coming to Norman Operations Center:  
Largest number at one time?:  
Other students/volunteers available for IHOP?:  
Approximate Office/air-conditioned Space needed:  
Approximate Office/non air-conditioned Space needed:  
Approximate Lab/air-conditioned Space needed:  
Approximate Lab/non air-conditioned Space needed:  
Approximate Storage/air-conditioned Space needed:  
Approximate Storage/non air-conditioned Space needed:  
Special requirements for lab space :  
24 hour access to office/lab?  
Onsite power- Watts needed:  
Onsite power- Voltage needed:  
Onsite power- Hertz needed:  
Onsite power- Amperage needed:  
Comments with regard to onsite power:  

Oklahoma City Operations Center Space Issues
People from your group coming to Oklahoma City Operations Center: Allen C. Royal May 22-June 13
Anna M. Noe May 22-May 24 and June 7-June 13
Bill Cook May 24-May 29
Donald Oliver May 29-June 6
Dr. William Smith May 25-June 3
Dr. Allen Larar June 2-June 13
Dr. Dan Zhou May 29-June 5
Mike Alsbury (SCI/Proteus) May 25-June 14
Peter Siebold (SCI/Proteus) May 25-June 14
2 SCI Ground Crewmen May 25-June 14
3 MIT people May 25-June 13
2 Univ of Wisconsin people May 25-June 13
2 Univ of Columbia people May 25-june 13
Largest number at one time?: 16
Other students/volunteers available for IHOP?:  
Approximate Office/air-conditioned Space needed: 800
Approximate Office/non air-conditioned Space needed:  
Approximate Lab/air-conditioned Space needed: 300
Approximate Lab/non air-conditioned Space needed:  
Approximate Storage/air-conditioned Space needed:  
Approximate Storage/non air-conditioned Space needed: 300
Special requirements for lab space : Compressed gas bottle storage for 4-cylinders
24 hour access to office/lab? Yes
Onsite power- Watts needed:  
Onsite power- Voltage needed: 208v ac single phase 60 cycle in the hangar near Proteus
Onsite power- Hertz needed:  
Onsite power- Amperage needed:  
Comments with regard to onsite power: For more information, please contact Don Oliver 757-864-7684

SPol Region Space Issues
People from your group coming to SPol Region:  
Largest number at one time?:  
Other students/volunteers available for IHOP?:  
Approximate Office/air-conditioned Space needed:  
Approximate Office/non air-conditioned Space needed:  
Approximate Lab/air-conditioned Space needed:  
Approximate Lab/non air-conditioned Space needed:  
Approximate Storage/air-conditioned Space needed:  
Approximate Storage/non air-conditioned Space needed:  
Special requirements for lab space :  
24 hour access to office/lab?  
Onsite power- Watts needed:  
Onsite power- Voltage needed:  
Onsite power- Hertz needed:  
Onsite power- Amperage needed:  
Comments with regard to onsite power:  

Norman Operations Computer Support
# Unix/Linux computers you will be bringing:  
# Windows 95/98/2000 computers you will be bringing:  
# Mac OS computers you will be bringing:  
Number of other computers you are bringing and the operating system type :  
Number of computers to be connected to the LAN at the Operations Center:  
Access to your computers from outside the Operations Center?  
Desired access method for reaching your computer:  

Oklahoma City Operations Computer Support
# Unix/Linux computers you will be bringing: 2
# Windows 95/98/2000 computers you will be bringing: 15
# Mac OS computers you will be bringing:  
Number of other computers you are bringing and the operating system type :  
Number of computers to be connected to the LAN at the Operations Center: 16
Access to your computers from outside the Operations Center? noNAST Team members
Desired access method for reaching your computer:  

SPol Region Computer Support
# Unix/Linux computers you will be bringing:  
# Windows 95/98/2000 computers you will be bringing:  
# Mac OS computers you will be bringing:  
Number of other computers you are bringing and the operating system type :  
Number of computers to be connected to the LAN at the Operations Center:  
Access to your computers from outside the Operations Center?  
Desired access method for reaching your computer:  

Lodging and Other Needs
Type of lodging you need: NAST team members will take care of their lodging,
but if you are getting a good deal somewhere,
please let us know
Lodging location, number of units, and time frames: 
Number of rental cars: NAST team members will take care of their rental cars
Please give comments questions or other needs not specified above here: Approximately 500 square feet of space needed near Proteus
as a work area