Power Needs at Norman Operations Center

Respondent Watts Volts Hertz Amps
David Kingsmill Enough for 1 Sun and 1 PC each with monitor and peripherals 110 should work    
Ed Browell ~200 120 60 2
Ming Xue Enough for 1 portable computer      
Mike Daniels 1200 110 60 ~5
Wakimoto 785 (per workstation) Don't know Up to 83 Don't know
Baeuerle ELDORA: 3 kW
Other: 600 - 1000 W
110/120 60 ELDORA: 30 AMPS
other: approx 8 AMPS
Koch 125 V AC (just for computers)      
Flamant   monophased 220v 50 16 or 32

Power Needs at OKC

Respondent Watts Volts Hertz Amps
Ed Browell 2000 120 60 10
Flamant   monophased 220v 50 16 or 32
Ehret 5000 220 50/60  
Baeuerle ELDORA: 3300 Watts
RAF: 1725 Watts
ELDORA: 110
RAF: 115 (2 to 3 line services)
60 ELDORA: 25 Amps
RAF: 15 Amps
Wulfmeyer 1kW 110 60  

Power Needs at S-Pol Region

Respondent Watts Volts Hertz Amps
Knupp At S-Pol: up to 2500 W
At MIPS site within 3 mi of S-POL: 3000 W
120 60 25 at S-Pol
30 at MIPS
Schwemmer 5000 (for HARLIE trailer) 115 60 40
Fabry 100? 110 ok 50-60 1
Whiteman Max avg power requirement 50 kW 3 phase 208 60 100 per phase
Anagnostou 3600 110/240 3 phase 60 15
Gentry 15-20kW 3 phase 208 60 30 per phase
Wurman 6000 120 60 50

Continue to Additional Comments on Power Needs