RBA Notes 11-05-18 -> 5/19 site visit to swap cal gases. met logger data ingest not working (suspect port/hardware problem). (SpB). 10-11-23 Beth Holland checks on RBA aircoa (UPS problem). restores power, reboots aircoa, and all works again 10-11-11 data stop coming into urquell.colorado.edu (SpB) 10-05-31 rebooted aircoa and established rsync data transfer (initiated at RBA aircoa). 09-11-20 -> 10-03-06 Site visit in Nov, aircoa data collected, shuts down in March for some unkown reason (SpB). 07-11-22 -> 08-5-20 Data missing: Site inaccessible due to snow. Memory stick became full. 07-10-23 -> 07-10-25 AIRCOA I installed. Verizon phone card/Junxion box could not establish communciations. Line 1 Ht. = 3.7 m Line 2 Ht. = 14.3 m Line 3 Ht. = 22.0 m All 3 lines run parallel into building from base of tower approximately 10 m.