N2 loop: 1/30/0/<60 starting at 13:01 Connected CB10141 (slated to be O2 Secondary, diptubed and filled to 200 psi with TRANFAC) to CGA. Start at 13:43 Start another loop at 14:26 N2 loop starting at 15:08