Measured P on CB10260 -- 194 psi Connected CB10260 (slated to be O2 Secondary, diptubed and filled to 200 psi withTRANSFAC)to CGA/ballvalve Started 1/30/0/<60 loop on N2 @ 13:40 Started1/30/0/<60 loop on CB10260 @ 14:21 Another loop @ 15:44 Back to N2 @ 16:34 Meeco ppm H2O readings vs. .vbp ppm readings: Time Meeco .vbp 13:XX 0.3 0.142 14:20 0.1 -0.248 14:23 2.1 0.687 14:47 2.1 1.90 15:44 0.1 -0.020 16:34 0.2 0.006