USE DATA FROM PERIOD: 92.66 367.000 CYLINDER POSITIONS (UNKNOWN=0, CO2 AND O2 KNOWN=1, CO2 ONLY KNOWN=2, DO NOT USE=8, EMPTY=9): 1 0 2 1 3 0 4 1 5 0 6 1 7 0 8 1 9 0 10 0 11 1 12 0 13 9 NOTES: Unknowns Pos ID Description 1 JJ8852 Used NWR HS2 3 JJ21174 Used FEF HS2 5 JJ8578 Used SPL HS1 7 JJ9020 Used SPL LS1 9 JJ482 Used NWR LS1 10 JJ12502 Used FEF LS1 12 JJ8485 Used SPL LS2 Knowns Pos ID CO2 O2 Description 2 CA07280 NA NA CO2 Secondary 4 CA07288 NA NA CO2 Secondary 6 CA07299 NA NA CO2 Secondary 8 CA07260 NA NA CO2 Secondary 11 CA07276 NA NA CO2 Secondary Working Tank CC40075 - Spent cylinders from FEF, NWR and SPL vs. CO2 Secondaries - Replaced O2 amplifier compartment door during 1st run of position 4 cylinder - Position 7 cylinder pressure at < 3 psi at end of run - O2 noise high, Span phase lead was ~ 2 - increased o2co to 10 - All RACCOON cylinders had very low pressure and several drifted significantly. Running as 'z' to exclude from use.