USE DATA FROM PERIOD: 73.00 367.000 CYLINDER POSITIONS (UNKNOWN=0, CO2 AND O2 KNOWN=1, CO2 ONLY KNOWN=2, DO NOT USE=8, EMPTY=9): 1 0 2 1 3 0 4 1 5 0 6 0 7 1 8 0 9 1 10 0 11 1 12 9 13 0 NOTES: - Run of 5 secondaries vs. 4 drained SPL Cal cylinders, 2 RACCOON LTs and one of Teresa's modules - All cylinders in blue box and pressurized for ~ 4 days - TCMOD1 is out of the blue box, connnected and pressurized for ~7 days. Pressure went from 500 psig to < 200 psig, but still off pin. Unknowns Pos ID Description 1 JJ1378 SPL LS2 3 JJ1348 SPL LS1 5 JJ8510 RACCOON LT 6 JJ23832 RACCOON LT 8 JJ8174 SPL HS1 10 JJ13615 SPL HS2 12 EMPTY 13 TCMOD1 C130 Module 1 Knowns Pos ID CO2 O2 Description 2 CC129271 347.04 -84.3 BB Secondary 4 CC129281 371.9 -251.5 BB Secondary 7 CC129295 380.55 -282.3 BB Secondary 9 CC129307 405.97 -431.7 BB Secondary 11 CC129293 482.83 -805.8 BB Secondary Working Tank CC12627 - NA -