USE DATA FROM PERIOD: 362.659 365.00 CYLINDER POSITIONS (UNKNOWN=0, CO2 AND O2 KNOWN=1, CO2 ONLY KNOWN=2, DON'T USE=8, EMPTY=9): 1 1 2 0 3 1 4 0 5 0 6 1 7 0 8 0 9 1 10 0 11 2 12 0 13 9 NOTES: Unknowns pos ID description 2 JJ8174 AIRCOA CME cylinder 4 JJ13623 AIRCOA CME cylinder 5 FA02360 AIRCOA CME rotator 7 JJ13615 AIRCOA CME cylinder 8 JJ16901 AIRCOA CME cylinder 10 JJ8550 AIRCOA CME cylinder 11 ND12795 LEF LT (CO2 used as known) 12 JJ8588 AIRCOA CME cylinder Knowns pos ID CO2 O2 description 1 CC129271 347.010 -91.70 BB Secondary 3 CC129281 371.880 -262.50 BB Secondary 6 CC129307 405.970 -438.50 BB Secondary 9 CC129293 482.790 -808.60 BB Secondary 11 ND12795 388.890 NA LEF LT - O2 operational, but not fully tested - further checking of rollover, swapped WT and SP lines coming out of blue box controller to see if dead volumes on SP lines were the problem - rollover possibly slightly better - rollover is still bad (~0.04 ppm/min vs. ~0.01 ppm/min) relative to July and October runs