CSU Continuous Flow Diffusion Chamber
in Wyoming King Air Instrument Racks

file: CFD\Hardware\Rack_Wyo.xls November 4, 1998
see drawing of racks in Wyoming King Air.
CG height reference to base of rack
        Face    
    Location Wt. Height CG Height Moment
COMPONENT   Rack A or B lbs inches inches inch-lbs
1 Base plate, rack A A - base 3   2 6
2 Air Pump #1 (CFD) A - base 15 7.0 6 90
3 Flow Panel A - middle 5 10.0 27 135
4 Air Ballast Tanks A - middle 5   28 140
5 Tray (CFD) A - tray 4   11 44
6 Air Pump #2 (CN) A - tray 7 8.0 13 91
7 CN Counter A - tray 13 8.0 14 182
8 CFD Chamber + OPC + Collector A - tray 35 7.0 27 945
9 Base plate, rack B B - base 3   2 6
10 Icing Water Pump B - base 6   5 30
11 Icing Water Tank B - base 10   6 60
12 Refrigeration Compressor B - base 59 15.0 7 413
13 Keyboard B - middle 4 1.8 17 68
14 Electrical Power Relay Box B - middle 13 3.5 19 247
15 Electrical Signal Box B - middle 5 3.5 23 115
16 Tray (computer) B - upper 4   26 104
17 Electrical UPS B - upper 14 6.0 29 406
18 Computer Monitor B - upper 15 11.0 30 450
19 Data System Computer B - upper 20 13.0 32 640
  TOTAL   240     4172

Last Updated on 4-Nov-98