plows-iss1: Logbook Entries

plows-iss1: SURFACE Messages: 1 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
40 Wed 03-Feb-2010WXT SwapMISSJen


40: SURFACE, Site MISS, Wed 03-Feb-2010 19:20:10 GMT, WXT Swap
WXT lost wind speeds during IOP 15. After IOP replaced WXT with spare unit. Upon completion of the hardware swap, Gary updated the program to accept the data strings from the new WXT. WXT is now fully operational.