The S-Pol phase of NAME2004 ran from early July through 25-Aug-2004. It was intended to run S-Pol "24/7", with some very limited downtime allowed for testing of the new Ka-band radar system. Full details of the ops periods, with downtime, will be developed.
Slow clutter/clutter:
040705202333 040705205249 040710172117 040710180711 040805150822 040805155957
Vertical pointing:
07/11/2004 08:27:28.556 to 07/11/2004 08:29:51 07/19/2004 03:16:01.008 to 07/19/2004 03:16:28 07/21/2004 04:26:20.265 to 07/21/2004 04:32:18 07/27/2004 20:41:56.363 to 07/27/2004 20:44:19 08/03/2004 17:31:06.990 to 08/03/2004 17:33:29 08/05/2004 23:05:01.842 to 08/05/2004 23:06:13 08/16/2004 01:14:19.812 to 08/16/2004 01:16:39
Solar pointing (for dual-pol and dual frequency beam alignment):
2004-Jul-22 15:05:34 to 2004-Jul-22 15:14:07 2004-Jul-24 15:29:51 to 2004-Jul-24 15:36:07 2004-Jul-28 16:00:13 to 2004-Jul-28 16:05:20 2004-Jul-30 15:50:41 to 2004-Jul-30 15:58:19 2004-Jul-31 16:12:27 to 2004-Jul-31 16:16:13 2004-Aug-01 15:22:59 to 2004-Aug-01 15:42:11 2004-Aug-05 15:47:41 to 2004-Aug-05 15:52:22 2004-Aug-07 16:08:45 to 2004-Aug-07 16:16:33 2004-Aug-18 15:16:44 to 2004-Aug-18 15:56:47
Solar Calibrations:
(Solar calibration scans do not appear in the standard sweepfiles for the S-Pol data set.)