name2004-iss3: Logbook

name2004-iss3: Chronological Logbook Entries


Return to Logbook Top Page
Entry Date Title Site Author #Graphics
209 Sun 15-Aug-2004Sounding Bahia Kino 16 August 0000ZISS3 (Bahia Kino)Rebeca
208 Sun 15-Aug-2004Daily Report for August 15ISS3 (Bahia Kino)Rebeca
207 Sun 15-Aug-2004Sounding Bahia Kino 15 August 12ZISS3 (Bahia Kino)Heather
206 Sat 14-Aug-2004Daily Report for August 14ISS3 (Bahia Kino)Heather
205 Sat 14-Aug-2004Sounding Bahia Kino 15 August 00ZISS3 (Bahia Kino)Heather
204 Sat 14-Aug-2004Sounding Bahia Kino 14 August 12zISS3 (Bahia Kino)Jennifer
203 Fri 13-Aug-2004Sounding Bahia Kino 14 August 0zISS3 (Bahia Kino)Jennifer
202 Fri 13-Aug-2004Daily Report for August 13ISS3 (Bahia Kino)Rebeca
201 Fri 13-Aug-2004Sounding Bahia Kino 13 August 1800ZISS3 (Bahia Kino)Rebeca
200 Fri 13-Aug-2004Sounding Bahia Kino 13 August 1200ZISS3 (Bahia Kino)Rebeca
199 Fri 13-Aug-2004Sounding Bahia Kino 13 August 6ZISS3 (Bahia Kino)Heather
198 Thu 12-Aug-2004Daily Report for August 12ISS3 (Bahia Kino)Rebeca
197 Thu 12-Aug-2004Sounding Bahia Kino 13 August 0zISS3 (Bahia Kino)Jennifer
196 Thu 12-Aug-2004Sounding Bahia Kino 12 August 1800zISS3 (Bahia Kino)Rebeca
195 Thu 12-Aug-2004Sounding Bahia Kino 12 August 12zISS3 (Bahia Kino)Jennifer
194 Thu 12-Aug-2004Sounding Bahia Kino 12 August 0600ZISS3 (Bahia Kino)Rebeca
193 Wed 11-Aug-2004Sounding Bahia Kino 12 August 0000ZISS3 (Bahia Kino)Rebeca
192 Wed 11-Aug-2004Daily Report for August 11ISS3 (Bahia Kino)Rebeca
191 Wed 11-Aug-2004P. Penasco Motosat problemsISS2 (Puerto Penasco)Lou
190 Wed 11-Aug-2004Kino Roving team visitISS3 (Bahia Kino)June
189 Wed 11-Aug-2004Sounding Bahia Kino 11 August 18ZISS3 (Bahia Kino)Heather
188 Wed 11-Aug-2004Sounding Bahia Kino 11 August 12zISS3 (Bahia Kino)Jennifer
187 Wed 11-Aug-2004Sounding Bahia Kino 11 August 0600zISS3 (Bahia Kino)Rebeca
186 Tue 10-Aug-2004Sounding Bahia Kino 11 August 0zISS3 (Bahia Kino)Jennifer
185 Tue 10-Aug-2004Sounding Bahia Kino 10 August 18zISS3 (Bahia Kino)Jennifer
184 Tue 10-Aug-2004Daily Report for August 10ISS3 (Bahia Kino)Rebeca
183 Tue 10-Aug-2004Sounding Bahia Kino 10 August 12ZISS3 (Bahia Kino)Heather
182 Tue 10-Aug-2004Sounding Bahia Kino 10 August 0600ZISS3 (Bahia Kino)Heather
181 Mon 09-Aug-2004Sounding Bahia Kino 10 August 00ZISS3 (Bahia Kino)Rebeca
180 Mon 09-Aug-2004Daily Report for August 9ISS3 (Bahia Kino)Heather
179 Mon 09-Aug-2004Sounding Bahia Kino 9 August 18ZISS3 (Bahia Kino)Heather
178 Mon 09-Aug-2004Sounding Bahia Kino 9 August 1200zISS3 (Bahia Kino)Rebeca
177 Sun 08-Aug-2004Daily Report for August 8ISS3 (Bahia Kino)Rebeca
176 Sun 08-Aug-2004Sounding Bahia Kino 9 August 0000zISS3 (Bahia Kino)Rebeca
175 Sun 08-Aug-2004Sounding Bahia Kino 8 August 12zISS3 (Bahia Kino)Jennifer
174 Sun 08-Aug-2004Sounding Bahia Kino 8 August 0600ZISS3 (Bahia Kino)Rebeca
173 Sat 07-Aug-2004Sounding Bahia Kino 8 August 0000ZISS3 (Bahia Kino)Rebeca
172 Sat 07-Aug-2004Daily Report for August 7ISS3 (Bahia Kino)Heather
171 Sat 07-Aug-2004Sounding Bahia Kino 7 August 18ZISS3 (Bahia Kino)Heather
170 Sat 07-Aug-2004Sounding Bahia Kino 7 August 12zISS3 (Bahia Kino)Jennifer
169 Sat 07-Aug-2004Sounding Bahia Kino 7 August 0600zISS3 (Bahia Kino)Rebeca
168 Fri 06-Aug-2004Sounding Bahia Kino 7 August 0000zISS3 (Bahia Kino)Rebeca
167 Fri 06-Aug-2004Daily Report for August 6ISS3 (Bahia Kino)Jennifer
166 Fri 06-Aug-2004Sounding Bahia Kino 6 August 18zISS3 (Bahia Kino)Jennifer
165 Fri 06-Aug-2004Power Outage at 12z launch!ISS3 (Bahia Kino)Jennifer
164 Fri 06-Aug-2004Sounding Bahia Kino 6 August 12zISS3 (Bahia Kino)Jennifer
163 Fri 06-Aug-2004Sounding Bahia Kino 6 August 0600zISS3 (Bahia Kino)Rebeca
162 Fri 06-Aug-2004Daily Report for August 5ISS3 (Bahia Kino)Rebeca
161 Thu 05-Aug-2004Sounding Bahia Kino 6 August 0000zISS3 (Bahia Kino)Rebeca
160 Thu 05-Aug-2004Power Outage!ISS3 (Bahia Kino)Jennifer
159 Thu 05-Aug-2004Sounding Bahia Kino 5 August 18zISS3 (Bahia Kino)Jennifer
158 Thu 05-Aug-2004Sounding Bahia Kino 5 August 12zISS3 (Bahia Kino)Jennifer
157 Wed 04-Aug-2004Sounding Bahia Kino 5 August 0000Z RE-LAUNCHISS3 (Bahia Kino)Rebeca
156 Wed 04-Aug-2004Daily Report for August 4ISS3 (Bahia Kino)Rebeca
155 Wed 04-Aug-2004Sounding Bahia Kino 5 August 0000ZISS3 (Bahia Kino)Rebeca
154 Wed 04-Aug-2004Sounding Bahia Kino 4 August 12ZISS3 (Bahia Kino)Heather
153 Wed 04-Aug-2004Sounding Bahia Kino 4 August 0600zISS3 (Bahia Kino)Jennifer
152 Tue 03-Aug-2004Daily Report for August 2ISS3 (Bahia Kino)Rebeca
151 Tue 03-Aug-2004Sounding Bahia Kino 4 August 0ZISS3 (Bahia Kino)Heather
150 Tue 03-Aug-2004Sounding Bahia Kino 3 August 1800zISS3 (Bahia Kino)Jennifer
149 Tue 03-Aug-2004Sounding Bahia Kino 3 August 1200zISS3 (Bahia Kino)Heather
148 Mon 02-Aug-2004Daily Report for August 3ISS3 (Bahia Kino)Heather
147 Mon 02-Aug-2004Sounding Bahia Kino 3 August 0zISS3 (Bahia Kino)Jennifer
146 Mon 02-Aug-2004Sounding Bahia Kino 2 August 1200ZISS3 (Bahia Kino)Rebeca
145 Mon 02-Aug-2004Clary UPS malfunctionRebeca
144 Sun 01-Aug-2004Daily Report for August 1ISS3 (Bahia Kino)Heather
143 Sun 01-Aug-2004Sounding Bahia Kino 2 August 0ZISS3 (Bahia Kino)Heather
142 Sun 01-Aug-2004Sounding Bahia Kino 1 August 1800ZISS3 (Bahia Kino)Rebeca
141 Sun 01-Aug-2004Sounding Bahia Kino 1 August 12ZISS3 (Bahia Kino)Heather
140 Sun 01-Aug-2004Sounding Bahia Kino 1 August 0600zISS3 (Bahia Kino)Jennifer
139 Sat 31-Jul-2004Daily Report for July 31ISS3 (Bahia Kino)Heather
138 Sat 31-Jul-2004Sounding Bahia Kino 1 August 0ZISS3 (Bahia Kino)Heather
137 Sat 31-Jul-2004Sounding Bahia Kino 31 July 1200zISS3 (Bahia Kino)Jennifer
136 Fri 30-Jul-2004Daily Report for July 30ISS3 (Bahia Kino)Jennifer
135 Fri 30-Jul-2004Sounding Bahia Kino 31 July 0zISS3 (Bahia Kino)Jennifer
134 Fri 30-Jul-2004Sounding Bahia Kino 30 July 1200ZISS3 (Bahia Kino)Rebeca
133 Thu 29-Jul-2004Sounding Bahia Kino 30 July 0000ZISS3 (Bahia Kino)Rebeca
132 Thu 29-Jul-2004Roving team COMMENTS ON LOS MOCHISISS3 (Bahia Kino)Steve/John
131 Thu 29-Jul-2004Roving team notes for July 29ISS3 (Bahia Kino)Steve/John
130 Thu 29-Jul-2004Daily Report for July 29ISS3 (Bahia Kino)Heather
129 Thu 29-Jul-2004Sounding Bahia Kino 29 July 18ZISS3 (Bahia Kino)Rebeca
128 Thu 29-Jul-2004Sounding Bahia Kino 29 July 1200ZISS3 (Bahia Kino)Rebeca
127 Thu 29-Jul-2004Sounding Bahia Kino 29 July 06ZISS3 (Bahia Kino)Heather
126 Wed 28-Jul-2004Daily Report for July 28ISS3 (Bahia Kino)Jennifer
125 Wed 28-Jul-2004Sounding Bahia Kino 29 July 0zISS3 (Bahia Kino)Jennifer
124 Wed 28-Jul-2004Sounding Bahia Kino 28 July 1800ZISS3 (Bahia Kino)Rebeca
123 Wed 28-Jul-2004Sounding Bahia Kino 28 July 1200ZISS3 (Bahia Kino)Rebeca
122 Wed 28-Jul-2004Sounding Bahia Kino 28 July 0600ZISS3 (Bahia Kino)Rebeca
121 Tue 27-Jul-2004Sounding Bahia Kino 28 July 0ZISS3 (Bahia Kino)Steve/John
120 Tue 27-Jul-2004Roving team notes from LORETO visitISS3 (Bahia Kino)Steve/John
119 Tue 27-Jul-2004Roving team notesISS3 (Bahia Kino)Steve/John
118 Tue 27-Jul-2004Profiler performanceISS3 (Bahia Kino)Steve/John
117 Tue 27-Jul-2004Profiler data backup and down time (NAME_KIN03)ISS3 (Bahia Kino)Steve/John
116 Tue 27-Jul-2004Sounding Bahia Kino 27 July 12zISS3 (Bahia Kino)Rebeca
115 Tue 27-Jul-2004Daily Report for July 26ISS3 (Bahia Kino)Jennifer
114 Mon 26-Jul-2004Sounding Bahia Kino 27 July 0zISS3 (Bahia Kino)Jennifer
113 Mon 26-Jul-2004Sounding Bahia Kino 26 July 12zISS3 (Bahia Kino)Jennifer
112 Mon 26-Jul-2004Power Outage!ISS3 (Bahia Kino)Brad
111 Sun 25-Jul-2004Daily Report for July 25ISS3 (Bahia Kino)Jennifer
110 Sun 25-Jul-2004Sounding Bahia Kino 26 July 0zISS3 (Bahia Kino)Jennifer
109 Sun 25-Jul-2004Sounding Bahia Kino 25 July 12ZISS3 (Bahia Kino)Rebeca
108 Sat 24-Jul-2004Daily Report for July 24ISS3 (Bahia Kino)Heather
107 Sat 24-Jul-2004Sounding Bahia Kino 25 July 0ZISS3 (Bahia Kino)Heather
106 Sat 24-Jul-2004Sounding Bahia Kino 24 July 12ZISS3 (Bahia Kino)Heather
105 Fri 23-Jul-2004Daily Report for July 23ISS3 (Bahia Kino)Heather
104 Fri 23-Jul-2004Sounding Bahia Kino 24 July 0zISS3 (Bahia Kino)Heather
103 Fri 23-Jul-2004Sounding Bahia Kino 23 July 12zISS3 (Bahia Kino)Jennifer
102 Fri 23-Jul-2004Daily Report for July 22ISS3 (Bahia Kino)Jennifer
101 Thu 22-Jul-2004Sounding Bahia Kino 23 July, 0zISS3 (Bahia Kino)Brad
100 Thu 22-Jul-2004Profiler failureISS3 (Bahia Kino)Steve/John
99 Thu 22-Jul-2004Roving team notes: Thursday July 22ISS3 (Bahia Kino)Steve/John
98 Thu 22-Jul-2004Sounding Bahia Kino 22 July 18ZISS3 (Bahia Kino)Heather
97 Thu 22-Jul-2004Sounding Bahia Kino 22 July 12ZISS3 (Bahia Kino)Heather
96 Thu 22-Jul-2004Sounding Bahia Kino 22 July 6ZISS3 (Bahia Kino)Heather
95 Thu 22-Jul-2004Daily Report for July 21ISS3 (Bahia Kino)Heather
94 Wed 21-Jul-2004Sounding Bahia Kino 22 July 0ZISS3 (Bahia Kino)Heather
93 Wed 21-Jul-2004Sounding Bahia Kino 21 July 18zISS3 (Bahia Kino)Jennifer
92 Wed 21-Jul-2004Sounding Bahia Kino 21 July 12ZISS3 (Bahia Kino)Jennifer
91 Wed 21-Jul-2004Sounding Bahia Kino 21 July, 6zISS3 (Bahia Kino)Brad
90 Wed 21-Jul-2004Daily Report for July 20ISS3 (Bahia Kino)Jennifer
89 Tue 20-Jul-2004Sounding Bahia Kino 21 July 0zISS3 (Bahia Kino)Jennifer
88 Tue 20-Jul-2004Sounding Bahia Kino 20 July 18ZISS3 (Bahia Kino)Heather
87 Tue 20-Jul-2004Sounding Bahia Kino 20 July 12ZISS3 (Bahia Kino)Heather
86 Tue 20-Jul-2004Sounding Bahia Kino 20 July 06ZISS3 (Bahia Kino)Heather
85 Tue 20-Jul-2004Daily Report for July 19ISS3 (Bahia Kino)Jennifer
84 Mon 19-Jul-2004Sounding Bahia Kino 20 July 0ZISS3 (Bahia Kino)Jennifer
83 Mon 19-Jul-2004Sounding Bahia Kino 19 July 12ZISS3 (Bahia Kino)Heather
82 Mon 19-Jul-2004LNA DC voltage measuredISS3 (Bahia Kino)Steve/John
81 Mon 19-Jul-2004Clary GT1000 UPS running for GAOSISS3 (Bahia Kino)Steve/John
80 Mon 19-Jul-2004Daily report for July 18ISS3 (Bahia Kino)Jennifer
79 Sun 18-Jul-2004Sounding Bahia Kino 19 July 0ZISS3 (Bahia Kino)Heather
78 Sun 18-Jul-2004Roving team report for July 18ISS3 (Bahia Kino)Steve/John
77 Sun 18-Jul-2004IRT down during quick check.ISS3 (Bahia Kino)Steve/John
76 Sun 18-Jul-2004Profiler data backup and down timeISS3 (Bahia Kino)Steve/John
75 Sun 18-Jul-2004Sounding Bahia Kino 18 July 12ZISS3 (Bahia Kino)Heather
74 Sat 17-Jul-2004Daily report for July 17ISS3 (Bahia Kino)Jennifer
73 Sat 17-Jul-2004Sounding Bahia Kino 18 July 0zISS3 (Bahia Kino)Jennifer
72 Sat 17-Jul-2004Sounding Bahia Kino July 17th, 12zISS3 (Bahia Kino)Brad
71 Sat 17-Jul-2004Sounding Bahia Kino 17 July 0ZISS3 (Bahia Kino)Heather
70 Fri 16-Jul-2004Daily Report for July 16ISS3 (Bahia Kino)Heather
69 Fri 16-Jul-2004Sounding Bahia Kino 16 July 12zISS3 (Bahia Kino)Jennifer
68 Fri 16-Jul-2004Daily report July 15 and Power Outage Wrap-upISS3 (Bahia Kino)Brad
67 Fri 16-Jul-2004Power Outage!ISS3 (Bahia Kino)Brad
66 Thu 15-Jul-2004Sounding Bahia Kino 16 July 0ZISS3 (Bahia Kino)Heather
65 Thu 15-Jul-2004Sounding Bahia Kino 15 July 12ZISS3 (Bahia Kino)Heather
64 Thu 15-Jul-2004Daily report for July 15ISS3 (Bahia Kino)Brad
63 Wed 14-Jul-2004Sounding Bahia Kino 15 July 0zISS3 (Bahia Kino)Jennifer
62 Wed 14-Jul-2004Sounding Bahia Kino 14 July 18zISS3 (Bahia Kino)Jennifer
61 Wed 14-Jul-2004Sounding Bahia Kino 14 July 12zISS3 (Bahia Kino)Heather
60 Wed 14-Jul-2004Sounding Bahia Kino 14 July, 06ZISS3 (Bahia Kino)Heather
59 Wed 14-Jul-2004Daily report for July 14ISS3 (Bahia Kino)Heather
58 Tue 13-Jul-2004Daily report for Power-up 23z 7/13ISS3 (Bahia Kino)Brad
57 Tue 13-Jul-2004Sounding Bahia Kino 14 July, 00ZISS3 (Bahia Kino)Heather
56 Tue 13-Jul-2004Sounding Bahia Kino 13 July, 18zISS3 (Bahia Kino)Jennifer
55 Tue 13-Jul-2004Sounding Bahia Kino 13 July, 12zISS3 (Bahia Kino)Jennifer
54 Tue 13-Jul-2004Sounding Bahia Kino 13 July, 6zISS3 (Bahia Kino)Jennifer
53 Tue 13-Jul-2004Daily report for July 13ISS3 (Bahia Kino)Heather
52 Mon 12-Jul-2004Sounding Bahia Kino 13 July, 00zISS3 (Bahia Kino)Brad
51 Mon 12-Jul-2004Measured CLASS pre-amp voltagesISS3 (Bahia Kino)Steve/John
50 Mon 12-Jul-2004LIST OF BACKUP DISKSISS3 (Bahia Kino)Steve/John
49 Mon 12-Jul-2004Roving team notesISS3 (Bahia Kino)Steve/John
48 Mon 12-Jul-2004Confirmed PYG wiring; matches Puerto PenascoISS3 (Bahia Kino)Steve/John
47 Mon 12-Jul-2004Sounding Bahia Kino 12 July, 18zISS3 (Bahia Kino)Jennifer
46 Mon 12-Jul-2004Sounding Bahia Kino 12 July, 12zISS3 (Bahia Kino)Jennifer
45 Mon 12-Jul-2004Sounding Bahia Kino 12 July, 6zISS3 (Bahia Kino)Brad
44 Sun 11-Jul-2004Daily report for Sunday July 12ISS3 (Bahia Kino)Heather
43 Sun 11-Jul-2004Sounding Bahia Kino July 12th, 0zISS3 (Bahia Kino)Heather
42 Sun 11-Jul-2004Sounding Bahia Kino July 11th, 12zISS3 (Bahia Kino)Jennifer
41 Sun 11-Jul-2004Daily report for Saturday July 11 ISS3 (Bahia Kino)Heather
40 Sun 11-Jul-2004Daily report for Saturday July 10 ISS3 (Bahia Kino)Jennifer
39 Sat 10-Jul-2004Sounding Bahia Kino July 11th, 0zISS3 (Bahia Kino)Heather
38 Sat 10-Jul-2004Sounding Bahia Kino Saturday July 10, 12zISS3 (Bahia Kino)Brad
37 Sat 10-Jul-2004Sounding Bahia Kino Saturday July 10 6zISS3 (Bahia Kino)Jennifer
36 Sat 10-Jul-2004Sounding Bahia Kino TemplateISS3 (Bahia Kino)Jennifer
35 Sat 10-Jul-2004Daily report for Friday July 9ISS3 (Bahia Kino)Jennifer
34 Fri 09-Jul-2004tklog fixed at Los MochisISS3 (Bahia Kino)Charlie
33 Fri 09-Jul-2004IR Radiation Sensor TestsISS3 (Bahia Kino)Charlie
32 Fri 09-Jul-2004Sounding Bahia Kino Friday July 9th 18zISS3 (Bahia Kino)Brad
31 Fri 09-Jul-2004Sounding Bahia Kino Friday July 9th 12zISS3 (Bahia Kino)Heather
30 Fri 09-Jul-2004Sounding Bahia Kino Friday July 9 6z launchISS3 (Bahia Kino)Brad
29 Thu 08-Jul-2004Sounding Bahia Kino for Friday July 9 00ZISS3 (Bahia Kino)Brad
28 Thu 08-Jul-2004Daily report for Thursday, July 8ISS3 (Bahia Kino)Brad
27 Thu 08-Jul-2004Sounding Bahia Kino for Thursday July 8 18zISS3 (Bahia Kino)Brad
26 Thu 08-Jul-2004Sounding Bahia Kino for Thurs. July 08 12zISS3 (Bahia Kino)Jennifer
25 Thu 08-Jul-2004Sounding Bahia Kino for Thursday July 8 06ZISS3 (Bahia Kino)Heather
24 Thu 08-Jul-2004Daily report for Wed. July 07ISS3 (Bahia Kino)Jennifer
23 Wed 07-Jul-2004Sounding Bahia Kino for Wed. July 08 0ZISS3 (Bahia Kino)Heather
22 Wed 07-Jul-2004Sounding Bahia Kino for Wed. July 07 18zISS3 (Bahia Kino)Jennifer
21 Wed 07-Jul-2004Sounding Bahia Kino for Wed. July 07 12zISS3 (Bahia Kino)Jennifer
20 Tue 06-Jul-2004Sounding Launch 00z July 7ISS3 (Bahia Kino)Brad
19 Tue 06-Jul-2004Daily report for Tuesday July 6 Power UpISS3 (Bahia Kino)Brad
18 Tue 06-Jul-2004Daily report for Tuesday July 6ISS3 (Bahia Kino)Brad
17 Tue 06-Jul-2004Sounding Launch 12z July 6ISS3 (Bahia Kino)Heather
16 Mon 05-Jul-2004Daily report for Mon. July 5ISS3 (Bahia Kino)Brad
15 Mon 05-Jul-2004Sounding Bahia Kino for Monday July 6 0zUMBSHeather
14 Mon 05-Jul-2004Profiler settingsISS3 (Bahia Kino)Bill
13 Mon 05-Jul-2004Daily report for Sun July 4ISS3 (Bahia Kino)Bill
12 Mon 05-Jul-2004training sessionISS3 (Bahia Kino)Operator
11 Sun 04-Jul-2004Sounding Bahia Kino Sun July 5 0ZISS3 (Bahia Kino)Jennifer
10 Sun 04-Jul-2004training sessionISS3 (Bahia Kino)Charlie
9 Sun 04-Jul-2004Profiler repairedISS3 (Bahia Kino)Bill
8 Sun 04-Jul-2004Daily report for Sat July 3ISS3 (Bahia Kino)Bill
7 Sat 03-Jul-2004Sounding Launch 3 Jul 2215ISS3 (Bahia Kino)Brad
6 Sat 03-Jul-2004Daily report for Fri July 2ISS3 (Bahia Kino)Bill
5 Fri 02-Jul-2004fixed ssh port forwardingISS3 (Bahia Kino)Charlie
4 Fri 02-Jul-2004Daily report for Thu July 1ISS3 (Bahia Kino)Bill
3 Tue 29-Jun-2004Its AliveISS3 (Bahia Kino)Lou
2 Tue 27-Jun-2000Sounding Bahia Kino Saturday 10 0zISS3 (Bahia Kino)Jennifer
1 Tue 11-Apr-2000Logbook creatednoneiss


209: SOUNDING, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 22:42:58 GMT, Sounding Bahia Kino 16 August 0000Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408412104

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.84
Temp C		: 34.29
RH %		: 52.5

		For Surface Data
Pressure mb	: 1009.0 
Temp C		: 33.9
RH%		: 53.6
Wind Spd m/s	: 4.7
Wind Dir deg	: 231

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	sunny and clear. convection to north and east. some 
                        cumulus towers to west, light breeze.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 
Termination Altitude km	: 
Reason for Termination	: 

Post-Termination Weather Description: 

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























208: DAILY, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 11:35:12 GMT, Daily Report for August 15
All systems normal. 

HE tanks:3
sondes:  8
balloons: 10

Profiler disk write: 37.8%

voltage: 133.4 on ct.4 

Weather: sunny over our area with large amounts of convection to the east













































































207: SOUNDING, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 11:32:13 GMT, Sounding Bahia Kino 15 August 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408412415

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.21
Temp C		: 28.64
RH %		: 85.00

		For Surface Data
Pressure mb	: 1010.9
Temp C		: 28.5
RH%		: 86.3
Wind Spd m/s	: 2.9
Wind Dir deg	: 109

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Clear and calm
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 40.1
Termination Altitude km	: 22.052
Reason for Termination	: sonde stopped transmitting data

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1011.3
     		Temp C		: 27.048
		RH %		: 88.727
		Wspd m/s 	: .68373
		Wdir deg	: 69.038
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




























206: DAILY, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 22:46:33 GMT, Daily Report for August 14
All systems normal. 

HE tanks:4 
sondes:  10
balloons: 14

Profiler disk write:34.4%

voltage: 131.7 on ct.4 

Weather: Dark this morning when we left the site, large convective towers have 
been building to the North all the way around to the east and also to the west. Breezy and hot today.










































































205: SOUNDING, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 22:45:28 GMT, Sounding Bahia Kino 15 August 00Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 00Z
Sonde coef tape #:408411910 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.28
Temp C		: 33.44
RH %		: 51.70

		For Surface Data
Pressure mb	: 1009.6
Temp C		: 33.7
RH%		: 61.5
Wind Spd m/s	: 5.7
Wind Dir deg	: 208

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Clear above, strong convection all around site,hot and breezy.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 47.6
Termination Altitude km	: 21.247
Reason for Termination	: lost signal

Post-Termination Weather Description: Same as above, convection to the NNE has 
gotten deeper, anvil cloud can be seen to the NE.

For Surface Data
		Pressure mb	: 1008.8
     		Temp C		: 33.281
		RH %		: 65.465
		Wspd m/s 	: 4.0484
		Wdir deg	: 231.92
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























204: SOUNDING, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 10:39:28 GMT, Sounding Bahia Kino 14 August 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408412412

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.18
Temp C		: 27.64
RH %		: 62.9

		For Surface Data
Pressure mb	: 1011.3
Temp C		: 27.6
RH%		: 67.3
Wind Spd m/s	: 4.1
Wind Dir deg	: 182

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 63.8
Termination Altitude km	: 19.254
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1011.4
     		Temp C		: 26.117
		RH %		: 70.164
		Wspd m/s 	: 2.3742
		Wdir deg	: 35.47
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------































203: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 22:37:04 GMT, Sounding Bahia Kino 14 August 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408412303

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.16
Temp C		: 32.79
RH %		: 68.04

		For Surface Data
Pressure mb	: 1009.7
Temp C		: 33.5
RH%		: 69.1
Wind Spd m/s	: 5.6
Wind Dir deg	: 211

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies with stratus to the N.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 52.3
Termination Altitude km	: 20.664
Reason for Termination	: Stopped transmitting data.

Post-Termination Weather Description: Clear skies with stratus to the N and E.

For Surface Data
		Pressure mb	: 1009
     		Temp C		: 32.343
		RH %		: 73.848
		Wspd m/s 	: 4.9075
		Wdir deg	: 208.75
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























202: DAILY, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 16:41:45 GMT, Daily Report for August 13
All systems normal. 

HE tanks: 4 3/5 
sondes: 12 
balloons: 18

Profiler disk write:30.8%

voltage  

Weather: Clear and sunny all day.








































































201: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 16:37:43 GMT, Sounding Bahia Kino 13 August 1800Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408411914

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1012.32
Temp C		: 34.40
RH %		: 53.70

		For Surface Data
Pressure mb	:1013.6
Temp C		: 34.2
RH%		: 57.9
Wind Spd m/s	: 4.2
Wind Dir deg	: 203

Pre-Launch		Note conditions not observable by automatic systems
Weather Description    hot, sunny and clear in all directions

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 44.9
Termination Altitude km	: 21.555
Reason for Termination	: lost signal

Post-Termination Weather Description: sunny and clear, scattered cumulus to NE, light breeze

For Surface Data
		Pressure mb	:1013.2
     		Temp C		: 34.675
		RH %		: 53.687
		Wspd m/s 	: 6.0884
		Wdir deg	: 195.72
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




































200: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 10:50:02 GMT, Sounding Bahia Kino 13 August 1200Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408403902

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.12
Temp C		: 28.81
RH %		: 84.3

		For Surface Data
Pressure mb	:1011.2 
Temp C		: 28.8
RH%		: 85.3
Wind Spd m/s	: 1.8
Wind Dir deg	: 69

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	clear sky, humid

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 33.0
Termination Altitude km	: 23.415
Reason for Termination	: balloon burst

Post-Termination Weather Description: clear skies, humid

For Surface Data
		Pressure mb	: 1011.7
     		Temp C		: 28.014
		RH %		: 86.568
		Wspd m/s 	: 2.3416
		Wdir deg	: 91.337
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
































199: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 04:36:25 GMT, Sounding Bahia Kino 13 August 6Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408402504

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.09
Temp C		: 30.76
RH %		: 79.90

		For Surface Data
Pressure mb	: 1011.3
Temp C		: 30.3
RH%		: 78.5
Wind Spd m/s	: 4.1
Wind Dir deg	: 228

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
CLear skies with ligtening to the north and east.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 36.7
Termination Altitude km	: 22.765
Reason for Termination	: balloon burst

Post-Termination Weather Description: Falling stars and SE winds, no lightening spotted at time of obs.

For Surface Data
		Pressure mb	: 1011.4
     		Temp C		: 30.563
		RH %		: 80.716
		Wspd m/s 	: 3.7593
		Wdir deg	: 226.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























198: DAILY, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 22:41:40 GMT, Daily Report for August 12
All systems normal. 

HE tanks: 5 1/5
sondes: 16
balloons:22

Profiler disk write:27.3%

voltage  132.9

Weather:  Clear and sunny today with some clouds and lightning in the distance this morning.






































































197: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 22:38:13 GMT, Sounding Bahia Kino 13 August 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408411901

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.2
Temp C		: 34.47
RH %		: 60.2

		For Surface Data
Pressure mb	: 1010.1
Temp C		: 33
RH%		: 65.5
Wind Spd m/s	: 4.8
Wind Dir deg	: 233

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 33.9
Termination Altitude km	: 23.489
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Cirrus to the NE and W.

For Surface Data
		Pressure mb	: 1009.1
     		Temp C		: 32.875
		RH %		: 67.508
		Wspd m/s 	: 2.8773
		Wdir deg	: 212.97
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------































196: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 16:39:29 GMT, Sounding Bahia Kino 12 August 1800z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408411913

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.3
Temp C		: 33.57
RH %		: 74.60

		For Surface Data
Pressure mb	:1012.5 
Temp C		: 33.1
RH%		: 50.9
Wind Spd m/s	: 3.04
Wind Dir deg	: 128

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	sunny and clear stratus clouds to N

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 35.3
Termination Altitude km	: 23.084
Reason for Termination	: lost signal

Post-Termination Weather Description: sunny and clear with a light breeze

For Surface Data
		Pressure mb	: 1012.3
     		Temp C		: 33.365
		RH %		: 61.409
		Wspd m/s 	: 3.2546
		Wdir deg	: 222.18
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde humidity was higher than sfc humidity by a factor of around 20. we waited for it to stabalize but it did not and we decided to proceed with the launch. on the launch screen, raw met data still had the sonde humidity at around 70 but 
the 10-sec data has it showing up at around 50 before we launched. 































195: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 10:47:07 GMT, Sounding Bahia Kino 12 August 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408402503

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.87
Temp C		: 27.67
RH %		: 87.10

		For Surface Data
Pressure mb	: 1011.3
Temp C		: 27.5
RH%		: 87.8
Wind Spd m/s	: 2.7
Wind Dir deg	: 53

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear with lightning to the NNE.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 41.3
Termination Altitude km	: 21.976
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Cumulus in all directions with lightning to the NE.

For Surface Data
		Pressure mb	: 1013.2
     		Temp C		: 28.233
		RH %		: 84.414
		Wspd m/s 	: 4.0092
		Wdir deg	: 76.704
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























194: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 04:43:27 GMT, Sounding Bahia Kino 12 August 0600Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408403903

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	:1009.60
Temp C		: 30.58
RH %		:75.60

		For Surface Data
Pressure mb	:1011.1
Temp C		: 30.7
RH%		: 76.7
Wind Spd m/s	:4.7
Wind Dir deg	:204

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	clear night, lightning to north, humid

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 54.2
Termination Altitude km	: 20.313
Reason for Termination	: stopped recieving data

Post-Termination Weather Description: overcast, humid, light breeze                                       

For Surface Data
		Pressure mb	: 1011.3
     		Temp C		: 30.131
		RH %		: 80.043
		Wspd m/s 	: 2.8283
		Wdir deg	: 164.04
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------


































193: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 22:39:00 GMT, Sounding Bahia Kino 12 August 0000Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408411904

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.82
Temp C		: 32.37
RH %		: 79.1

		For Surface Data
Pressure mb	:1009.3
Temp C		: 32.5
RH%		: 73.0
Wind Spd m/s	: 5.2
Wind Dir deg	: 227

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	sunny and clear with a light breeze, convection to the
                        north and east.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 41.6
Termination Altitude km	: 22.117
Reason for Termination	: lost signal

Post-Termination Weather Description: sunny and clear, light breeze, convection
                                      to the north.

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 32.072
		RH %		: 71.088
		Wspd m/s 	: 3.8344
		Wdir deg	: 216.89
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------































192: DAILY, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 22:38:18 GMT, Daily Report for August 11
All systems normal. 

HE tanks: 7 2/5
sondes: 21
balloons:27

Profiler disk write:24.1%

voltage   133.2 on Ct4

Weather:  sunny and clear during the day, cloudy at night, convection to the 
north and east and a light breeze througout the day/night.



































































191: INFO, Site ISS2 (Puerto Penasco), Wed 11-Aug-2004 19:07:47 GMT, P. Penasco Motosat problems
Since yesterday afternoon I've been working with the operators at Penasco to fix the motosat system. In theory the system should be working. All tests have have worked fine . System passed calibrate sensors ,good sat numbers for strengh and quality. System has been shutdown and rebooted ,dish stowed and brought up
 again. GPS up dates when refreshed.
Still time out error messages when attempting to go to any web site.
 Currently waiting on a return call from Eagle Computers to discuss what could 
be happening.
 From what operators have said porblems started after some disruption in power
to the system.

190: INFO, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 18:51:16 GMT, Kino Roving team visit
The roving team (Lou and June) visited Kino site on Aug. 10 and Aug. 11. Here is a summary for our visit:

(1) Profiler data backup: We stopped the profiler at 20:05-20:55 UTC on Aug. 10 to back up the profiler data. The data were backed up to two CDs (NAME_KIN04 and NAME_KIN05). We left one copy in the trailer and brought one copy with us. After backup, the disk was ~20% full.

(2) Data backup on DM computer: We backed up raw and NIMA data on DM computer on two DVDs (one for raw and one for NIMA), left one copy in the trailer and brought one copy with us.


189: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 16:41:08 GMT, Sounding Bahia Kino 11 August 18Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408411909

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.7
Temp C		: 33.97
RH %		: 55.40

		For Surface Data
Pressure mb	:1012.3 
Temp C		: 33.3
RH%		: 60.7
Wind Spd m/s	: 4.2
Wind Dir deg	: 214

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Cirrus to the NNE, some convection to the North.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 47.6
Termination Altitude km	: 21.174
Reason for Termination	: Balloon burst

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1012
     		Temp C		: 33.334
		RH %		: 66.651
		Wspd m/s 	: 5.6344
		Wdir deg	: 219.7
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























188: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 10:41:55 GMT, Sounding Bahia Kino 11 August 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408403900

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.14
Temp C		: 27.56
RH %		: 100

		For Surface Data
Pressure mb	: 1010.5
Temp C		: 27.5
RH%		: 90
Wind Spd m/s	: 2.1
Wind Dir deg	: 51

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 38.4
Termination Altitude km	: 22.431
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Mostly clear with some alto cumulus to the NNE.

For Surface Data
		Pressure mb	: 1010.9
     		Temp C		: 27.42
		RH %		: 91.758
		Wspd m/s 	: 1.3322
		Wdir deg	: 105.17
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























187: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 04:39:37 GMT, Sounding Bahia Kino 11 August 0600z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408402502

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.63
Temp C		: 30.29
RH %		: 73.40

 		For Surface Data
Pressure mb	:1011.6 
Temp C		: 30.5
RH%		: 73.3
Wind Spd m/s	: 3.1
Wind Dir deg	: 180

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	cloudy with a light breeze and humid. 

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 39.5
Termination Altitude km	: 22.302
Reason for Termination	: balloon burst

Post-Termination Weather Description: humid, cloudy with a light breeze

For Surface Data
		Pressure mb	: 1011.2
     		Temp C		: 29.834
		RH %		: 80.573
		Wspd m/s 	: 2.7875
		Wdir deg	: 152.62
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

































186: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 22:42:21 GMT, Sounding Bahia Kino 11 August 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408411900

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.39
Temp C		: 32.61
RH %		: 71.30

 		For Surface Data
Pressure mb	: 1010.8
Temp C		: 32.8
RH%		: 71.8
Wind Spd m/s	: 5.5
Wind Dir deg	: 204

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Layer of stratus to the E with convection to the N.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 56.7
Termination Altitude km	: 20.161
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Overcast with cumulus in all directions.

For Surface Data
		Pressure mb	: 1010.1
     		Temp C		: 31.531
		RH %		: 75.988
		Wspd m/s 	: 4.95
		Wdir deg	: 182.39
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























185: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 16:43:49 GMT, Sounding Bahia Kino 10 August 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408403905

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.10
Temp C		: 32.9
RH %		: 51.8

		For Surface Data
Pressure mb	: 1013.7
Temp C		: 32.3
RH%		: 59.3
Wind Spd m/s	: 2.3
Wind Dir deg	: 142

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Alto cumulus in all directions.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 34.7
Termination Altitude km	: 23.157
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Mostly clear.

For Surface Data
		Pressure mb	: 1013.1
     		Temp C		: 33.376
		RH %		: 61.309
		Wspd m/s 	: 5.4547
		Wdir deg	: 219.37
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























184: DAILY, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 10:46:14 GMT, Daily Report for August 10
All systems normal. 

HE tanks:7 
sondes:25
balloons:31

Profiler disk write:21.3%

voltage   134.0on Ct4

Weather: convection to the N and NE with occasional low cumulus clouds and humid 
































































183: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 10:45:01 GMT, Sounding Bahia Kino 10 August 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408403901

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.67
Temp C		: 28.08
RH %		: 75.90

		For Surface Data
Pressure mb	:1011.7 
Temp C		: 28.2
RH%		: 75.8
Wind Spd m/s	: 6.5
Wind Dir deg	: 136

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Overcast, breezy, lightening to the ESE.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 73.4
Termination Altitude km	: 18.455
Reason for Termination	: balloon burst

Post-Termination Weather Description:overcast, winds light.

For Surface Data
		Pressure mb	: 1011.3
     		Temp C		: 27.226
		RH %		: 80.656
		Wspd m/s 	: 2.2321
		Wdir deg	: 99.6
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























182: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 04:50:53 GMT, Sounding Bahia Kino 10 August 0600Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408412113

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.94
Temp C		: 31.05
RH %		: 80.80

		For Surface Data
Pressure mb	: 1011.2
Temp C		: 30.9
RH%		: 80.6
Wind Spd m/s	: 2.2
Wind Dir deg	: 92.0

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Clear, lightening to the north .                    

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 57.2
Termination Altitude km	: 20.021
Reason for Termination	: sonde stopped transmitting data

Post-Termination Weather Description: 
very dark, possibly overcast                                   

For Surface Data
		Pressure mb	: 1012.2
     		Temp C		: 30.865
		RH %		: 75.228
		Wspd m/s 	: 1.734
		Wdir deg	: 120.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
































181: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 22:43:32 GMT, Sounding Bahia Kino 10 August 00Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 00Z
Sonde coef tape #: 408400705

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.16
Temp C		: 33.82
RH %		: 70.8

		For Surface Data
Pressure mb	: 1008.9
Temp C		: 33.4
RH%		: 71.6
Wind Spd m/s	: 7.4
Wind Dir deg	: 230

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	mostly sunny with convection occuring to the N and NE,
                       breezy with sudden gusts at times. 

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 46.1
Termination Altitude km	: 21.482
Reason for Termination	: lost signal

Post-Termination Weather Description: partly cloudy, convection to N and NE has
                                      increased, cumulus clouds elsewhere

For Surface Data
		Pressure mb	: 1009.4
     		Temp C		: 32.858
		RH %		: 74.104
		Wspd m/s 	: 6.1391
		Wdir deg	: 213.49
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























180: DAILY, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 16:55:06 GMT, Daily Report for August 9
All systems normal. 

HE tanks:7 3/5
sondes:28
balloons:34

Profiler disk write:65.1%

voltage  134.4 on Ct4

Weather: mostly sunny skies with convection occuring througout the day to the 
north, winds have picked up slightly, humid most of the day































































179: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 16:53:54 GMT, Sounding Bahia Kino 9 August 18Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408400706

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.49
Temp C		: 34.46
RH %		: 52.70

		For Surface Data
Pressure mb	: 1013.3
Temp C		: 34.7
RH%		: 53.4
Wind Spd m/s	: 1.7
Wind Dir deg	: 146

Pre-Launch		Note conditions not observable by automatic systems
Weather Description: Cirrus to the SSE.	

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 53.2
Termination Altitude km	: 20.498
Reason for Termination	: sonde stopped transmitting data

Post-Termination Weather Description: Cumulus on the horizon to the ESE, cirrus to the south.

For Surface Data
		Pressure mb	: 1012.5
     		Temp C		: 35.288
		RH %		: 54.169
		Wspd m/s 	: 4.9386
		Wdir deg	: 220
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























178: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 10:46:37 GMT, Sounding Bahia Kino 9 August 1200z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400600

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.98
Temp C		: 29.31
RH %		: 91.5

		For Surface Data
Pressure mb	:1009.8 
Temp C		: 29.9
RH%		: 79.2
Wind Spd m/s	: 1.5
Wind Dir deg	: 136

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	 mostly clear, some alto stratus in patches, light 
                         breeze, humid.
                        
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 73.9
Termination Altitude km	: 18.426
Reason for Termination	: lost signal

Post-Termination Weather Description: mostly clear with high stratus clouds to the east, alto stratus to the north with a few cumulus clouds to the north as
well, humid. 

For Surface Data
		Pressure mb	: 1011
     		Temp C		: 29.689
		RH %		: 83.663
		Wspd m/s 	: 2.9083
		Wdir deg	:132.88
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde relative humidity off again, waited for it to stabalize but did not. we still proceeded with the next launch screen and the ten second data did show relative humidity at around high 70's even though the raw data still had it around low 90's.































177: DAILY, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 23:02:52 GMT, Daily Report for August 8
All systems normal. 

HE tanks:8 4/5
sondes:31
balloons:37

Profiler disk write:61.6%

voltage 133.7 on Ct4

Weather: 
lightning at night to the north east, today was clear and sunny with large 
amounts of convection firing up to the north




























































176: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 22:45:06 GMT, Sounding Bahia Kino 9 August 0000z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408400602

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 106.35
Temp C		: 32.89
RH %		: 89.30

		For Surface Data
Pressure mb	:1008.7 
Temp C		: 33.8
RH%		: 64.2
Wind Spd m/s	: 6.1
Wind Dir deg	: 225

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	sunny and clear everywhere except to the north: large 
                        amount of convection to the north 

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 60.8
Termination Altitude km	: 19.727
Reason for Termination	: lost signal

Post-Termination Weather Description: sunny and clear, convection to north has
                                     decreased, light breeze

For Surface Data
		Pressure mb	: 1007.5
     		Temp C		: 32.766
		RH %		: 71.939
		Wspd m/s 	: 5.4204
		Wdir deg	:228.61
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde initial humidity data was off by more than 20 compared to surface data. we waited a while to see if it would stabalize but it did not. the rest of the 
data was good so we launched the balloon.  

recieved weak signal througout flight and only could be tracked with omni 
antenna




























175: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 10:51:44 GMT, Sounding Bahia Kino 8 August 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400715

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.62
Temp C		: 28.12
RH %		: 81.80

		For Surface Data
Pressure mb	: 1009.2
Temp C		: 28.0
RH%		: 85.4
Wind Spd m/s	: 1.5
Wind Dir deg	: 52 

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Dark with some clouds over head.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 46.8
Termination Altitude km	: 21.199
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Mostly clear with alto cumulus to the NE.

For Surface Data
		Pressure mb	: 1010
     		Temp C		: 27.145
		RH %		: 86.501
		Wspd m/s 	: .80297
		Wdir deg	: 65.423
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























174: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 04:42:41 GMT, Sounding Bahia Kino 8 August 0600Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408400709

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.46
Temp C	        : 31.51
RH %		: 75.9

		For Surface Data
Pressure mb	:1008.4 
Temp C		:31.5
RH%		:75.9
Wind Spd m/s	:4.1
Wind Dir deg	: 225

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear overhead but cumulus towers and lightning to NE, light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 48.1
Termination Altitude km	: 21.048
Reason for Termination	: stopped transmitting data

Post-Termination Weather Description: humid, mostly cloudy, light breeze 

For Surface Data
		Pressure mb	: 1009.4
     		Temp C		: 30.871
		RH %		: 74.811
		Wspd m/s 	: 4.607
		Wdir deg	: 202.54
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
































173: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 22:50:31 GMT, Sounding Bahia Kino 8 August 0000Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408400601

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1004.91
Temp C	        : 33.21
RH %		: 59.2

		For Surface Data
Pressure mb	: 1007.1
Temp C		:33.4
RH%		: 61.4
Wind Spd m/s	:6.5 
Wind Dir deg	: 223

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
sunny, clear, light breeze with some convection to the north
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 48.6
Termination Altitude km	: 21.121
Reason for Termination	: sonde stopped transmitting data

Post-Termination Weather Description: Large cumulus towers building to the north,clear in all directions.

For Surface Data
		Pressure mb	: 1006.7
     		Temp C		: 32.867
		RH %		: 65.397
		Wspd m/s 	: 3.9978
		Wdir deg	: 216.88
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























172: DAILY, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 16:52:14 GMT, Daily Report for August 7
All systems normal. 

HE tanks:8 1/5
sondes:34
balloons:39

Profiler disk write:58.1%

voltage 132.2 on Ct4

Weather: 
Clouds from this morning have cleared overhead,large convective tower building to the north 
























































171: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 16:46:40 GMT, Sounding Bahia Kino 7 August 18Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408401415

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.93
Temp C		: 32.65
RH %		: 57.10

		For Surface Data
Pressure mb	: 1011.3
Temp C		: 32.3
RH%		: 61.4
Wind Spd m/s	: 1.8
Wind Dir deg	: 148

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Clear and calm.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 27.7
Termination Altitude km	: 24.6
Reason for Termination	: lost signal

Post-Termination Weather Description: Cumulus towers building on the horizon to the WSW, a small batch of cirrus to the south, clear otherwise, winds have 
picked up.

For Surface Data
		Pressure mb	: 1010.4
     		Temp C		: 322.754
		RH %		: 66.219
		Wspd m/s 	: 4.4698
		Wdir deg	: 236.94
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




























170: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 10:48:02 GMT, Sounding Bahia Kino 7 August 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401200

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.32
Temp C		: 28.06
RH %		: 87.6

		For Surface Data
Pressure mb	: 1010.5
Temp C		: 28.0
RH%		: 87.4
Wind Spd m/s	: 2.7
Wind Dir deg	: 92

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Dark, with cirrus clouds to the NE.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 57.4
Termination Altitude km	: 19.931
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Alto cumulus to the NE and NW.

For Surface Data
		Pressure mb	: 1010.6
     		Temp C		: 27.498
		RH %		: 86.823
		Wspd m/s 	: 1.6278
		Wdir deg	: 65.954
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























169: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 04:42:50 GMT, Sounding Bahia Kino 7 August 0600z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408401312
------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.64
Temp C		: 29.66
RH %		: 83.10

		For Surface Data
Pressure mb	:1011.2
Temp C		: 29.5
RH%		: 80.3
Wind Spd m/s	: 3.8
Wind Dir deg	: 221

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
 some clouds, hard to see in the dark, light breeze                  

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	:45.0
Termination Altitude km	:21.478
Reason for Termination	: balloon burst

Post-Termination Weather Description: same as above

For Surface Data
		Pressure mb	: 1011.0
     		Temp C		: 29.243
		RH %		: 82.316
		Wspd m/s 	: 3.6417
		Wdir deg	: 184.21
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




































168: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 22:37:29 GMT, Sounding Bahia Kino 7 August 0000z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401308
------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.55
Temp C		: 31.72
RH %		: 64.10

		For Surface Data
Pressure mb	:1010.8 
Temp C		: 31.6
RH%		: 66.2
Wind Spd m/s	: 4.9
Wind Dir deg	: 218

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	thin blanket of stratocumulus clouds over most of sky,
                        light breeze

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 50.1
Termination Altitude km	:19.984
Reason for Termination	: Stopped transmitting data.

Post-Termination Weather Description:convection firing up to the north, thin 
stratus layer to west, light breeze

For Surface Data
		Pressure mb	: 1009.7
     		Temp C		: 30.284
		RH %		: 74.389
		Wspd m/s 	: 5.0023
		Wdir deg	: 220.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------


































167: DAILY, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 16:55:42 GMT, Daily Report for August 6
All systems normal. 

Power outage this morning. Clary is up and running again with the sounding computer hooked up to it. 

HE tanks:8
sondes:38
balloons:43

Profiler disk write: 53.6%


Weather: Thunderstorm this morning at 12z launch. Overcast and cloudy today with a slight breeze.























































166: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 16:44:05 GMT, Sounding Bahia Kino 6 August 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408401303
------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.49
Temp C		: 30.27
RH %		: 60.60

		For Surface Data
Pressure mb	: 1013.1
Temp C		: 29.9
RH%		: 63.1
Wind Spd m/s	: 2.4
Wind Dir deg	: 75

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Cumulus towers all around with a slight breeze.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 31.2
Termination Altitude km	: 23.857
Reason for Termination	: Stopped transmitting data.

Post-Termination Weather Description: Same as above. 

For Surface Data
		Pressure mb	: 1013.1
     		Temp C		: 32.659
		RH %		: 54.987
		Wspd m/s 	: 1.9234
		Wdir deg	: 128.68
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
































165: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 11:06:25 GMT, Power Outage at 12z launch!
Short power outage this morning at 12z launch from storm. We had to restart the sounding system and bypass the clary as it started beeping at the very start of launch before we let the balloon go. We aborted the sonding, restarted the system without the clary and everything seems fine.





















164: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 10:49:00 GMT, Sounding Bahia Kino 6 August 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408414206

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1012.69
Temp C		: 27.29
RH %		: 84.7

		For Surface Data
Pressure mb	: 1013.7
Temp C		: 26.7
RH%		: 92.3
Wind Spd m/s	: 10.3
Wind Dir deg	: 141

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Warmer than usual this morning with more humidity, rain and strong gusty winds with lightning in the distance from all directions.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 83
Termination Altitude km	: 17.708
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Storm now over with alto cumulus clouds in all directions.

For Surface Data
		Pressure mb	: 1011.8
     		Temp C		: 28.967
		RH %		: 73.192
		Wspd m/s 	: 3.0194
		Wdir deg	: 116.3
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























163: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 04:53:28 GMT, Sounding Bahia Kino 6 August 0600z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0600z
Sonde coef tape #: 408401510

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.75
Temp C		: 30.13
RH %		: 79.5

		For Surface Data
Pressure mb	: 1010.8
Temp C		: 30.0
RH%		: 80.9
Wind Spd m/s	: 3.4
Wind Dir deg	: 222

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear skies with a light breeze 
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 51.5
Termination Altitude km	: 20.638
Reason for Termination	: stopped transmitting data

Post-Termination Weather Description: light breeze and scattered cumulus clouds

For Surface Data
		Pressure mb	: 1010.8
     		Temp C		: 29.882
		RH %		: 79.322
		Wspd m/s 	: 3.0161
		Wdir deg	: 235.73
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------



































162: DAILY, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 00:44:31 GMT, Daily Report for August 5
All systems normal. 

we powered down after 12z launch this morning because the site power supply would be turned off for one hour from 7am to 8am. Before the 18z launch, we started the systems up again and everything worked fine.

the roving crew was here today for a couple of hours and will be back early next week. 

HE tanks:9 2/5
sondes:42
balloons:47

Profiler disk write: 51.3%

Voltage:134.5

Weather: today has been mostly sunny with a variety of scattered clouds 
througout the day but no significant weather




















































161: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 22:48:16 GMT, Sounding Bahia Kino 6 August 0000z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401506

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.1 
Temp C		: 33.08
RH %		: 61.6

		For Surface Data
Pressure mb	: 1010.1
Temp C		: 33.2
RH%		: 62.2
Wind Spd m/s	: 4.8
Wind Dir deg	: 221

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
sunny with some convection to the north
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 71.4
Termination Altitude km	: 18.726
Reason for Termination	: stopped transmitting data

Post-Termination Weather Description: sunny, thin layer of stratus to north, some convection to west

For Surface Data
		Pressure mb	: 1009.6
     		Temp C		: 32.251
		RH %		: 69.193
		Wspd m/s 	: 3.7348
		Wdir deg	: 229.63
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

































160: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 16:51:52 GMT, Power Outage!
Power outage this morning from 6:00 am to 9:30 am. All system shut down before outage and all started up successfully.




















159: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 16:48:17 GMT, Sounding Bahia Kino 5 August 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408414202

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.72
Temp C		: 33.16
RH %		: 54.10

		For Surface Data
Pressure mb	: 1012.8
Temp C		: 32.5
RH%		: 65.1
Wind Spd m/s	: 3.5
Wind Dir deg	: 120

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Alto cumulus to the N and stratus to E.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 32.7
Termination Altitude km	: 23.526
Reason for Termination	: balloon burst

Post-Termination Weather Description: sunny with scattered cumulus clouds

For Surface Data
		Pressure mb	: 1012.5
     		Temp C		: 35.739
		RH %		: 46.331
		Wspd m/s 	: 4.754
		Wdir deg	: 196.14
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------































158: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 10:44:48 GMT, Sounding Bahia Kino 5 August 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400713

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.10
Temp C		: 29.07
RH %		: 79.40

		For Surface Data
Pressure mb	: 1010.4
Temp C		: 29.0
RH%		: 79.0
Wind Spd m/s	: 2.9
Wind Dir deg	: 152

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 73.3
Termination Altitude km	: 18.466
Reason for Termination	: Stopped receiving data.

Post-Termination Weather Description: Strato cumulus clouds to the NE and NW.

For Surface Data
		Pressure mb	: 1011.4
     		Temp C		: 27.911
		RH %		: 87.456
		Wspd m/s 	: 2.2338
		Wdir deg	: 57.179
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























157: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:55:12 GMT, Sounding Bahia Kino 5 August 0000Z RE-LAUNCH
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0000Z
Sonde coef tape #:408401515

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.94
Temp C		: 31.48
RH %		: 72.80

		For Surface Data
Pressure mb	:1009.0
Temp C		: 31.4
RH%		: 74.3
Wind Spd m/s	: 4.7
Wind Dir deg	: 206

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
sunny with thin layers of stratocumulus clouds over some parts of the sky. 
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 92.2
Termination Altitude km	: 17.197
Reason for Termination	: sonde stopped transmitting data

Weather:mostly cloudy skies with a blanket of stratocumulus clouds over most of area, light breeze

For Surface Data
		Pressure mb	: 1009.0
     		Temp C		: 30.407
		RH %		: 77.58
		Wspd m/s 	: 4.5302
		Wdir deg	: 208.64
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

Cycled the MotoSat laptop, Motosat, and powerstrip. Turned all off, waited a couple of minutes, powered up, phone and internet back up. 

Balloon burst prematurely for the first sone,#408401411, at approx. 543.9mb. Launched second sonde at approx. 0030Z. 































156: DAILY, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:17:46 GMT, Daily Report for August 4
All systems normal. 
Cycled Motostat, working fine now.

Launched second sonde at 0030Z because first one burst at 543.9mb, 
see 00Z relaunch log.

ramon came by and told us they are going to turn off the power tomorrow from 7am to 8am. we will shut down the equipment and turn it back on around 8:15am 

HE tanks:9 4/5
sondes:45
balloons:50

Profiler disk write: 48.6%

Voltage:134.8

Weather: this morning we saw clouds at all levels this can be shown by the 
skew-t chart. they were stratus clouds at higher levels and cumulus and stratocumulus clouds at lower levels. mostly sunny the rest of today with thin layers ofstratocumulus randomly scattered when we first launched to thicker stratocumulusclouds moving in from the south by 0z. 

sorry puerto penasco, but we have better seafood drive down and come visit



















































155: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:00:16 GMT, Sounding Bahia Kino 5 August 0000Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0000Z
Sonde coef tape #:408401411 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.50
Temp C		: 32.10
RH %		: 71.50

		For Surface Data
Pressure mb	:1009.4
Temp C		: 32.4
RH%		: 70.7
Wind Spd m/s	: 5.4
Wind Dir deg	: 215

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
sunny with thin layers of stratocumulus clouds over some parts of the sky. 
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	:  balloon burst at 543mb
Termination Altitude km	: 
Reason for Termination	: 

Weather:

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

Cycled the MotoSat laptop, Motosat, and powerstrip. Turned all off, waited a couple of minutes, powered up, phone and internet back up. 


balloon burst at around 543.9mb will relaunch a new sonde. 





























154: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 10:55:15 GMT, Sounding Bahia Kino 4 August 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408401502 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.30
Temp C		: 26.85
RH %		: 71.70

		For Surface Data
Pressure mb	:1008.8 
Temp C		: 26.8
RH%		: 72.6
Wind Spd m/s	: 0.5
Wind Dir deg	: 20

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
overcast, cool, calm winds
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 64.4
Termination Altitude km	: 19.246
Reason for Termination	: lost signal

Post-Termination Weather Description: Low level cumulus layer from the SE to the SW w/ a cumulostratus/stratus layer above in all directions, cool, a little more wind than at launch time. 

For Surface Data
		Pressure mb	: 1009.7
     		Temp C		: 27.241
		RH %		: 78.603
		Wspd m/s 	: 1.7944
		Wdir deg	: 87.356
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























153: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 04:41:54 GMT, Sounding Bahia Kino 4 August 0600z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408401503

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.57
Temp C		: 30.93
RH %		: 62.30

		For Surface Data
Pressure mb	: 1009.7
Temp C		: 31.0
RH%		: 60.1
Wind Spd m/s	: 4.3
Wind Dir deg	: 203

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Lightning off to the NNE.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 97.9
Termination Altitude km	: 16.787
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Clouds moving in, temperatures cooling off

For Surface Data
		Pressure mb	: 1009.9
     		Temp C		: 30.661
		RH %		: 57.798
		Wspd m/s 	: 2.6764
		Wdir deg	: 182.71
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

First sonde we launched was bad, #408401511, no wind data up to termination pressure of 617 mb except for between 1009.6mb to 937.1 mb. The signal was good and the satellites were between 5-8 the whole flight. Launched another sonde, it also had missing wind data at the lower levels but improves with height. -Heather






























152: DAILY, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 23:55:42 GMT, Daily Report for August 2
All systems normal. Clary UPS malfunction this morning. We bypassed the Clary and plugged sounding system directly into tan box as per Lou's previous directionsEverything is running fine now.
 
12Z sonde had some problems tracking satellites this morning. Satellite service would come in and out with anywhere from 0 to 8 satellite coverage. The first sonde that we used at the 0Z launch had bad met data (Press:1211, Temp:114, RH:22)so we used another sonde for the launch.Sonde #408414100


HE tanks:11 1/5
sondes:53
balloons:58

Profiler disk write: 41.2%


Weather: Clear skies today with a slight breeze.














































151: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 22:53:18 GMT, Sounding Bahia Kino 4 August 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401407

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.98
Temp C		: 33.60
RH %		: 45.5

		For Surface Data
Pressure mb	: 1007.6
Temp C		: 33.2
RH%		: 47.8
Wind Spd m/s	: 5.1
Wind Dir deg	: 243

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Cirrus to the south, cumulus towers to the NNE, clear overhead, temperature backup from last night's low of approximately 22-23 degrees C, nice while it lasted.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 67.8
Termination Altitude km	: 19.071
Reason for Termination	: lost signal

Post-Termination Weather Description: Scattered cirrus to the SSW and above, cumulus towers, slightly larger than at launch time, to the NNE.

For Surface Data
		Pressure mb	: 1007.1
     		Temp C		: 33.016
		RH %		: 54.517
		Wspd m/s 	: 4.282
		Wdir deg	: 235.78
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

Restarted data manager at the beginning of launch because Cambell data not showing up, also paused Profiler briefly to do restart.

Clary seems to functioning fine.



























150: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 16:44:59 GMT, Sounding Bahia Kino 3 August 1800z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408401402

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.28
Temp C		: 33.46
RH %		: 41.9

		For Surface Data
Pressure mb	: 1010.8
Temp C		: 33.2
RH%		: 39.7
Wind Spd m/s	: 2.3
Wind Dir deg	: 75

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 34.1
Termination Altitude km	: 23.266
Reason for Termination	: Stopped receiving data.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1010.2
     		Temp C		: 35.296
		RH %		: 39.191
		Wspd m/s 	: 3.1207
		Wdir deg	: 218.24
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Clary back up for this launch, seems to be fine. -H






























149: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 10:49:23 GMT, Sounding Bahia Kino 3 August 1200z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401507

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.08
Temp C		: 24.19
RH %		: 911

		For Surface Data
Pressure mb	:1009.1 
Temp C		: 23.9
RH%		: 91.5
Wind Spd m/s	: 1
Wind Dir deg	: 11

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 39.3
Termination Altitude km	: 22.297
Reason for Termination	: balloon burst

Post-Termination Weather Description: mare's tail clouds to the east, clear above, temp. cool and very pleasant.

For Surface Data
		Pressure mb	: 1009.5
     		Temp C		: 21.738
		RH %		: 85.752
		Wspd m/s 	: 2.8953
		Wdir deg	: 23.67
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























148: DAILY, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 22:43:55 GMT, Daily Report for August 3
All systems normal. Clary back in system running fine.Suspect another brief power outage because Clary and data manager-Cambell display were both acting up, allis well now.Restarted data manager and paused profiler to get Cambell going again at the 0Z August 4 sounding.

4 sondes today

HE tanks:9 3/5
sondes:48
balloons:53

Profiler disk write: 44.7%

Voltage: 133.4 on Circuit #4

Weather: Cool this morning, in mid 20's, heating up to average temps., mid 30's,mostly clear skies with a few cirrus to the south and small cumulus towers building on the horizon to the NNE.


First 6Z sonde (408401511) launched only received wind data between 1009.6 to 
937.1. Satellite coverage between 5 to 8 and signal in the 70's. Terminated at 
617mb and launched a new one.Second sonde also had marginal wind data at the lower levels.











































147: SOUNDING, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 22:42:35 GMT, Sounding Bahia Kino 3 August 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401514

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.41
Temp C		: 32.18
RH %		: 67.10

		For Surface Data
Pressure mb	:1010.1 
Temp C		: 32.6
RH%		: 57.6
Wind Spd m/s	: 5.5
Wind Dir deg	: 207

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies with a slight breeze.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 124.7
Termination Altitude km	: 15.419
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1009.4
     		Temp C		: 31.996
		RH %		: 59.444
		Wspd m/s 	: 4.1284
		Wdir deg	: 204.19
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























146: SOUNDING, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 10:55:02 GMT, Sounding Bahia Kino 2 August 1200Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408414211 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.29
Temp C		: 27.71
RH %		: 86.10

		For Surface Data
Pressure mb	:1010.7 
Temp C		: 27.7
RH%		: 88.4
Wind Spd m/s	: 5.0 
Wind Dir deg	: 129

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
mostly clear skies with a line of cumulus clouds to the south
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 33.9
Termination Altitude km	: 23.219
Reason for Termination	: lost signal

Post-Termination Weather Description: line of cumulus clouds from south has 
moved in over area, also layer of stratocumulus clouds to the north and northeast

For Surface Data
		Pressure mb	: 1011.6
     		Temp C		: 26.47
		RH %		: 84.681
		Wspd m/s 	: 2.6225
		Wdir deg	: 93.432
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde did not track satellites for parts of the launch so some wind data is 
missing but most of it was received. 
































145: INFO, Site , Mon 02-Aug-2004 10:51:31 GMT, Clary UPS malfunction
When we tried to turn on the clary ups this morning, we realized it was not working so we  removed the plug and plugged it into the protection box as told by 
the roving crew on their last visit.
144: DAILY, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 22:55:25 GMT, Daily Report for August 1
All systems normal.

3 sondes today

HE tanks: 11 2/5
sondes: 56
balloons:60

Profiler disk write: 37.7%

Voltage: 135.5 on circuit #4

Weather: Overcast layer has remained from this morning although thinner and w/fewer signs of convection, strong southerly breeze.  

Ending IOP#5 w/0Z August 2 launch

2 sondes reporting unrealistic data at 6Z and 12Z on August 1, launched sondes were fine.



































143: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 22:46:51 GMT, Sounding Bahia Kino 2 August 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408413204

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.40
Temp C		: 32.89
RH %		: 54.30

		For Surface Data
Pressure mb	: 1009.6
Temp C		: 33.0
RH%		: 58.5
Wind Spd m/s	: 5.9
Wind Dir deg	: 161

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Overcast layer of stratus, stratocumulus, strong southerly breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 38.4
Termination Altitude km	: 22.642
Reason for Termination	: lost siganl

Post-Termination Weather Description: Overcast layer thicker than at lunch time,more statocumulus than stratus.

For Surface Data
		Pressure mb	: 1009.4
     		Temp C		: 30.996
		RH %		: 71.472
		Wspd m/s 	: 4.6348
		Wdir deg	: 189.03
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Bad sonde #408414100, launched different sonde, worked fine.





























142: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 16:58:36 GMT, Sounding Bahia Kino 1 August 1800Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Kino Bay
launch time UTC: 1800z
Sonde coef tape #: 408412408

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.7
Temp C		: 32.72
RH %		: 62.60

		For Surface Data
Pressure mb	: 1010.8 
Temp C		: 32.8
RH%		: 65.8
Wind Spd m/s	: 4.3
Wind Dir deg	: 170

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
mostly cloudy with cumulus clouds in all directions
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 42.7
Termination Altitude km	: 21.875
Reason for Termination	: lost signal

Post-Termination Weather Description: mostly cloudy: cumulus clouds to the north,stratus deck to the east, convection to the west, breezy

For Surface Data
		Pressure mb	: 1011.4
     		Temp C		: 32.16
		RH %		: 63.676
		Wspd m/s 	: 6.2599
		Wdir deg	: 160.65
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























141: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 10:56:03 GMT, Sounding Bahia Kino 1 August 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408413415 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.28
Temp C		: 27.57
RH %		: 86.90

		For Surface Data
Pressure mb	: 1008.90
Temp C		: 27.6
RH%		: 86.9
Wind Spd m/s	: 2.4
Wind Dir deg	: 78

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Few high stratus, stratocumulus obscuring the full moon.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 46.3
Termination Altitude km	: 21.286
Reason for Termination	: lost signal

Post-Termination Weather Description: layer of stratocum.in all directions, calm

For Surface Data
		Pressure mb	: 1008.9
     		Temp C		: 27.664
		RH %		: 87.893
		Wspd m/s 	: 1.9185
		Wdir deg	: 102.42
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Again, the first sonde, 408414103, transmitted bad data, 1076mb,8.6C, 90%RH, so we switched to a new sonde, it worked fine.




























140: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 04:37:50 GMT, Sounding Bahia Kino 1 August 0600z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408413502

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.45
Temp C		: 30.02
RH %		: 77.7

		For Surface Data
Pressure mb	: 1007.9
Temp C		: 30.2
RH%		: 77.5
Wind Spd m/s	: 4.2
Wind Dir deg	: 198

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies with some alto stratus.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 43.8
Termination Altitude km	: 21.674
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Clear skies.

For Surface Data
		Pressure mb	: 1008.7
     		Temp C		: 29.598
		RH %		: 78.205
		Wspd m/s 	: 3.3559
		Wdir deg	: 152.67
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

The first sonde, 408414104, was transmitting unrealistic data, 1077mb, -26.52 C,95% RH, so we opened another sonde and it functioned as expected. -Heather





























139: DAILY, Site ISS3 (Bahia Kino), Sat 31-Jul-2004 22:45:00 GMT, Daily Report for July 31
All systems normal.


HE tanks: 12.25
sondes: 62
balloons:64

Profiler disk write: 34.3%

Voltage:131.9 on Circuit 4

Weather: Clouds and fog from this morning have cleared up. Few cirrus to the 
south, stratocumulus to the NNE, scattered cirrus to the west, clear above.  

Starting IOP#5 w/0Z August 1 launch



































138: SOUNDING, Site ISS3 (Bahia Kino), Sat 31-Jul-2004 22:38:54 GMT, Sounding Bahia Kino 1 August 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408413411

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1004.99
Temp C		: 33.19
RH %		: 61.40

		For Surface Data
Pressure mb	: 1006.5
Temp C		: 32.6
RH%		: 67.6
Wind Spd m/s	: 5.6
Wind Dir deg	: 236

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Stratocumulus to the NNE, few cirrus to the south, cirrus to the west, clear above.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 42.6
Termination Altitude km	: 21.951
Reason for Termination	: balloon burst

Post-Termination Weather Description: Cleared up since launch time, cirrus to the west, and NNE.

For Surface Data
		Pressure mb	: 1005.7
     		Temp C		: 32.302
		RH %		: 65.646
		Wspd m/s 	: 5.2538
		Wdir deg	: 233.41
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























137: SOUNDING, Site ISS3 (Bahia Kino), Sat 31-Jul-2004 10:44:36 GMT, Sounding Bahia Kino 31 July 1200z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino	
launch time UTC: 12z
Sonde coef tape #: 408413506

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.14
Temp C		: 26.36
RH %		: 68.7

		For Surface Data
Pressure mb	: 1008.01
Temp C		: 27.5
RH%		: 67.2
Wind Spd m/s	: 1.2
Wind Dir deg	: 58

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Mostly clear skies with some strato cumulus to the NNE.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 40.2
Termination Altitude km	: 22.132
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Same as before.

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 25.108
		RH %		: 72.871
		Wspd m/s 	: 1.0904
		Wdir deg	: 51.909
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























136: DAILY, Site ISS3 (Bahia Kino), Fri 30-Jul-2004 22:56:00 GMT, Daily Report for July 30
All systems normal.


HE tanks: 12.5
sondes: 64
balloons:66

Profiler disk write: 30.8%


Weather: Clear skies today with a slight breeze. 



































135: SOUNDING, Site ISS3 (Bahia Kino), Fri 30-Jul-2004 22:40:53 GMT, Sounding Bahia Kino 31 July 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408413813

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.78
Temp C		: 32.57
RH %		: 65.6

		For Surface Data
Pressure mb	: 1006.5 
Temp C		: 33.1
RH%		: 64.9
Wind Spd m/s	: 5.2
Wind Dir deg	: 218

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies with a slight breeze.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 38.2
Termination Altitude km	: 22.622
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above with some cumulus towers to the NE.

For Surface Data
		Pressure mb	: 1005.3
     		Temp C		: 32.707
		RH %		: 61.322
		Wspd m/s 	: 5.5674
		Wdir deg	: 232.04
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























134: SOUNDING, Site ISS3 (Bahia Kino), Fri 30-Jul-2004 10:40:49 GMT, Sounding Bahia Kino 30 July 1200Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 1200z
Sonde coef tape #:408413505

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.17
Temp C		: 26.44
RH %		: 90.40

		For Surface Data
Pressure mb	:1008.1 
Temp C		: 26.5
RH%		: 92.6
Wind Spd m/s	: 1.9
Wind Dir deg	: 73

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear calm humid morning
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 29.1
Termination Altitude km	: 24.145
Reason for Termination	: lost signal 

Weather post launch: mostly clear and humid

For Surface Data
		Pressure mb	: 1008.6
     		Temp C		: 25.164
		RH %		: 94.226
		Wspd m/s 	: 2.3791
		Wdir deg	: 38.97
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------



































133: SOUNDING, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 22:36:57 GMT, Sounding Bahia Kino 30 July 0000Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0000z
Sonde coef tape #:408412405

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.33
Temp C		: 31.98
RH %		: 69.9

		For Surface Data
Pressure mb	:1008.6 
Temp C		: 32.6
RH%		: 70.3
Wind Spd m/s	: 5.5
Wind Dir deg	: 231

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
sunny and humid with convection to the east
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 118.3
Termination Altitude km	: 15.682
Reason for Termination	: lost signal suddenly

Weather post launch: sunny, humid, convection to east has decreased

For Surface Data
		Pressure mb	: 1007.9
     		Temp C		: 31.789
		RH %		: 73.027
		Wspd m/s 	: 5.3796
		Wdir deg	: 227.72
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
































132: INFO, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 20:51:48 GMT, Roving team COMMENTS ON LOS MOCHIS
Some good some bad:

 - Brad reported that the Motosat was set to "Do Not Disturb" which is why we
   could not call in from the other sites.
 - Brad also found the Fluke digital multimeter which the roving crew was
   falsely accused of removing.

!!!!!!!!!!!!!!!!!!!!
 - Two 408 sondes launched at 04 and 08 Z on July 29 didn't look good. There
are not data from ~700-180 mb for 08Z and from ~250-130 mb for 04 Z. But it
was not documented in the tklog file. The students need to pay attention!
!!!!!!!!!!!!!!!!!!!!

 - At least some of the Los Mochis crew have been trained on entering
   coefficients by hand from the paper tape.



131: INFO, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 20:36:44 GMT, Roving team notes for July 29
Today is the last day of roving duty for Steve and John. Lou and June are
here in Kino now and the plebian order of the cell phone will be bestowed
upon them in a ceremony at dinner.

IOP#4 will finish this evening.

Tasks today:

- We did another data backup to DVD of the ISS-3 workstation.
- Showed the new roving team everything we could think of
- CLARY UPS:

Things are looking up at Los Mochis. Brad reported that the Motosat was set to
"Do Not Disturb" which is why we could not call in from the other sites. Brad
also found the Fluke digital multimeter which the roving crew was falsely
accused of removing.
At least one or two of the 408 sondes has launched fine.
At least some of the Los Mochis crew have been trained on entering coefficients
by hand from the paper tape.

GLASS SYSTEM POWER
The GLASS system has been put back on the CLARY GT1000 ups which isw on 3 extension cords .
The operators have been told that if there are any problems to remove plug strip
and to put the strip into the protection box.This is because of high voltage. 
The fix sent to us by CLARY is for different model. The 1000's input voltage 
is not adjustable.

to be continued....


130: DAILY, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 17:59:08 GMT, Daily Report for July 29
All systems normal.

ISS crew visiting- Steve,John, Lou, and June.

HE tanks: 12.75
sondes: 66
balloons:68

Profiler disk write: 27.5%

Voltage: 132.7

clary ups functioning again with 3 extension cords

Weather: Lightening this morning at early launch (12Z) to the NNE, the (18Z) launch had a broken layer of cumulus above and in all directions from the site. The humidity is up, so far less wind than yesterday.


































129: SOUNDING, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 16:59:05 GMT, Sounding Bahia Kino 29 July 18Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #:408413501 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.81
Temp C		: 33.69
RH %		: 56.79

		For Surface Data
Pressure mb	: 10.12.7
Temp C		: 32.5
RH%		: 66.2
Wind Spd m/s	: 5.1
Wind Dir deg	: 149

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Broken layer of cumulus around and overhead, cloudy humid day.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 61.7
Termination Altitude km	: 19.530
Reason for Termination	: lost signal

Weather post launch:Cleared up overhead during launch, cumulus on the horizon during the launch in all directions except the SE.

For Surface Data
		Pressure mb	: 1012.3
     		Temp C		: 33.835
		RH %		: 60.541
		Wspd m/s 	: 5.2767
		Wdir deg	: 189.35
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























128: SOUNDING, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 10:51:41 GMT, Sounding Bahia Kino 29 July 1200Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 1200Z
Sonde coef tape #: 408413412

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	:1008.97 
Temp C		:27.4
RH %		: 89.6

		For Surface Data
Pressure mb	: 1010.3
Temp C		: 27.5
RH%		: 90.9
Wind Spd m/s	: 1.2
Wind Dir deg	: 103

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
 clear calm morning
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 53.1
Termination Altitude km	: 20.410
Reason for Termination	: data stopped coming in 

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1011.1
     		Temp C		: 26.473
		RH %		: 93.079
		Wspd m/s 	: 1.5086
		Wdir deg	: 15.585
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------































127: SOUNDING, Site ISS3 (Bahia Kino), Thu 29-Jul-2004 04:47:21 GMT, Sounding Bahia Kino 29 July 06Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408413800

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.39
Temp C		: 29.57
RH %		: 80.80

		For Surface Data
Pressure mb	: 1010.9 
Temp C		: 29.9
RH%		: 80.2
Wind Spd m/s	: 2.5
Wind Dir deg	: 168

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear, lightening to the NNE
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 39.6
Termination Altitude km	: 22.274
Reason for Termination	: Lost signal. 

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1011.1
     		Temp C		: 29.479
		RH %		: 79.397
		Wspd m/s 	: 2.4314
		Wdir deg	: 161.1
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























126: DAILY, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 22:50:53 GMT, Daily Report for July 28
All systems normal.

HE tanks: 13.75
sondes: 70
balloons:72

Profiler disk write: 23.9%

Voltage: 134.5

Weather: Breezy with mostly clear skies today. 
































125: SOUNDING, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 22:44:44 GMT, Sounding Bahia Kino 29 July 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408413504

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.58
Temp C		: 32.38
RH %		: 68.3

		For Surface Data
Pressure mb	: 1009.6
Temp C		: 32.6
RH%		: 67.2
Wind Spd m/s	: 6.9
Wind Dir deg	: 192

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Breezy with cumulus towers to the NE.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 58.9
Termination Altitude km	: 19.910
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1009
     		Temp C		: 31.845
		RH %		: 74.091
		Wspd m/s 	: 5.2113
		Wdir deg	: 189.92
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























124: SOUNDING, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 16:55:09 GMT, Sounding Bahia Kino 28 July 1800Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 1800z
Sonde coef tape #: 408413809

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.74
Temp C		: 33.74
RH %		: 59.00

		For Surface Data
Pressure mb	:1013.3
Temp C		: 32.6
RH%		: 64.8
Wind Spd m/s	: 7.7
Wind Dir deg	: 154

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
cumulus clouds in all directions, windy with some gusts
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 43.6
Termination Altitude km	: 21.722
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	:1012.5
     		Temp C		:33.751
		RH %		:61.781
		Wspd m/s 	:7.6189
		Wdir deg	:181.73
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------



































123: SOUNDING, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 10:47:52 GMT, Sounding Bahia Kino 28 July 1200Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 1200z
Sonde coef tape #: 408414012

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.67
Temp C		: 28.23
RH %		: 86.10

		For Surface Data
Pressure mb	:1010.2 
Temp C		: 28.3
RH%		: 85.6
Wind Spd m/s	: 3.6
Wind Dir deg	: 104

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear night, breezy at times
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 47.3
Termination Altitude km	: 21.103
Reason for Termination	: lost signal

Post-Termination Weather Description: mostly clear morning with stratus to NE

For Surface Data
		Pressure mb	: 1010.7
     		Temp C		:29.851
		RH %		: 56.997
		Wspd m/s 	:3.9618
		Wdir deg	: 174.21
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

































122: SOUNDING, Site ISS3 (Bahia Kino), Wed 28-Jul-2004 04:45:28 GMT, Sounding Bahia Kino 28 July 0600Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0600z
Sonde coef tape #: 408413207

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.19
Temp C		: 30.78
RH %		: 71.9

		For Surface Data
Pressure mb	:1009.9 
Temp C		: 31.0
RH%		: 72.6
Wind Spd m/s	: 5.2
Wind Dir deg	: 182

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
mostly clear, ligtning and cumulus clouds towards NE, breezy with sudden gusts
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 69.0
Termination Altitude km	: 18.838
Reason for Termination	: lost signal

Post-Termination Weather Description: same as above

For Surface Data
		Pressure mb	: 1010.1
     		Temp C		: 31.07
		RH %		: 64.302
		Wspd m/s 	: 3.8998
		Wdir deg	: 184.05
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------































121: SOUNDING, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 22:28:41 GMT, Sounding Bahia Kino 28 July 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408413215

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.51
Temp C		: 33.64
RH %		: 60.4

		For Surface Data
Pressure mb	: 1008.4
Temp C		: 33.1
RH%		: 63.5
Wind Spd m/s	: 7.2
Wind Dir deg	: 213

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Locally clear. Beautiful CB's to N and E.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 150
Termination Altitude km	: 14387
Reason for Termination	: Lost signal

Post-Termination Weather Description: Same as above.  2/3 Waxing moon.

For Surface Data
		Pressure mb	: 1007.8
     		Temp C		: 32.3
		RH %		: 66.9
		Wspd m/s 	: 5.3
		Wdir deg	: 213
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Winds lost at 200mB.
We did hear and interfering signal.  It appeared that the receiver jumped
to another freq. at 103.5 at the end.  Beginning freq. was 102.5.  The
direction of travel was towards the SE so it's possible that we switched
to the Hermosillo sonde.  Aspen data did look fine.




























120: INFO, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 20:36:46 GMT, Roving team notes from LORETO visit
The LORETO Glass station does not use TKLOG so we are entering a short summary
from here at ISS-3/Kino.

Roving team (Steve and John) flew Hermosillo to Loreto last Friday (July 23).
The Glass site is at the Hotel Pinta which is booked for the season.
Hotel Posada de Loreto was fine. Basic, clean, 395 pesos. It is in the
center of town and a 10-minute walk from the Pinta.

A car is not needed except for transportation to/from the airport. Katie
gave us a ride, but a taxi would have worked.

Flight info:
Aeromexico has one flight/day same each day:
 HMO to LOR: Flight AM2290 departs at 4:35pm
 LOR to HMO: Flight AM2291 departs at 9:10am
 Price was about 3700 pesos round trip (depends on day of week)

LORETO ISSUES:

MOTOSAT:
 The Motosat was not working when we arrived. It had failed following a quick
manual shutdown during a strong windstorm. After many restarts by the crew over
many days it got to the configuration screen. Per conversation with Tim we used
the point4020 software on another PC (Steve's laptop on the LAN) to set the
satellite lat/lon. It has worked ok since. A continuing issue is that there are
no other PC's on that LAN which can successfully run point4020.

REGULATOR:
 The high-pressure gauge on the Loreto regulator was inoperative, and the hose
may leak. We brought the spare regulator from Puerto Penasco. The low pressure
hose was moved from the Loreto regulator. This regulator will now screwed on
the tanks without the hose. Appears to work well, and without leaking. We also
played with the balloon size. In Kino the students measured a balloon
circumference with 34 cf. The students at Loreto cut a rope to this length.
When filled with 400 lbs helium, the curcumference matched that in Kino
closely.

GLASS PC:
 The Glass PC failed after the 12Z sounding on July 25. It appeared to be
a hard drive failure. The students told us that the setup crew had much
trouble with this PC. With reckless abandon JWM opened the laptop and noted
the HDD was loose in its tray. Further there were no screws holding
the HDD in the tray and only 1 screw holding the tray to the case.
A cardboard shim was fashoned
to reduce play of the HDD in its bracket. THe HDD was reinstalled with
a satisfying connection to the motherboard. The PC has been better behaived
since. We ran scandisk which found many "errors". Some were related to old
software (versions of the GLASS software and others). After consultation with
Tim, and over two days, we removed considerable software from this PC. We then
began to defragment the disk. This process had to be interupted several times
to launch sondes. The crew will continue to defrag between launches until
it is done. Apologies to the crew in Boulder for calling an emergency and then
fixing the problem. Ned was willing to scramble an F-18 to get us a replacement
PC.

A second problem with this PC was noted: The case fan is not working.
We are now using four Glass pylons to lift the Glass pc above the desk,
providing the possibility of ventilation below. We have also bought a fan for
the room to circulate air past the PC.

Lou is bringing a replacement pc for GLASS and should install it soon. We would
have tried running GLASS on another laptop but apparently the software can
only be run under Windows-98.

SURFACE TOWER:
 The same storm that caused the Motosat to be stowed blew down the GLASS
surface met tower. The students righted the tower and replaced it in the same
position. We tied the station to two nearby trees (in addition to the stakes
already in the sand at the tower base). It turns out that this tower had not
been working since setup. There was no communication between the GLASS pc and
the campbell. JWM worked on that and eventually made contact. But the values
coming back were clearly not calibrated. Possibly we were using the wrong DLD
file? Because we were concerned with data quality/accuracy and did not think
a continuous data stream would benefit the PI we did not pursue this further.
Data quality issues:
 - the anemometer propellor broke when the station was blown over
 - the pressure sensor has no static port, so P is affected by wind around the
Campbell box.
 - the T/RH sensors are aspirated but the fan is weak.
 - numerous trees and large buildings were clearly affecting the local flows
at the tower height.
 - the anemometer orientation was off >=8 degrees and the reported direction
was even further off indicating that the potentiometer may be rotated in the
collar, or the 'BD or ZN' boom direction/zero north are incorrect.

 GLASS expects to use the surface tower for a ground point (P,T,H,WSpd,Wdir),
not for regular time series data. Since this was not available they are simply
copying the sonde values for surface data, estimating the wind speed, and
using the anemometer vane to estimate direction. (Note that we measured the
tower black box direction to be about 8 degrees clockwise of true south).

GENERAL:
 Be aware that there is NO test equipment, few tools, and no manuals at this
site.

OTHER COMMENTS:

-- We noticed that GLASS does not aspirate the rawinsonde T/RH sensor prior to
launch. The ISS group has found this to be necessary, especially if the sensor
arm is in direct sunlight.

-- The GLASS receiving antenna is poorly positioned at this site. Its view of
the sky is blocked to the west to more than 45 degrees above the horizon by
the hotel building. This is because the coax between the GLASS rack and GLASS
amplifier, and between the amplifier and the antenna are fairly short. We saw
flights where the balloon went west and we lost signal around 300 mb because
the sonde signal was blocked by the building. We've recommended the next Roving
team bring a replacement/longer cable. Lou reported that a longer coax had to
be used for the GPS ground antenna in this installation.






119: INFO, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 20:30:46 GMT, Roving team notes
We (Steve and John) are back in Kino.

IOP#4 is due to begin this afternoon.

Did a profiler backup of days 200-208 onto CD NAME_KIN03.
The profiler was down from 1921-2022Z.

Did a data backup DVD of the ISS-3 workstation. Will bring back to Boulder.

CLARY UPS:

Hotel: we are trying the 

118: RADAR, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 20:26:27 GMT, Profiler performance
The wind profiler continues to operate well in the monsoon environment.

This morning I note a possible problem:
  There is a weak second image in the Y+ beam spectral contour plots; even
  weaker in the Y- beam. May indicate that the beam pattern is degrading
  but not enough to affect the wind measurement. We should check the
  switches carefully when back in Boulder.

117: RADAR, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 20:23:51 GMT, Profiler data backup and down time (NAME_KIN03)
Profiler backup today

Backed up the PROFILER SPC files.

VOLUME: NAME_KIN03
Days 04200-04208 (July 18-26)

Profiler down from 19:21 through 20:22 for this process.
Can read (dir) disk on GLASS-pc; ok.
Also note SPC files are present on ISS3 workstation.
Deleted backed up files.

Made two CD copies. Will take one with us. Other stays at ISS3
Now free disk space is about 1.56 GB. Disk use is about 73 MB/day.
Disk write at 20.0%.

Should be enough free space to finish the project but backups are still
needed for redundancy.

NOTE: The CD-writer would not format a disk. I rebooted the profiler PC and
then it was normal. Suspect the power failure/recovery caused some confusion
with the writer.


116: SOUNDING, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 10:45:41 GMT, Sounding Bahia Kino 27 July 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408412410

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.75
Temp C		: 26.52
RH %		: 88.0

		For Surface Data
Pressure mb	:1009.8 
Temp C		: 26.2
RH%		: 89.7
Wind Spd m/s	: 2.3
Wind Dir deg	: 52

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear starry morning, humid
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	:51.5
Termination Altitude km	: 20.591
Reason for Termination	: lost signal

Post-Termination Weather Description: layer of stratus clouds to the north, couple of random strat. cumul. clouds elsewhere.

For Surface Data
		Pressure mb	: 1010.2
     		Temp C		: 26.095
		RH %		: 87.236
		Wspd m/s 	: 1.9038
		Wdir deg	: 82.478
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good launch






























115: DAILY, Site ISS3 (Bahia Kino), Tue 27-Jul-2004 00:31:02 GMT, Daily Report for July 26
All systems normal.

HE tanks: 14.5
sondes: 76
balloons:78

Profiler disk write: 48.3%

Voltage: 136.7

Weather: Sunny, clear skies today after morning thunderstorms subsided. 






























114: SOUNDING, Site ISS3 (Bahia Kino), Mon 26-Jul-2004 22:44:03 GMT, Sounding Bahia Kino 27 July 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408413213

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.1
Temp C		: 33.06
RH %		: 60.6

		For Surface Data
Pressure mb	: 1009.2
Temp C		: 32.9
RH%		: 61.6
Wind Spd m/s	: 5.4
Wind Dir deg	: 236

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Cumulus towers in all directions with cirrus to the E, SW and above.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 71.1
Termination Altitude km	: 18.744
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 32.2
		RH %		: 58.845
		Wspd m/s 	: 5.0464
		Wdir deg	: 221.53
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























113: SOUNDING, Site ISS3 (Bahia Kino), Mon 26-Jul-2004 11:28:48 GMT, Sounding Bahia Kino 26 July 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408413211

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.94
Temp C		: 23.86
RH %		: 91.7

		For Surface Data
Pressure mb	: 1011.4
Temp C		: 23.8
RH%		: 95.4
Wind Spd m/s	: 3.8
Wind Dir deg	: 38

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Light rain.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 42.2
Termination Altitude km	: 21.852
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Strato cumulus in all directions 5/8 sky coverage.

For Surface Data
		Pressure mb	: 1012
     		Temp C		: 24.177
		RH %		: 91.961
		Wspd m/s 	: 3.1991
		Wdir deg	: 13.278
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Late launch due to problem with the sounding computer and receiver when we arrived this morning.




























112: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Mon 26-Jul-2004 11:24:48 GMT, Power Outage!
Power outages last night throughout Kino. When we got in this morning the Clary was beeping. We turned it off and then the receiver and sounding system would not turn back on. We called Lou and he advised us to remove the Clary from the system and plug the sounding system and receiver directly into the beige box with red light. Sounding system started up successfully.



Voltage: 138.4















111: DAILY, Site ISS3 (Bahia Kino), Sun 25-Jul-2004 23:46:41 GMT, Daily Report for July 25
All systems normal.

HE tanks: 14.75
sondes: 78
balloons:79

Profiler disk write: 44.8%


Weather: Sunny, clear skies all day today with convection firing up to the west.
































110: SOUNDING, Site ISS3 (Bahia Kino), Sun 25-Jul-2004 22:38:28 GMT, Sounding Bahia Kino 26 July 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408413212

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.65
Temp C		: 32.30
RH %		: 66.10

		For Surface Data
Pressure mb	:1010.4 
Temp C		: 32.0
RH%		: 67.3
Wind Spd m/s	: 6.7
Wind Dir deg	: 219

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Sunny, calm with convection firing up to the west.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 304.3
Termination Altitude km	: 9.65
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Sunny and breezy. Convection has moved to the north.

For Surface Data
		Pressure mb	: 1010
     		Temp C		: 31.21
		RH %		: 70.682
		Wspd m/s 	: 4.3473
		Wdir deg	: 243.53
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
The accent rate of the balloon was very slow between 1-2 m/s. Called roving crew to get advice about launching a new balloon, but were not able to get a hold of them or Lou and we thought it was to late to launch another one. 

 



























109: SOUNDING, Site ISS3 (Bahia Kino), Sun 25-Jul-2004 10:40:09 GMT, Sounding Bahia Kino 25 July 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408412400

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.64
Temp C		: 23.33
RH %		: 71.50

		For Surface Data
Pressure mb	:1012.7 
Temp C		: 25.1
RH%		: 82.9
Wind Spd m/s	:3.3 
Wind Dir deg    :31

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
mostly clear skies with light winds
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 50.9
Termination Altitude km	: 20.666
Reason for Termination	: popped

Post-Termination Weather Description: 
partly cloudy, calm
For Surface Data
		Pressure mb	: 1012.7
     		Temp C		: 24.628
		RH %		: 89.301
		Wspd m/s 	: 3.1582
		Wdir deg	: 22.601
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
































108: DAILY, Site ISS3 (Bahia Kino), Sat 24-Jul-2004 22:55:22 GMT, Daily Report for July 24
All systems normal.

HE tanks: 15 
sondes: 80
balloons:81

Profiler disk write: 41.3%

Voltage: 134.5

Weather: Thunderstorms and light rain at the morning launch, rained harder 
around 7am, tapering off midmorning. Sunny this afternoon with a line of cumuluson the horizon from the NW to the NE. High cirrus to the SW. 





























107: SOUNDING, Site ISS3 (Bahia Kino), Sat 24-Jul-2004 22:37:04 GMT, Sounding Bahia Kino 25 July 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408412403
------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	:1009.26 
Temp C		: 31.62
RH %		: 65.50

		For Surface Data
Pressure mb	:1010.5 
Temp C		: 31.9
RH%		: 64.5
Wind Spd m/s	: 5.2
Wind Dir deg	: 228

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Cirrus to the southwest, Cumulus towers along the horizon from the NW to the NE,Clear above.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 32.2
Termination Altitude km	: 23.707
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1009.9
     		Temp C		: 31.165
		RH %		: 66.728
		Wspd m/s 	: 4.5547
		Wdir deg	: 228.6
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























106: SOUNDING, Site ISS3 (Bahia Kino), Sat 24-Jul-2004 10:50:37 GMT, Sounding Bahia Kino 24 July 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408413804

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.55
Temp C		: 27.81
RH %		: 75.40

		For Surface Data
Pressure mb	: 1010.4
Temp C		: 28.3
RH%		: 80.2
Wind Spd m/s	: 5.0
Wind Dir deg	: 60

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Lightening flashes above, can hear thunder.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 83.2
Termination Altitude km	: 17.673
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Overcast with thunder and lightning.

For Surface Data
		Pressure mb	: 1012.1
     		Temp C		: 25.8
		RH %		: 82.51
		Wspd m/s 	: 9.1052
		Wdir deg	: 55.694
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























105: DAILY, Site ISS3 (Bahia Kino), Fri 23-Jul-2004 23:04:29 GMT, Daily Report for July 23
All systems normal except for satellite link up- going through the cycling process right now. We had a brief, approx. one minute, power outage earlier today around 12:30pm. It was so brief that nothing lost power, but now the sat link is acting up. Turned sat system off for one minute, didn't work. Now trying for a longer period of time, probably an hour to see if that will fix the problem.This doesn't seem  to be a result of any of the DICTUS folks, just a local power outage
Called Roving Crew and informed them of outage.Powered down for an hour, restarted, it worked.

HE tanks: 15 
sondes: 82
balloons:83

Profiler disk write: 37.8%

Voltage: 134.4

Weather: The overcast stratocumulus layer from this mornig has cleared to cirrusoverhead. The local terrain, or mountains (~900 to 1000 ft.) to our west have a few cumulus clouds hanging overhead.




























104: SOUNDING, Site ISS3 (Bahia Kino), Fri 23-Jul-2004 22:44:12 GMT, Sounding Bahia Kino 24 July 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408412401

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.2
Temp C		: 31.15
RH %		: 67.7

		For Surface Data
Pressure mb	: 1007.7
Temp C		: 32.1
RH%		: 67.8
Wind Spd m/s	: 5.6
Wind Dir deg	: 188

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Cirrus above, cumulus on the horizon N and East, Cumulus over local terrain to the west.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 41.5
Termination Altitude km	: 22.101
Reason for Termination	: lost signal

Post-Termination Weather Description: same as above

For Surface Data
		Pressure mb	: 1007.4
     		Temp C		: 30.929
		RH %		: 68.345
		Wspd m/s 	: 7.0537
		Wdir deg	: 175.63
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























103: SOUNDING, Site ISS3 (Bahia Kino), Fri 23-Jul-2004 10:42:56 GMT, Sounding Bahia Kino 23 July 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408413200

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.36
Temp C		: 26.97
RH %		: 72.8

		For Surface Data
Pressure mb	: 1008.0
Temp C		: 27.1
RH%		: 70.9
Wind Spd m/s	: 2.5
Wind Dir deg	: 78

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Light rain at the time of launch. Lightning in the distance to the SE, closer than usual.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 74.4
Termination Altitude km	: 18.351
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: No longer raining. Overcast stratocumulus.

For Surface Data
		Pressure mb	: 1009.3
     		Temp C		: 26.047
		RH %		: 76.436
		Wspd m/s 	: 3.6923
		Wdir deg	: 84.009
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























102: DAILY, Site ISS3 (Bahia Kino), Fri 23-Jul-2004 00:35:55 GMT, Daily Report for July 22
All systems normal. Profiler is now working fine.

HE tanks: 15 1/2

Will update balloon and sonde inventory tomorrow as we have some boxes back at the house.

Mostly cloudy 6/8 oktas. Has been overcast for most of the day and the seas have been up.

Profiler disk write: 34.6%

Voltage: 134.4



























101: SOUNDING, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 22:51:24 GMT, Sounding Bahia Kino 23 July, 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401305

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.59
Temp C		: 32.58
RH %		: 62.3

		For Surface Data
Pressure mb	: 1008.2
Temp C		: 33.1
RH%		: 60.8
Wind Spd m/s	: 5.3
Wind Dir deg	: 176

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	7 to 8 oktas coverage for most of the day.  Right now, 6 oktas.  Waves up to 10 ft today which has only happened one other time.  

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 
Termination Altitude km	: 
Reason for Termination	: 

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




























100: RADAR, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 18:39:33 GMT, Profiler failure
The profiler here at Kino stopped working around the time of the rawinsonde
launch at 17Z. The symptom was no Tx power. Receiver sample comb looked fine,
but also the Rx noise level may have been weak.

Powering down the RX/TX and Interface boxes and restarting the PC solved it.
Also, checked all cables and they looked fine. Not sure of the cause.
99: INFO, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 18:34:47 GMT, Roving team notes: Thursday July 22
Steve and John are stopping by to drop our luggage before a flight to Loreto
this afternoon.

The profiler failed sometime around 17:30. It appeared the TX was not
transmitting. RX sample comb was ok. Solved by powering down RX/TX and
interface boxes, rebooting PC. Checked cable connections. Then it worked.
Good news since our flight leaves in a couple of hours.

All else looks great here.




98: SOUNDING, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 16:44:49 GMT, Sounding Bahia Kino 22 July 18Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408401400

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.73
Temp C		: 31.93
RH %		: 61.10

		For Surface Data
Pressure mb	: 1011.5
Temp C		: 31.9
RH%		: 60.5
Wind Spd m/s	: 6
Wind Dir deg	: 165

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
ALtostratus to the SSW, altocumulus to the NNW
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 37.6
Termination Altitude km	: 22.7
Reason for Termination	: balloon burst

Post-Termination Weather Description: 
same as above

For Surface Data
		Pressure mb	: 1010.5
     		Temp C		: 32.976
		RH %		: 58.351
		Wspd m/s 	: 7.4229
		Wdir deg	: 179.56
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

Profiler transmitter wasn't sending data for about forty-five minutes just afterthe balloon launched.




























97: SOUNDING, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 10:42:18 GMT, Sounding Bahia Kino 22 July 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408401508

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.59
Temp C		: 29.77
RH %		: 84.50

		For Surface Data
Pressure mb	: 1008.7
Temp C		: 29.7
RH%		: 82.1
Wind Spd m/s	: 5.3
Wind Dir deg	: 121

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
scattered clouds overhead

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 41.0
Termination Altitude km	: 21.997
Reason for Termination	: balloon burst

Post-Termination Weather Description: Low level stratocumulus, mostly to the SSW,hazy to the west

For Surface Data
		Pressure mb	: 1010
     		Temp C		: 29.549
		RH %		: 75.751
		Wspd m/s 	: 7.0913
		Wdir deg	: 119.69
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























96: SOUNDING, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 04:52:18 GMT, Sounding Bahia Kino 22 July 6Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 06Z
Sonde coef tape #: 408401301

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.51
Temp C		: 30.33
RH %		: 77.9

		For Surface Data
Pressure mb	: 1008.7
Temp C		: 30.2
RH%		: 78.6
Wind Spd m/s	: 3.3
Wind Dir deg	:174 

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
few scattered clouds above
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 35.1
Termination Altitude km	: 23.1
Reason for Termination	: balloon burst

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 29.82
		RH %		: 75.03
		Wspd m/s 	: 3.3983
		Wdir deg	: 177.28
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























95: DAILY, Site ISS3 (Bahia Kino), Thu 22-Jul-2004 04:49:00 GMT, Daily Report for July 21
All systems normal.

Paused profiler while restarting data manager to get surface met to work before 0Z launch today- few minutes data missing.

Partly cludy this morning clearing to a few cirrus to the south, convective towers on the horizon to the north. A few scattered clouds overhead at time of 06Z launch.

Sonde vs surface station pressure: we've been waiting 5 to 10 minutes to see if the sonde pressure would ever stabilize to be same as the surface met station and have not found it to do so. The sounde almost always seems to be one millibar lower than the met station at the launch time regardless of the wait time. 

Profiler disk write: 31.7%

Voltage: 133.5


























94: SOUNDING, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 22:37:00 GMT, Sounding Bahia Kino 22 July 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401300

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.96
Temp C		: 32.44
RH %		: 68.40

		For Surface Data
Pressure mb	: 1007.9
Temp C		: 32.5
RH%		: 69.7
Wind Spd m/s	: 5.7
Wind Dir deg	: 202

Pre-Launch		Note conditions not observable by automatic systems
Weather Description
Cumulus towers to the north, few high cirrus to the south	

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 31.4
Termination Altitude km	: 23.9
Reason for Termination	: boom

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1006.9
     		Temp C		: 32.1
		RH %		: 69.0
		Wspd m/s 	: 4.47
		Wdir deg	: 194.7
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

Restarted data manager before launch to get surface data to start coming in, also paused profiler momentarily during this process. 



























93: SOUNDING, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 17:47:00 GMT, Sounding Bahia Kino 21 July 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino	
launch time UTC: 18z
Sonde coef tape #: 408401404

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.14
Temp C		: 32.87
RH %		: 69.8

		For Surface Data
Pressure mb	: 1010.8
Temp C		: 33.2
RH%		: 62
Wind Spd m/s	: 5.8
Wind Dir deg	: 200

Pre-Launch		Note conditions not observable by automatic systems
Scattered Cirrus.	

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 33.9
Termination Altitude km	: 23.3
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1010.4
     		Temp C		: 33.984
		RH %		: 55.291
		Wspd m/s 	: 5.587
		Wdir deg	: 208.54
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Random stop by police on the way in this morning caused our launch to be delayed.





























92: SOUNDING, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 10:46:51 GMT, Sounding Bahia Kino 21 July 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408401310 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	:1009.52 
Temp C		: 29.37
RH %		:71.80 

		For Surface Data
Pressure mb	: 1010.9
Temp C		: 29.5
RH%		: 72.6
Wind Spd m/5.6s	: 5.6
Wind Dir deg	: 153 

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
lightening to the NNE
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 50.4
Termination Altitude km	: 20.705
Reason for Termination	: Balloon Burst

Post-Termination Weather Description: Overcast with stratocumulus.Sky coverage 6/8. Hazey to the SSW.

For Surface Data
		Pressure mb	: 1010.5
     		Temp C		: 28.916
		RH %		: 75.965
		Wspd m/s 	: 3.7299
		Wdir deg	: 156.71
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























91: SOUNDING, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 04:41:04 GMT, Sounding Bahia Kino 21 July, 6z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408401413

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.97
Temp C		: 31.85
RH %		: 66.1

		For Surface Data
Pressure mb	: 1010.8
Temp C		: 31.8
RH%		: 68.3
Wind Spd m/s	: 6.6
Wind Dir deg	: 158

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear but windy.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 82.9
Termination Altitude km	: 17.8
Reason for Termination	: Balloon burst

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1010.3
     		Temp C		: 31.467
		RH %		: 55.4
		Wspd m/s 	: 3.0962
		Wdir deg	: 166.7
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























90: DAILY, Site ISS3 (Bahia Kino), Wed 21-Jul-2004 00:25:26 GMT, Daily Report for July 20
All systems normal.

Convective towers to the north on the horizon.

Profiler disk write: 27.6%

Voltage: 135.4























89: SOUNDING, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 22:40:49 GMT, Sounding Bahia Kino 21 July 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401309

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.34
Temp C		: 32.92
RH %		: 66.50

		For Surface Data
Pressure mb	: 1007.1 
Temp C		: 33.6
RH%		: 68.4
Wind Spd m/s	: 5.7
Wind Dir deg	: 215

Pre-Launch		Note conditions not observable by automatic systems
Weather Description   Clear as can be.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 76.8
Termination Altitude km	: 18.3
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1006.7
     		Temp C		: 33.222
		RH %		: 69.5
		Wspd m/s 	: 5.7275
		Wdir deg	: 204.17
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























88: SOUNDING, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 16:49:50 GMT, Sounding Bahia Kino 20 July 18Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC:18Z 
Sonde coef tape #: 408401304

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.54
Temp C		: 34.84
RH %		: 54.20

		For Surface Data
Pressure mb	: 1010.6
Temp C		: 34.3
RH%		: 55.1
Wind Spd m/s	: 3.1
Wind Dir deg	: 222

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 30.5
Termination Altitude km	: 24
Reason for Termination	: Lost signal.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1009.8
     		Temp C		: 34.13
		RH %		: 69.25
		Wspd m/s 	: 5.64
		Wdir deg	: 214
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























87: SOUNDING, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 10:52:34 GMT, Sounding Bahia Kino 20 July 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bhia Kino
launch time UTC: 12Z
Sonde coef tape #: 408401105

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.47
Temp C		: 29.24
RH %		: 84.2

		For Surface Data
Pressure mb	: 1008.7
Temp C		: 29.3
RH%		: 85.4
Wind Spd m/s	: 2.5
Wind Dir deg	: 100

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 44
Termination Altitude km	: 21.4
Reason for Termination	: Signal Faded

Post-Termination Weather Description: Lightly scattered cirrus.

For Surface Data
		Pressure mb	: 1009.6
     		Temp C		: 27.7
		RH %		: 86.4
		Wspd m/s 	: 3.44
		Wdir deg	: 66.4
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























86: SOUNDING, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 04:43:25 GMT, Sounding Bahia Kino 20 July 06Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 06Z
Sonde coef tape #: 408401109

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.45
Temp C		: 30.63
RH %		: 84.10

		For Surface Data
Pressure mb	: 1009.6
Temp C		: 30.5
RH%		: 84.4
Wind Spd m/s	: 3.1
Wind Dir deg	: 239

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear w/ light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 36.5
Termination Altitude km	: 22.811
Reason for Termination	: balloon burst

Post-Termination Weather Description: Same as above

For Surface Data
		Pressure mb	: 1009.5
     		Temp C		: 30.049
		RH %		: 85.579
		Wspd m/s 	: 1.9022
		Wdir deg	: 200.2
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

Cambell not displaying data before launch or after. Restart of the data manager seemed to resolve this problem- space in data from approximately 6 to 7 UTC according to display.






























85: DAILY, Site ISS3 (Bahia Kino), Tue 20-Jul-2004 00:44:20 GMT, Daily Report for July 19
Skies are clear with the usual evidence of convection to the North, although it appears unorganized at this time.

Computers,satellite, profiler, RASS and surface tower functioning as expected.

We launched 2 sondes for the 0Z sounding as the first one had a weak signal and no wind data coming in. 

Campbell not recording at time of 6z launch. Restarted Data Management computer and all seems to be working fine.Space in display data from approximately 6 to 7  UTC

Profiler disk write: 24.2%

Voltage: 135.6






















84: SOUNDING, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 22:46:30 GMT, Sounding Bahia Kino 20 July 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 402401504

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.02
Temp C		: 32.82
RH %		: 69.30

		For Surface Data
Pressure mb	: 1008.8
Temp C		: 33
RH%		: 67.2
Wind Spd m/s	: 5.8
Wind Dir deg	: 207

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
scattered cirrus to the south and overhead, cumulus on the horizon to the north.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 44.4
Termination Altitude km	: 21.683
Reason for Termination	: lost signal

Post-Termination Weather Description: Clear with convection to the north.

For Surface Data
		Pressure mb	: 1008
     		Temp C		: 32.151
		RH %		: 70.125
		Wspd m/s 	: 5.8663
		Wdir deg	: 215.95
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
First sonde (serial #:408401412) was terminated because we were not receiving wind data and the signal was weak. 































83: SOUNDING, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 10:48:43 GMT, Sounding Bahia Kino 19 July 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408401408

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.4
Temp C		: 28.9
RH %		: 85.7

		For Surface Data
Pressure mb	: 1010.4
Temp C		: 28.812
RH%		: 85.384
Wind Spd m/s	: 2.812
Wind Dir deg	: 104.75

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear with lightning off to the east.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 33.9
Termination Altitude km	: 23.201
Reason for Termination	: balloon bust

Post-Termination Weather Description: Cirrus to the west, Strato cumulus to the east, nice sunrise.

For Surface Data
		Pressure mb	: 1011.3
     		Temp C		: 27.279
		RH %		: 88.263
		Wspd m/s 	: 1.8989
		Wdir deg	: 70.126
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























82: SOUNDING, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 01:09:04 GMT, LNA DC voltage measured
We measured the LNA dc voltage out from the injector block:
11.4 was first seen at power up of rack....(was that correct?)
7.1 V was observed during sounding.

The system here has produced good soundings so it isn't worth
changing, but the voltage may be a bit shy and could cause
difficulty perhaps in a more noisy location elsewhere.

81: SOUNDING, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 00:55:22 GMT, Clary GT1000 UPS running for GAOS
7/19/ 00:45 Reconfigured Power for GOAS computer/rack.

This system hasn't been on a UPS and consequently was getting
clobbered when the 'authorities' shut off trailer power.
This will take effect for the sounding on 7/19 12:00Z

In an attempt to allow the system to be backed up, we put the
UPS onto the surge supressor via 2-100' extension cords.  This
appears to work and the UPS is happier and hasn't shutdown due to
the overvoltage problem the setup crew encountered.
(NOTE the Clary specs are somewhat contradictory indicating in 1 place
132 and in another 135 as the max-input VAC.
NOTE the first time we tried the UPS was by itself plugged directly
into the wall outlet and it was fine.  Specs might be conservative?
NOTE the line voltage today is 134.5 so maybe the electrician 
improved the situation.)

Anyway we measured the drop from wall into UPS:
using the 4A halogen light: from 134.5 to ~127.
GAOS PC/Rack: from 134.5 to 131.5 on input to UPS.
This implies that the load is roughly ~2A for GAOS stuff.

The GAOS computer will be shutdown between soundings from now
on per Lou.   Rebooting the system now on the UPS worked just fine.
I grabbed the url for Clary UPS and downloaded the desc.sheet.

The crew was shown how to reconfigure to the way it was before if
that should be needed or desired.




80: DAILY, Site ISS3 (Bahia Kino), Mon 19-Jul-2004 00:33:25 GMT, Daily report for July 18
Partly cloudy to overcast for most of today, clearing this afternoon, then reforming after the 0Z sounding.

Steve and John stopped by to back up Profiler data, play with the electricity, and check on the IR radiation.

Profiler disk write: 20.7%

134.5 volts







79: SOUNDING, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 22:35:54 GMT, Sounding Bahia Kino 19 July 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401512

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.8
Temp C		: 32.34
RH %		: 69.3
		For Surface Data
Pressure mb	: 1009.5
Temp C		: 32.4
RH%		: 68.7
Wind Spd m/s	: 6.1
Wind Dir deg	: 208

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Cirrostratus to the SSW, cumulus towers to the north.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 57.2
Termination Altitude km	: 20.1
Reason for Termination	: lost signal

Post-Termination Weather Description: 
5/8 sky coverage. Stratocumulus in all directions, cumulus towers to the north have degraded.

For Surface Data
		Pressure mb	: 1008.9
     		Temp C		: 32.704
		RH %		: 65.071
		Wspd m/s 	: 4.8732
		Wdir deg	: 206.17
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




























78: INFO, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 19:40:09 GMT, Roving team report for July 18
We are back in Kino for a day.

PROFILER DATA BACKUP:
Backed up Profiler SPC files onto two CD's. Two copies of each, one for
the trailer and one to take home. The profiler was down for an hour during
the process. 1705-1803Z. Note that there is about 1.5GB free so good for
almost another 3 weeks. Disk is about 19% full (there is a mystery of what
is taking up about 400 MB of space on D:)

CLASS RECEIVER:
Checked the voltage on the CLASS pre-amp under load. 11.37 volts which is
fine. Much better than Los Moches was. ALso checked T-dome and T-case wiring
is correct. LATER: Checked the pre-amp again during a sounding and found
a lower voltage. Some effect of having the RF in the circuit? Conclusion is
is not to change the class receiver.

POWER
Line voltage to ISS is still too high at 134.2 V. JWM set up a workaround.
We have the UPS preceeded by two 100-foot extension cords to drop the voltage
to within the UPS limits.

ISS3 WORKSTATION BACKUP
Ran data-backup script again. Taking DVD back to Boulder.

77: SURFACE, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 18:17:26 GMT, IRT down during quick check.
We checked the IR wiring here (similar to at Los Moches).
6L : T-dome
6H : T-case
This agrees with Steve Semmer's wiring diagram, and Gordon's notes for
Puerto Penasco, and also Los Moches after we switched those.

The sensor was disconnected from 19:20-19:35 Z.

76: RADAR, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 18:05:47 GMT, Profiler data backup and down time
Profiler backup today

Backed up the PROFILER SPC files.

VOLUME: NAME_KIN01
Days 04186-04195 (July 4-13)
Also backed up /data/test files directory

VOLUME: NAME_KIN02
Days 04196-04199 (July 14-17)

Profiler down from 17:05 through 18:03 for this process.
Can read (dir) disk on GLASS-pc; ok.
Also note SPC files are present on ISS3 workstation.
Deleted backed up files.

Made two CD copies. Will take one with us. Other stays at ISS3
Now free disk space is about 1.50 GB. Disk use is about 73 MB/day.
Disk write at 19.8%.

I don't understand the extra disk usage on the D: drive. There appears to
be less than 100 MB on the disk, but properties reports about 500 MB used.
Still enough free space for about 3 weeks.
75: SOUNDING, Site ISS3 (Bahia Kino), Sun 18-Jul-2004 10:48:07 GMT, Sounding Bahia Kino 18 July 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12 Z
Sonde coef tape #: 408401101

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.25
Temp C		: 27.94
RH %		: 87

		For Surface Data
Pressure mb	: 1010.6
Temp C		: 27.9
RH%		: 86.8
Wind Spd m/s	: 2.4
Wind Dir deg	: 88

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Clear skys, no wind.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 48.5
Termination Altitude km	: 21.6
Reason for Termination	: balloon burst

Post-Termination Weather Description:

Scattered altocumulus.

For Surface Data
		Pressure mb	: 1011.7
     		Temp C		: 27.549
		RH %		: 87.327
		Wspd m/s 	: 1.9006
		Wdir deg	: 54.61
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------





























74: DAILY, Site ISS3 (Bahia Kino), Sat 17-Jul-2004 23:14:57 GMT, Daily report for July 17
Conditions last night were very abnormal, see 17 July 12 z sounding for detailed report. 

Satellite out last night until approx. 4:00 am this morning. Got it running by rebooting the Motostat and laptop computer. Because of this 0z sounding for July 17 was not e-mailed until this morning after 12z launch.

Profiler disk write: 56.8%

133.3 volts






73: SOUNDING, Site ISS3 (Bahia Kino), Sat 17-Jul-2004 22:53:23 GMT, Sounding Bahia Kino 18 July 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino	
launch time UTC: 0z
Sonde coef tape #: 408401005

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009
Temp C		: 31.9
RH %		: 67

		For Surface Data
Pressure mb	: 1009
Temp C		: 32.6
RH%		: 68.5
Wind Spd m/s	: 7.1
Wind Dir deg	: 204

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Convective towers to the N.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 39.9
Termination Altitude km	: 22.4
Reason for Termination	: lost signal

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1009
     		Temp C		: 31.392
		RH %		: 70.26
		Wspd m/s 	: 5.06
		Wdir deg	: 211
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






























72: SOUNDING, Site ISS3 (Bahia Kino), Sat 17-Jul-2004 10:59:09 GMT, Sounding Bahia Kino July 17th, 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401113

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.3
Temp C		: 29.56
RH %		: 68.9

		For Surface Data
Pressure mb	: 1009.0
Temp C		: 29.8
RH%		: 69.2
Wind Spd m/s	: 2.4
Wind Dir deg	: 241

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	I happened to be up last night when the front came through and it was something spectacular.  I would estimate surface gusts between 40-50kt from the south with sustained winds of 30kt and above and visibility less than a mile due to massive amounts of sand for about 30 minutes(beginning at about 8z).  Now all is calm and clear. 

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 44.8
Termination Altitude km	: 21.5
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Scattered patches of altocumulus.

For Surface Data
		Pressure mb	: 1010.3
     		Temp C		: 27.311
		RH %		: 73.577
		Wspd m/s 	: 3.03
		Wdir deg	: 108.2
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




























71: SOUNDING, Site ISS3 (Bahia Kino), Sat 17-Jul-2004 01:11:32 GMT, Sounding Bahia Kino 17 July 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:Bahia Kino
launch time UTC: 00Z
Sonde coef tape #: 408401313

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.62
Temp C		: 32.45
RH %		: 64.80

		For Surface Data
Pressure mb	: 1006.6
Temp C		: 32.5
RH%		: 65.7
Wind Spd m/s	: 4.4
Wind Dir deg	: 227

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Cumulus towers on the horizon to the NNE. High cirrus on the horizon to the SSW. Sky coverage 1/8. Clear above immediate area.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 62.2
Termination Altitude km	: 19.138
Reason for Termination	: lost signal

Post-Termination Weather Description: Lightening to the Northe and East, cirrus to the west.

For Surface Data
		Pressure mb	: 1007.3
     		Temp C		: 31.16
		RH %		: 76.855
		Wspd m/s 	: 3.9079
		Wdir deg	: 230.66
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

Sonde launched late at due to power outage at approximately 1:00 -1:30pm local time and not turned on until approximately 6pm local time.

Launch time 6:45 pm.

Having problems with our satellite link.




























70: DAILY, Site ISS3 (Bahia Kino), Fri 16-Jul-2004 16:24:40 GMT, Daily Report for July 16
Power status:
Stopped by site this morning at 9AM to speak with the local electricians. They were not working. I spoke to the manager of the DICTUS site, he didn't know when they would be working but said he would tell us if he saw them working. Will have to keep checking on the site every few hours to try to catch them before they cut the power- most likely this will occur during the afternoon.

Brad waited at the site for an hour while I went back to the Hacienda, the electricians finally showed up at around 11AM. I spoke with them again and they told me they did not need to turn off the electricity today but possibly on Monday afternoon. They promised to give us warning before cutting the power.

Things didn't go as planned, the power was turned off on us at approximately 1:00-1:30 pm today. The electricians did try to contact us before hand but left no message. I am going to email Ramon, the manger of the DICTUS site, and tactfullystress that we need more notice about future power outages as well considerationof our launch schedule.

The power was restored at approximately 6-6:15 pm local time, we launched the sonde at approximately 6:45 pm local time.

Current weather: Overcast after this mornings launch, cleared off considerably. Only cumulus towers to the NNW, cirrus to the SSW.

Computers, profiler, RASS and surface tower functioning as expected.

Having some difficulty with our satellite link. Contacted Lou, will contact again if issue doesn't resolve itself.

Profiler disk write: 53.6%

The ISS roving team, Steve and John, is planning on heading this way either tomorrow or the next day.




















69: SOUNDING, Site ISS3 (Bahia Kino), Fri 16-Jul-2004 10:52:08 GMT, Sounding Bahia Kino 16 July 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401009

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.03
Temp C		: 28.68
RH %		: 54.7

		For Surface Data
Pressure mb	: 1009.2
Temp C		: 28.7
RH%		: 54.7
Wind Spd m/s	: 1
Wind Dir deg	: 9

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies with some lightning on the horizon to the SSW.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 42
Termination Altitude km	: 21.829
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Stratocumulus in all directions. Clearest in the NE. About 5/8 sky coverage.

For Surface Data
		Pressure mb	: 1009.8
     		Temp C		: 28.264
		RH %		: 61.492
		Wspd m/s 	: 1.8712
		Wdir deg	: 310.29
------------------------------------------------------------------------------
COMMENTS (10 second data is now updating.)
--------




























68: DAILY, Site ISS3 (Bahia Kino), Fri 16-Jul-2004 00:33:57 GMT, Daily report July 15 and Power Outage Wrap-up
Everything is on and working after power failure.  We had a tough time communicating with the electricians but determined with the help of the roving crew that since this was not an IOP that it wasn't worth the risk of losing another sonde due to another power failure.  Tomorrow we will power down after our 12z launch due to the replacement of the power lines at the site.

Meteorological conditions are as follows:
  At time of initial launch we had numerous convective towers in the mature stage over the water for the first time.  I was able to observe lightning and surface winds were the strongest yet.  At the current time all towers have dissipated and only cirrus clouds remain.

Voltage in the trailer was recorded after the power outage at 135.4 volts which is the highest that I have yet to measure.

















67: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Fri 16-Jul-2004 00:11:22 GMT, Power Outage!
For our 0z launch on July 16th we launched on time.  However, at approximately 750mb we had a power failure and lost everything.  At the Dictus site they are in the process of installing new power lines and we were given no heads up as to this outage.  It is currently 0015z (5:15 local) and we have half an hour to get off the balloon.  We talked with the electricians and it seems as though this may happen again as they are here working until 6:30 local time.  Tomorrow they plan on switching all electricity lines in the morning.  It seems that we will still be able to execute our launches as we are here from 3:30 to about 6:30 and they plan to begin at 8:00.  Our question has to do with the possibility of powering down equipment tomorrow due to the power outage.  We don't know how long it will last but will try to find out.  Our cell phone wasn't cooperating for a while and we were unable to contact the roving team, Los Mochis, or Puerto Penasco.  Lindsey at the Loreto site is working on finding someone to help us out.  As of now we have decided not to risk another launch incase of another power failure and we will wait to hear something different.  We are at the site and this is the best form of communication that we have at the current time.

















66: SOUNDING, Site ISS3 (Bahia Kino), Thu 15-Jul-2004 22:35:53 GMT, Sounding Bahia Kino 16 July 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 00Z
Sonde coef tape #:408401500

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.45
Temp C		: 31.97
RH %		: 62

		For Surface Data
Pressure mb	:1009.9 
Temp C		: 32
RH%		: 65.1
Wind Spd m/s	: 5.7
Wind Dir deg	: 243

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
Convection present in all directions, including over the water to the WSW, mostly clear over head.
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 
Termination Altitude km	: 
Reason for Termination	: 

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (Power outage just after launch at 2308, no telling when it will be back on.)
--------


























65: SOUNDING, Site ISS3 (Bahia Kino), Thu 15-Jul-2004 10:56:52 GMT, Sounding Bahia Kino 15 July 12Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408401409

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1012.21
Temp C		: 27.8
RH %		: 82.1

		For Surface Data
Pressure mb	:1013.2 
Temp C		: 27.6
RH%		: 83.5
Wind Spd m/s	:.4 
Wind Dir deg	: 308

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
partly cloudy
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 53.6
Termination Altitude km	: 20.3
Reason for Termination	: balloon burst

Post-Termination Weather Description: overcast, 7/8 sky coverage


For Surface Data
		Pressure mb	: 1013.5
     		Temp C		: 27.224
		RH %		: 82.14
		Wspd m/s 	: .6478
		Wdir deg	: 334.87
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

10 second data still frozen























64: DAILY, Site ISS3 (Bahia Kino), Thu 15-Jul-2004 00:41:20 GMT, Daily report for July 15
Current weather: 

Computers, profiler, RASS and surface tower functioning as expected.


Profiler disk write: 47.0%

Still not receiving 10 second data for sounding. Raw met data is comming in fineand the soundings looked fine.

Awesome convective processes today.  Numerous updrafts began to form but lack of speed shear prevented storm genesis.  Hopefully they will return tonight.


















63: SOUNDING, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 22:47:59 GMT, Sounding Bahia Kino 15 July 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #:408401201

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.11
Temp C		: 31.64
RH %		: 65.7

		For Surface Data
Pressure mb	: 1012.6
Temp C		: 31.9
RH%		: 66.4
Wind Spd m/s	: 5.6
Wind Dir deg	: 214

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Convection is present all around.  One tower in the southwest, one immaculate tower due north-northwest, and several in the dissipation stages.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 38.6
Termination Altitude km	: 22.5
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Overcast with altocumulus.

For Surface Data
		Pressure mb	: 1012.5
     		Temp C		: 30.273
		RH %		: 74.962
		Wspd m/s 	: 5.7405
		Wdir deg	: 207.76
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

























62: SOUNDING, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 16:55:06 GMT, Sounding Bahia Kino 14 July 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 18z
Sonde coef tape #:408401405

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1014.22
Temp C		: 30.6
RH %		: 69.7

		For Surface Data
Pressure mb	: 1015.5
Temp C		: 29.6
RH%		: 76.7
Wind Spd m/s	: 2.6
Wind Dir deg	: 144

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Heavy rain and thunder shortly after dawn with a lot of 	standing water on local roads. Overcast skies with continuous propogation of small scale cumulonimbus clouds over the gulf.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 37.0
Termination Altitude km	: 22.7
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: 7/8 oktas sky cover with stratus and scattered low level cumulus.

For Surface Data
		Pressure mb	: 1015.2
     		Temp C		: 33.06
		RH %		: 57.984
		Wspd m/s 	: 5.7748
		Wdir deg	: 179.68
------------------------------------------------------------------------------
COMMENTS (10 second PTH and altitude data did not update on this launch like the previous two launches.)
--------



























61: SOUNDING, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 10:48:02 GMT, Sounding Bahia Kino 14 July 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #:408401314

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.92
Temp C		: 26.86
RH %		: 73.4

		For Surface Data
Pressure mb	: 1013.0
Temp C		: 27.1
RH%		: 72.2
Wind Spd m/s	: 3.8
Wind Dir deg	: 73

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 41.0
Termination Altitude km	: 21.996
Reason for Termination	: balloon burst

Post-Termination Weather Description: 
Strato Cumulus in all directions and above, small cumulus towers to the WSW, sky coverage approximately 5/8.

For Surface Data
		Pressure mb	: 1013.8
     		Temp C		: 26.523
		RH %		: 74.92
		Wspd m/s 	: 1.8777
		Wdir deg	: 22.561
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
10 second data not updating- raw data coming in,sounding looks okay.


























60: SOUNDING, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 04:52:54 GMT, Sounding Bahia Kino 14 July, 06Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 06Z
Sonde coef tape #:408403610

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1011.84
Temp C		: 29.09
RH %		: 82.7

		For Surface Data
Pressure mb	: 1012.6
Temp C		: 29.1
RH%		: 79.3
Wind Spd m/s	: 1.9
Wind Dir deg	: 163

Pre-Launch		Note conditions not observable by automatic systems
Weather Description: Lightning to the East	

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 43.9
Termination Altitude km	: 21.6
Reason for Termination	: Balloon go boom.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

The 10 second data was not updating, frozen on the same numbers throughout the 
whole sounding. Raw data coming in fine, sounding looked fine.

























59: DAILY, Site ISS3 (Bahia Kino), Wed 14-Jul-2004 02:00:54 GMT, Daily report for July 14
Current weather:
Large cumulus towers on the horizon to the east, evidence of convection- degraded towers, cirrostratus, stratocumulus to the north. The cloud cover has cleared some since this morning to approximately 1/8 sky coverage. Cooler ambient temps as well as water temps- waves are up in Bahia Kino.The easterly winds from this morning have moved through the south to the west and have incresed in speed to 6 m/s.

Computers, profiler, RASS and surface tower functioning as expected.

On 6th Helium tank.

2 bad sondes so far- third repaired.

Profiler disk write: 43.8%

During the 06Z and 12Z soundings the 10 second data was not updating, the raw met data was comming in fine, and the sounding looked fine.


















58: DAILY, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 22:54:03 GMT, Daily report for Power-up 23z 7/13
Power-up went well.  Tested voltage in trailer at 135.4v, which is up from previous measurements.

 Brad
















57: SOUNDING, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 22:41:07 GMT, Sounding Bahia Kino 14 July, 00Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 00Z
Sonde coef tape #:408401213

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.5
Temp C		: 31.7
RH %		: 58.1

		For Surface Data
Pressure mb	: 1009.7
Temp C		: 32.024
RH%		: 61.29
Wind Spd m/s	: 4.313
Wind Dir deg	: 215

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Scattered cirrus and altocumulus/stratus

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 34.1
Termination altitude km : 23.327
Reason for Termination	: Ballon burst

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1010.1
     		Temp C		: 31.31
		RH %		: 66.159
		Wspd m/s 	: 3.34
		Wdir deg	: 205
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




























56: SOUNDING, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 17:01:46 GMT, Sounding Bahia Kino 13 July, 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 18z
Sonde coef tape #:408401001

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.6
Temp C		: 30.8
RH %		: 62.1

		For Surface Data
Pressure mb	: 1012.6
Temp C		: 30.868
RH%		: 63.741
Wind Spd m/s	: 6.139
Wind Dir deg	: 149.81

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Overcast with slight showers.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 40.7
Termination Altitude km	: 22.124
Reason for Termination	: Balloon Burst.

Post-Termination Weather Description: Overcast.

For Surface Data
		Pressure mb	: 1012.5
     		Temp C		: 31.823
		RH %		: 59.568
		Wspd m/s 	: 4.0272
		Wdir deg	: 150.81
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

























55: SOUNDING, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 10:43:38 GMT, Sounding Bahia Kino 13 July, 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408413403

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.57
Temp C		: 29.27
RH %		: 78.9

		For Surface Data
Pressure mb	: 1010.5
Temp C		: 29.4
RH%		: 77.8
Wind Spd m/s	: 5.5 
Wind Dir deg	: 136

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies with strong surface winds from the east.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 45.6
Termination Altitude km	: 21.343
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Strato cumulus in all directions with some overhead, approx. 2/8-3/8 sky coverage.

For Surface Data
		Pressure mb	: 1011.1
     		Temp C		: 27.411
		RH %		: 69.743
		Wspd m/s 	: 6.5931
		Wdir deg	: 120.53
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------


































54: SOUNDING, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 04:39:02 GMT, Sounding Bahia Kino 13 July, 6z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408403605

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.12
Temp C		: 30.66
RH %		: 75.6

		For Surface Data
Pressure mb	: 1008.9
Temp C		: 30.6
RH%		: 77.2
Wind Spd m/s	: 3.0
Wind Dir deg	: 119

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skies.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 69.1
Termination Altitude km	: 18.6
Reason for Termination	: Lost signal

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1009.4
     		Temp C		: 30.326
		RH %		: 79.932
		Wspd m/s 	: 3.9847
		Wdir deg	: 141.45
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------































53: DAILY, Site ISS3 (Bahia Kino), Tue 13-Jul-2004 01:22:26 GMT, Daily report for July 13
Current weather:
The cumulus towers to the north have degraded as the day has progressed and now appear mostly as cirrus and stratus along the horizon- some cumulus in the NE. Last night during the July 11 06Z sounding experienced periods of heavy rain. It was not raining when we launched the sounding or left the site. 

Computers, profiler, RASS and surface tower functioning as expected.

On 5th Helium tank.

3 bad sondes so far- one can be repaired.

Profiler disk write: 40.4%

















52: SOUNDING, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 22:49:55 GMT, Sounding Bahia Kino 13 July, 00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 00Z
Sonde coef tape #: 408403709

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.57
Temp C		: 33.85
RH %		: 56.3

		For Surface Data
Pressure mb	: 1006.7
Temp C		: 34.2
RH%		: 54.9
Wind Spd m/s	: 6.2
Wind Dir deg	: 195

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear overhead; some towers on horizon, E, N, and SW

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 88.4
Termination Altitude km	: 17.4
Reason for Termination	: Signal Loss

Post-Termination Weather Description: Outlying towering-Q clearing/fizzling. Humidity rising due to rain last night.

For Surface Data
		Pressure mb	: 1005.9
     		Temp C		: 32.57
		RH %		: 64.4
		Wspd m/s 	: 8.47
		Wdir deg	: 194.1
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------




























51: SURFACE, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 22:47:54 GMT, Measured CLASS pre-amp voltages
As a baseline to compare with Los Moches, 
we measured voltages at the CLASS antenna tower:
  Input VOC: 12.4
  Voltage at pre-amp: 7.3
  DC current: 25mA







50: SOFTWARE, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 22:24:28 GMT, LIST OF BACKUP DISKS
Please add to this log as DVD's are written.

ISS3 WORKSTATION BACKUPS

KINO ISS3 System Backup: 12-July-2004 : Created a system image (backup) no data option using /iss/scripts/backup (Charlie)
 
KINO ISS3 Data Backup: 12-July-2004 : Created a data backup, 02-12 July-2004.
Includes SPC files through Day 193 (11-July). Taking back to Boulder.

KINO ISS3 Data Backup: 18-July-2004 : Created a data backup. Includes SPC
files through Day 199. Taking back to Boulder.

PROFILER BACKUPS

NAME_KIN01: D04186-D04195 (July 4-13)   created 7/18/04
NAME_KIN02: D04196-D04199 (July 14-17)  created 7/18/04

49: INFO, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 19:38:32 GMT, Roving team notes
Steve, John, Charlie at Kino today. Hal flew home this morning.

We got to meet Jennifer and Brad. Sounding from here look very good.
They note a couple of times losing signal when the sonde travels far
to the SSE. No big obstructions in thtat direction.

We had an impressive lightning show at the Hermosillo hotel last
night, from about 9-9:45pm (4-4:45Z). The storm was moving East to West.

The Bahia Kino soap plots show rain aloft approx. 5:45-7:00Z and another
brief shower around 8:30Z.

Rain gauge shows rain at the surface: 0.4 mm near 6Z and another 0.1 mm near 7Z.
No tips around 8:30Z.

Profiler POP consensus winds look good, despite some bird clutter in the
individual dwells. Nice match of low winds with surface tower.

We added tie-downs to the rain gauge.
Checked profiler level: ok. In fact about as level as can be.




48: SURFACE, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 19:35:29 GMT, Confirmed PYG wiring; matches Puerto Penasco
We checked the cabling on the PYG. Matches the notes from Puerto Penasco.
Data gap for a few of minutes, approx. 1916-1923 and again 1928-1933Z.
Dc on photopile 5H-5L ~.3mV on meter....ie no resolution to read.








47: SOUNDING, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 16:49:39 GMT, Sounding Bahia Kino 12 July, 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408413201

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.1
Temp C		: 33.4
RH %		: 60.2

		For Surface Data
Pressure mb	: 1009.3
Temp C		: 33.657
RH%		: 62.209
Wind Spd m/s	: 3.3967
Wind Dir deg	: 218.05

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Mostly cloudy.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 44.8
Termination Altitude km	: 21.534
Reason for Termination	: Balloon burst

Post-Termination Weather Description: Same as above. Humidity rising due to rain last night.

For Surface Data
		Pressure mb	: 1009.3
     		Temp C		: 33.558
		RH %		: 59.181
		Wspd m/s 	: 5.1738
		Wdir deg	: 212.72
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

























46: SOUNDING, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 10:46:16 GMT, Sounding Bahia Kino 12 July, 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408412409

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.86
Temp C		: 29.09
RH %		: 81.2

		For Surface Data
Pressure mb	: 1006.7
Temp C		: 29.7
RH%		: 78.3
Wind Spd m/s	: 1.7
Wind Dir deg	: 86

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Overcast.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 47.7
Termination Altitude km	: 21
Reason for Termination	: balloon burst

Post-Termination Weather Description: Scattered clouds.

For Surface Data
		Pressure mb	: 1007.2
     		Temp C		: 27.385
		RH %		: 83.358
		Wspd m/s 	: 2.384
		Wdir deg	: 61.405
------------------------------------------------------------------------------
COMMENTS 
--------




























45: SOUNDING, Site ISS3 (Bahia Kino), Mon 12-Jul-2004 04:48:24 GMT, Sounding Bahia Kino 12 July, 6z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408413514

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.14
Temp C		: 31.63
RH %		: 65.2

		For Surface Data
Pressure mb	: 1006.6
Temp C		: 31.774
RH%		: 65.1
Wind Spd m/s	: 3.2
Wind Dir deg	: 258

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Great lightning show to immediate NE.  Clear around here

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 132.7
Termination Altitude km	: 15
Reason for Termination	: Lost transmission of MET data.

Post-Termination Weather Description: Thunderstorms and Rain.

For Surface Data
		Pressure mb	: 1008.3
     		Temp C		: 31.632
		RH %		: 60.496
		Wspd m/s 	: 4.2526
		Wdir deg	: 101.47
------------------------------------------------------------------------------
COMMENTS (We have our first precipitation in the form of a thunderstorm!  Trailer door is leaking and Charlie said we would look into repairing it in the morning. Volts tested in trailer at 134.2)
--------

























44: DAILY, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 23:02:56 GMT, Daily report for Sunday July 12
Current weather:
Large Cumulus tower with a well defined anvil and updraft region on the horizon to the North, closer than those observed previously at the 00Z launch. 

Computers, profiler, RASS and surface tower functioning as expected.

Profiler disk write: 36.6%














43: SOUNDING, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 22:35:21 GMT, Sounding Bahia Kino July 12th, 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 22:35
Sonde coef tape #: 408413208

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1004.11
Temp C		: 35.19
RH %		: 52.8

		For Surface Data
Pressure mb	:1005.5 
Temp C		: 34.8
RH%		: 54.7
Wind Spd m/s	: 5.4
Wind Dir deg	: 214

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Towering cumulus to the NNE.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 52.7
Termination Altitude km	: 20.614
Reason for Termination	: no longer receiving new data, lost signal

Post-Termination Weather Description: 
Cumulus tower to the north less organized, anvil top facing south, cumulus on 
the horizon NNE

For Surface Data
		Pressure mb	: 1004.6
     		Temp C		: 34.145
		RH %		: 56.549
		Wspd m/s 	: 5.7389
		Wdir deg	: 211.86
------------------------------------------------------------------------------
COMMENTS ()Lost winds around 80 mb, lost signal around 50 mb.
--------


































42: SOUNDING, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 10:44:36 GMT, Sounding Bahia Kino July 11th, 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 10:47
Sonde coef tape #: 408413202

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.05
Temp C		: 28.4
RH %		: 64.20

		For Surface Data
Pressure mb	: 1008.6
Temp C		: 28.4
RH%		: 73.4
Wind Spd m/s	: .3
Wind Dir deg	: 143

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear skys.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 58.1
Termination Altitude km	: 19.858
Reason for Termination	: Balloon burst.

Post-Termination Weather Description: Cirrus and stratus along the NE horizon.

For Surface Data
		Pressure mb	: 1009
     		Temp C		: 26.546
		RH %		: 67.229
		Wspd m/s 	: 1.9006
		Wdir deg	: 33.752
------------------------------------------------------------------------------
COMMENTS ()
--------






























41: DAILY, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 00:07:51 GMT, Daily report for Saturday July 11
Current weather:
Cumulus Towers on the horizon to the North around to the East.

Profiler disk write: 33.3%%

132.1 volts








40: DAILY, Site ISS3 (Bahia Kino), Sun 11-Jul-2004 00:03:27 GMT, Daily report for Saturday July 10
Current weather is cumulus towers and maris tail cirrus to the north.

Profiler disk write: 29.9%

133.8 volts







39: SOUNDING, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 22:38:54 GMT, Sounding Bahia Kino July 11th, 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408412402

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1003.86
Temp C		: 34.97
RH %		: 48.2

		For Surface Data
Pressure mb	: 1005.8
Temp C		: 34.2
RH%		: 50.8
Wind Spd m/s	: 6.7
Wind Dir deg	: 245

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	(Clear Skies all around with exception of developing cumulonimbus towers on the horizon from ESE to North.)

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 60.4
Termination Altitude km	: 19.8
Reason for Termination	: out of range

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1004.9
     		Temp C		: 34.921
		RH %		: 48.193
		Wspd m/s 	: 5.0513
		Wdir deg	: 258.67
------------------------------------------------------------------------------
COMMENTS (We were unable to retrieve raw met data from sonde #408413406 so we cancelled the flight.  On a side note, we had to terminate the flight rather than hitting the panic stop button so I don't know if a false D file was created and published to the site.  We will examine the website and see if we can find out.Ther is a false D file.)
--------

























38: SOUNDING, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 10:55:42 GMT, Sounding Bahia Kino Saturday July 10, 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #:408413510

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.21
Temp C		: 23.24
RH %		: 64.9

		For Surface Data
Pressure mb	: 1007.9
Temp C		: 26
RH%		: 79.4
Wind Spd m/s	: 1.5
Wind Dir deg	: 47 

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	All clear.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 54
Termination Altitude km	: 21
Reason for Termination	: Inconsistent Data

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1008.3
     		Temp C		: 24.434
		RH %		: 76.278
		Wspd m/s 	: 2.7303
		Wdir deg	: 6.3289
------------------------------------------------------------------------------
COMMENTS (Good Launch)
--------


























37: SOUNDING, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 04:46:33 GMT, Sounding Bahia Kino Saturday July 10 6z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
launch time UTC: 06Z
Sonde coef tape #:408413209
------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.91
Temp C		: 29.52
RH %		: 76.60

		For Surface Data
Pressure mb	:1007.6 
Temp C		: 29.9
RH%		: 65.4
Wind Spd m/s	: 4.6 
Wind Dir deg	: 245

Pre-Launch		Note conditions not observable by automatic systems
Weather Description
Lightening to the ENE.	

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 43.9
Termination Altitude km	: 21.630
Reason for Termination	: balloon burst

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1007.6
     		Temp C		: 29.943
		RH %		: 65.236
		Wspd m/s 	: 3.4767
		Wdir deg	: 247.26
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Lightening to the north.
























36: SOUNDING, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 04:43:24 GMT, Sounding Bahia Kino Template
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name:
launch time UTC: 
Sonde coef tape #: 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 
Temp C		: 
RH %		: 

		For Surface Data
Pressure mb	: 
Temp C		: 
RH%		: 
Wind Spd m/s	: 
Wind Dir deg	: 

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 
Termination Altitude km	: 
Reason for Termination	: 

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------


























35: DAILY, Site ISS3 (Bahia Kino), Sat 10-Jul-2004 00:29:22 GMT, Daily report for Friday July 9
Current weather is cumulus towers and maris tail cirrus to the north.

Profiler disk write: 29.9%

133.8 volts




34: SOFTWARE, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 23:48:26 GMT, tklog fixed at Los Mochis
Remotely fixed the tklog at Los Mochis. The log file had gottent corrupted, so I replaced it with the .auto file. They only lost one partial log entry.
33: SURFACE, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 18:23:22 GMT, IR Radiation Sensor Tests
Replaced the PYG at Kinoat about 1600 Z with the PYG from Los Mochis to test the Los Mochis sensor, it seems to work both without a battery and with a battery, the battery seems to reduce the output by about 10 to 20 Watts. I have returned the Kino Bay PYG to its stand.  John Millitzer should pick up the Los Mochis Pyg at Kino to return to Los Mochis.  John should check the wiring at Los Mochis especially the pins in the connectors.

Hal 
32: SOUNDING, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 16:25:55 GMT, Sounding Bahia Kino Friday July 9th 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040709
launch time UTC: 18z
Sonde coef tape #:408413409

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.7
Temp C		: 32.12
RH %		: 48.1

		For Surface Data
Pressure mb	:1009.8 
Temp C		: 31.4
RH%		: 53.2
Wind Spd m/s	: 2.5
Wind Dir deg	: 173

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	(Partly cloudy with 4/8 coverage.)


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 49.1
Termination Altitude km	: 20.8
Reason for Termination	: Inconsistent Data

Post-Termination Weather Description: Cumulus to east but clear in Bahia Kino.

For Surface Data
		Pressure mb	: 1009.8
     		Temp C		: 32.49
		RH %		: 53.16
		Wspd m/s 	: 3.4228
		Wdir deg	: 215.27
------------------------------------------------------------------------------
COMMENTS (Good Launch.)
--------























31: SOUNDING, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 10:26:31 GMT, Sounding Bahia Kino Friday July 9th 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040709
launch time UTC: 12z
Sonde coef tape #:408413205

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.3
Temp C		: 25.9
RH %		: 84.70

		For Surface Data
Pressure mb	: 1008.1
Temp C		: 26.0
RH%		: 87.2
Wind Spd m/s	: 2.6
Wind Dir deg	: 9

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )
partially overcast

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 100.2
Termination Altitude km	: 16.4
Reason for Termination	: Loss of Data

Post-Termination Weather Description: Partly cloudy with mid-level cumulus approaching from SE.

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 26.5
		RH %		: 86
		Wspd m/s 	: 3.8
		Wdir deg	: 20
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------























30: SOUNDING, Site ISS3 (Bahia Kino), Fri 09-Jul-2004 04:36:58 GMT, Sounding Bahia Kino Friday July 9 6z launch
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040709
launch time UTC: 06Z
Sonde coef tape #:408413412

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.22
Temp C		: 27.7
RH %		: 75.7

		For Surface Data
Pressure mb	: 1008.5
Temp C		: 28.9
RH%		: 86.4
Wind Spd m/s	: 4.2
Wind Dir deg	: 229

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )
visibility clear, lightening and cumulus on the horizon to the ENE.

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 43.0
Termination Altitude km	: 23.6
Reason for Termination	: Balloon Burst

Post-Termination Weather Description: Same

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 28.641
		RH %		: 77.912
		Wspd m/s 	: 4.2313
		Wdir deg	: 198.38
------------------------------------------------------------------------------
COMMENTS (Good Launch.)
--------
























29: SOUNDING, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 22:22:40 GMT, Sounding Bahia Kino for Friday July 9 00Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040709
launch time UTC: 0z
Sonde coef tape #: 408401609

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.98
Temp C		: 31.97
RH %		: 72.1

		For Surface Data
Pressure mb	: 1007.9
Temp C		: 31.7
RH%		: 72.5
Wind Spd m/s	: 5.5
Wind Dir deg	: 226

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( See daily log for Thursday July 8th. )


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 50.3
Termination Altitude km	: 20.88
Reason for Termination	: Data too inconsistent to continue.

Post-Termination Weather Description: All clouds to south completely eroded.  Only remaining clouds are cirrus over Gulf and convective towers on the horizon both in the East as well as new convective initiation to the north.

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (We encountered a problem with sonde # 408413413 and cancelled it.  We never launched the sonde and restarted the GLASS program with the new sonde.  I don't know what the problem was with the transmission signal when trying to locate the new sonde but I ended up turning off the AFC on the computer screen, manually shifting the frequency down to 402.05 on the screen, and then tuning the sonde until I reached 99db and the highest level of reception.  At the current time we have no way to toggle the AFC and we are getting static interference but the db is still at 99 and locked on our frequency so everything is going okay for now.After 200mb we resolved this problem.)
--------

























28: DAILY, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 22:19:26 GMT, Daily report for Thursday, July 8
Atmosphere is beginning to change.  We had 7 to 8 oktas cloud cover today, almost overcast, for about 2 hours earlier this afternoon.  Cloud erosion is beginning to occur to the southeast but even more exciting is the appearance of a few convective towers including a cumulonimbus in the mature stage to the east near Hermosillo from our perspective.  Hopefully storms are not far behind.






27: SOUNDING, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 16:25:30 GMT, Sounding Bahia Kino for Thursday July 8 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040708
launch time UTC: 1705z
Sonde coef tape #: 408401404

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.16
Temp C		: 33.05
RH %		: 59.90

		For Surface Data
Pressure mb	: 1011.2 
Temp C		: 32.6
RH%		: 59.9
Wind Spd m/s	: 5.2
Wind Dir deg	: 159

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( Rather interesting scenario today.  Upper level cirrus are the same but some evidence of orographic lifting because of new cumulus field to our immediate northwest.  Very interesting.  Monsoon is nearing? )


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 26.9
Termination Altitude km	: 24.8
Reason for Termination	: Balloon burst

Post-Termination Weather Description: 

For Surface Data
		Pressure mb	: 1010.8
     		Temp C		: 32.171
		RH %		: 66.837
		Wspd m/s 	: 5.9545
		Wdir deg	: 195.95
------------------------------------------------------------------------------
COMMENTS (Data quality very good this launch.  Cumulus clouds still present in NW with increasing altocumulus/cirrus from the SE.  Good launch.)
--------























26: SOUNDING, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 10:30:20 GMT, Sounding Bahia Kino for Thurs. July 08 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040708
launch time UTC: 10:30
Sonde coef tape #: 408413206

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.95
Temp C		: 28.30
RH %		: 51.5

		For Surface Data
Pressure mb	: 1009.6
Temp C		: 28.3
RH%		: 52.3
Wind Spd m/s	: 2.1
Wind Dir deg	: 162

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	(Clear skies. Lightning can be see in the distance to the northeast.)


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 32.2
Termination Altitude km	: 22
Reason for Termination	: Balloon burst

Post-Termination Weather Description: Mix of cirrus, stratus, cumulus to the NNE,few alto stratus to South, visibility 1/8.

For Surface Data
		Pressure mb	: 1010
     		Temp C		: 26.726
		RH %		: 80.814
		Wspd m/s 	: 2.5131
		Wdir deg	: 80.176
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Panic stopped GLASS program in order to tune in new frequency- wasn't responding-worked fine on second attempt,straight line along the 345 degree radial out 2-3km right after start appeared on position graph, humidity sensor cover fell off as balloon was being released.






















25: SOUNDING, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 04:28:48 GMT, Sounding Bahia Kino for Thursday July 8 06Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040708
launch time UTC: 06Z
Sonde coef tape #:408403713

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.72
Temp C		: 29.19
RH %		: 89

		For Surface Data
Pressure mb	:1009.2 
Temp C		: 28.9
RH%		: 88.4
Wind Spd m/s	: 4.4
Wind Dir deg	: 223

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( Clear skies.)


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 34.9 mb
Termination Altitude km	: 23.071
Reason for Termination	: balloon burst

Post-Termination Weather Description: 

For Surface Data
		Pressure mb	: 1009.9
     		Temp C		: 28.962
		RH %		: 84.727
		Wspd m/s 	: 2.923
		Wdir deg	: 172.4
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

All is well, no problems.




















24: DAILY, Site ISS3 (Bahia Kino), Thu 08-Jul-2004 00:44:56 GMT, Daily report for Wed. July 07
Atmospheric conditions are clear in our area with scattered cirrus to the south and a developing cumulus field to the SSW.  

Profiler disk at 23.0%





23: SOUNDING, Site ISS3 (Bahia Kino), Wed 07-Jul-2004 22:33:21 GMT, Sounding Bahia Kino for Wed. July 08 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: 
date yymmdd: 040708
launch time UTC: 00Z
Sonde coef tape #:408413214

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.04
Temp C		: 32.04
RH %		: 68.5

		For Surface Data
Pressure mb	: 1009.7
Temp C		: 31.908
RH%		: 69.296
Wind Spd m/s	: 7.1223
Wind Dir deg	: 215.22

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	(visibility clear, high cirrus to south and west.)


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 177.9
Termination Altitude km	: 13.198
Reason for Termination	: Quit recording data and lost signal.

Post-Termination Weather Description: High cirrus and cumulus to the south. Visibility still clear.

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 31.035
		RH %		: 73.484
		Wspd m/s 	: 3.9831
		Wdir deg	: 218.76
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Launch button not hit before balloon release by 2-4 minutes.
























22: SOUNDING, Site ISS3 (Bahia Kino), Wed 07-Jul-2004 16:15:36 GMT, Sounding Bahia Kino for Wed. July 07 18z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040707
launch time UTC: 1650
Sonde coef tape #: 408413515

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1013.3
Temp C		: 31.4
RH %		: 58

		For Surface Data
Pressure mb	: 1012
Temp C		: 32
RH%		: 55
Wind Spd m/s	: 4.4
Wind Dir deg	: 190

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( Partly cloudy with 4/8 oktas coverage cirrus deck. )


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 108.9
Termination Altitude km	: 16.1
Reason for Termination	: Out of Range

Post-Termination Weather Description: 

For Surface Data
		Pressure mb	: 1012.9
     		Temp C		: 31.768
		RH %		: 67.397
		Wspd m/s 	: 6.616
		Wdir deg	: 194.06
------------------------------------------------------------------------------
COMMENTS (10 Second update in GLASS malfunctioned at 2m AGL causing all meteorological data to be reported the same throughout flight.  1 second data worked fine.)
--------





















21: SOUNDING, Site ISS3 (Bahia Kino), Wed 07-Jul-2004 10:04:11 GMT, Sounding Bahia Kino for Wed. July 07 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040707
launch time UTC: 10:04
Sonde coef tape #: 408413408

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.29
Temp C		: 28.79
RH %		: 78.2

		For Surface Data
Pressure mb	: 1010.6
Temp C		: 28.8
RH%		: 76.9
Wind Spd m/s	: 3.9
Wind Dir deg	: 202

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( Not as humid as yesterday at this time. Clear skies and cirrus deck to the east. )


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 48.8
Termination Altitude km	: 20.7
Reason for Termination	: Out of range

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1011.1
     		Temp C		: 27.445
		RH %		: 87.567
		Wspd m/s 	: 2.7156
		Wdir deg	: 68.479
------------------------------------------------------------------------------
COMMENTS (Seems to be doing the same thing as yesterday. Once sonde gets to 100mb we seem to have transmission problems.)
--------





















20: SOUNDING, Site ISS3 (Bahia Kino), Tue 06-Jul-2004 22:14:35 GMT, Sounding Launch 00z July 7
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: bahia kino
date yymmdd: 040707
launch time UTC: 0z
Sonde coef tape #:408412407

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.88
Temp C		: 31.4
RH %		: 71.2

		For Surface Data
Pressure mb	: 1010.6 
Temp C		: 31.3
RH%		: 74.1
Wind Spd m/s	: 4.4
Wind Dir deg	: 224

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( Scattered cirrus on the horizon but clear in our area.Humidity similar to yesterday.   )


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 87.1
Termination Altitude km	: 17.3
Reason for Termination	: out of range at approx. 30km

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1009.2
     		Temp C		: 30.861
		RH %		: 72.58
		Wspd m/s 	: 5.7062
		Wdir deg	: 215.49
------------------------------------------------------------------------------
COMMENTS (Balloon appeared out of range because it passed the 30km diameter circle. All radio sonde data was offset 3km to East NE immediately after launch.)
--------
























19: DAILY, Site ISS3 (Bahia Kino), Tue 06-Jul-2004 22:13:42 GMT, Daily report for Tuesday July 6 Power Up
Power up went great, getting ready to launch.




18: DAILY, Site ISS3 (Bahia Kino), Tue 06-Jul-2004 13:07:28 GMT, Daily report for Tuesday July 6
There is a lot going on in Bahia Kino this morning.  Atmospheric conditions are clear in our area with scattered cirrus to the west and a developing cumulus field to the WSW.  

The power is going to be shut off soon for work on the electricity at the DICTUS site so we will do a complete shutdown just prior to avoid problems.  We will then post another report after power-up to report specific conditions of the atmosphere.




17: SOUNDING, Site ISS3 (Bahia Kino), Tue 06-Jul-2004 11:16:46 GMT, Sounding Launch 12z July 6
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: bahia kino
date yymmdd: 040706
launch time UTC: 1110Z
Sonde coef tape #:408413203

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.97
Temp C		: 26.41
RH %		: 81.20

		For Surface Data
Pressure mb	: 1011.9 
Temp C		: 26.5
RH%		: 82
Wind Spd m/s	: 1.3
Wind Dir deg	: 17

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( Minimal visibility due to darkness but very humid this morning. )


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 37.2
Termination Altitude km	: 22
Reason for Termination	: balloon burst

Post-Termination Weather Description: Just after sunrise and the west is mostly cloudy with cirrus cloud deck.  Seems to erode with adiabatic heating during themid-morning. East of site, all is clear, 0-1 oktas.

For Surface Data
		Pressure mb	: 1012
     		Temp C		: 24.236
		RH %		: 88.624
		Wspd m/s 	: 1.7879
		Wdir deg	: 29.864
------------------------------------------------------------------------------
COMMENTS (Good launch today, wind data throughout entire flight)
--------





















16: DAILY, Site ISS3 (Bahia Kino), Mon 05-Jul-2004 22:04:59 GMT, Daily report for Mon. July 5
Daily Report July 5

Equipment check okay.  Scattered cirrus around the area.  Humidity up today at 75%  Hal, Charlie, and Nick left today with sondes (420) for Los Mochis and Mike and Bill left for Puerto Penasco.  

Temperature at present is 35c with winds ssw at 6-7 m/s.






15: SOUNDING, Site UMBS, Mon 05-Jul-2004 22:03:04 GMT, Sounding Bahia Kino for Monday July 6 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040705
launch time UTC: 00Z
Sonde coef tape #:408401608

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.16
Temp C		: 32.05
RH %		: 68.20

		For Surface Data
Pressure mb	:1010.5 
Temp C		: 31.2
RH%		: 73.7
Wind Spd m/s	: 4.8 
Wind Dir deg	: 227

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	(1/8 to 2/8 sky cover,visibilty clear, haze in the 
			distance)


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 16.0
Termination Altitude km	: 28.25
Reason for Termination	: balloon burst

Post-Termination Weather Description: same as above

For Surface Data
		Pressure mb	: 1009
     		Temp C		: 30.293
		RH %		: 79.313
		Wspd m/s 	: 3.4959
		Wdir deg	: 232.81
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Lost signal/data between 128mb-95mb because telemetry reciever picked up Hermasillo sonde, manually corrected. Time balloon burst: 0037Z.






















14: RADAR, Site ISS3 (Bahia Kino), Mon 05-Jul-2004 03:27:30 GMT, Profiler settings
Bahi Kino ISS3 Profiler Settings:

                 #2 (low)   #3 (high)   #4 (RASS)
IPP (microsec)     60        110         20
PW (nanosec)      700       1700        400
CODE                4          2          0
 
NHTS               57         47         22
DELAY (ns)       2400       4900       1800
SPACE (ns)        700       1700        400
COH.AVG.           80         44         10
SPEC.AVG.          36         37         15
NPTS              128        128        128
 
SCALE (m/s)      17.1       16.9      409.6
DWELL (sec)        28         28          3 (actually about 15)
HEIGHT (km)      0.20       0.48       0.12
       (km)      6.07      12.21       1.26
IPP    (km)      8.43      15.83       2.68
PULSE   (m)       105        255         60
 
 
BEAMS     1 1 1 1 1 1 1 1 1     AZI   ZEN
yvert22   2           3         285     0
xvert21         2                15     0
y+W38       2                   285    21
y-E26             2     3       105    21
x+N25         2          3       15    21
x-S37               2           195    21
 
Wind consensus 30 minutes 55% Oblique 2m/s Vert 1.5 m/s
RASS consensus  5 minutes 55% 2m/s
 
RASS  Spectra 15C to 45C
      Source  10C to 50C
RASS is off from 4UT to 17UT because of nearby houses.
 
ICRA Averaging.  Spectra are being saved.
 
Consensus files are written via trailer network to data manager computer.
 
POP moments are transmitted via serial cable to data manager to generate SOAP plots.
 
Once per day (after 0Z) spectra are copied for data manager for archiving and NIMA processing.
 
The site is next to an estuary.  The water is fairly calm but does generate 
some clutter at times.  There are also trees, bushes, and power lines in the 
area, however the signals are relatively clean.

The profiler was situated such that the trailer partially blocks a main lobe 
directed towards the water.  The antenna was also orientated to put the 
diagonal nulls towards the sea.

Note that this system uses the RX/TX box and the computer from ISS2 because
of the repairs for the noise problem noted in a separate tklog entry.


13: DAILY, Site ISS3 (Bahia Kino), Mon 05-Jul-2004 02:09:28 GMT, Daily report for Sun July 4
Daily Report Sun July 4

Weather fine, brisk southerly, high approx 33C.  
Low clouds early, clearing during morning.
More humid today, there appears to be a weather change, is the monsoon coming?

Profiler working well, getting winds to 2 - 4 km, rass to about 700m.
Disk 14.1 % full.

Training sonde with the students at 23Z

Last day here for Hal & Charlie (who are going to Los Mochis) and Mike & Bill (to Peurto Penasco).



12: INFO, Site ISS3 (Bahia Kino), Mon 05-Jul-2004 00:45:38 GMT, training session
Conducting Bahia Kino training session. Initiated Power Off at approx 530 LST, repowered system at 545 LST...everything fine...


11: SOUNDING, Site ISS3 (Bahia Kino), Sun 04-Jul-2004 21:54:58 GMT, Sounding Bahia Kino Sun July 5 0Z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040704
launch time UTC: 
Sonde coef tape #:408413210

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.6
Temp C		: 31.46
RH %		: 66.3

		For Surface Data
Pressure mb	: 1008.9
Temp C		: 31.9
RH%		: 67.7
Wind Spd m/s	: 6.9
Wind Dir deg	: 209

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	Clear, few scattered cirrus, moderate winds. 
		          


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 77.8
Termination Altitude km	: 18
Reason for Termination	: balloon burst

Post-Termination Weather Description: Same as before

For Surface Data
		Pressure mb	: 1007.9
     		Temp C		: 30.139
		RH %		: 78.963
		Wspd m/s 	: 3.9243
		Wdir deg	: 236.53
------------------------------------------------------------------------------
COMMENTS Think that we got interference from Hermesillo 0Z radio sonde at about 325mb.
--------






















10: INFO, Site ISS3 (Bahia Kino), Sun 04-Jul-2004 21:49:02 GMT, training session
Conducting Bahia Kino training session.

9: RADAR, Site ISS3 (Bahia Kino), Sun 04-Jul-2004 04:41:26 GMT, Profiler repaired
Replacement parts arrived from Peurto Pensaco.

Replaced interface and rx/tx boxs which did not fix the problem.

Replaced computer and the noise went away, so the problem appears to be with
either the integrator card or the dsp card.

The system then had serious spectral spurs.
Tried increasing the delay and postblanking which helped, 
however this wiped out the lowest gates (< 200m) on RASS.

Replaced the new rx/tx with the original and the spurs went away.
Returned delay and blanking to original settings.

Profiler operating normally from about 4:20UT (July 4).

8: DAILY, Site ISS3 (Bahia Kino), Sun 04-Jul-2004 04:27:35 GMT, Daily report for Sat July 3
Daily Report Sat July 3

Weather fine, light SW seabreeze.  High approx 33C.  
Partly cloudy, cirrus.  Saw some nice mare's tail clouds.

Profiler - continued to suffer noise problem most of day,
however was repaired and is operating normally from about 0430 UT (July 4).
See separate entry.

Approx 600 sondes arrived today.   
Charlie, Heather and Jennifer took approx 140 sondes to meet Gordan and Rebecca
about half way to Peurto Penasco, who brought down profiler replacement parts.

Hal did a training sonde with Nick & Brad.






7: SOUNDING, Site ISS3 (Bahia Kino), Sat 03-Jul-2004 22:12:48 GMT, Sounding Launch 3 Jul 2215
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040703
launch time UTC: 2230
Sonde coef tape #: 408413414

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.88
Temp C		: 33.05
RH %		: 59.7

		For Surface Data
Pressure mb	: 1009.2
Temp C		: 31.699
RH%		: 62.554
Wind Spd m/s	: 6.2746
Wind Dir deg	: 196.38

Pre-Launch		4/8 oktas upper level cirrus coverage
Weather Description	Hot with increasing moisture in afternoon


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 110
Termination Altitude km	: 18
Reason for Termination	: Loss of Signal

Post-Termination Weather Description: 

For Surface Data
		Pressure mb	: 1008.31
     		Temp C		: 31.39
		RH %		: 64.418
		Wspd m/s 	: 4.2379
		Wdir deg	: 219.43
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Loss of wind data at 200mb.  Reason unknown, possibly interaction with jet stream.























6: DAILY, Site ISS3 (Bahia Kino), Sat 03-Jul-2004 01:27:20 GMT, Daily report for Fri July 2
Daily Report Fri July 2

Weather fine and clear, light SW seabreeze.  High approx 34C.  
Scattered high clouds gradually increasing this afternoon.


Profiler still has the intermittant internal noise problem.  
The problem seems to be either in the interface boxes or the integrator & dsp cards in the computer.  
Replacement computer and interface boxes have been shipped from Boulder.

The students went to Hermasillo to work on distributing the radiosondes.



5: SOFTWARE, Site ISS3 (Bahia Kino), Fri 02-Jul-2004 19:11:20 GMT, fixed ssh port forwarding
For some reason the port forwarding in Winroute for ssh stopped working.

I fooled around with it for a while without luck.

Finally fixed it by removing the entry in Winroute, and reentering.

I noticed that the orginal entry only had tcp slected. When I reenterd the values, I changed this to tcp/udp. I don't think that should have caused the problem, though.
4: DAILY, Site ISS3 (Bahia Kino), Fri 02-Jul-2004 01:46:13 GMT, Daily report for Thu July 1
Daily Report Thu July 1

Weather fine and clear, light SW seabreeze.  High approx 34C.

Temperature/RH fan replaced about 1730 UT.

Profiler moved about late morning to behind the trailer to get better shielding from clutter from the lagoon.

Profiler also seems to have an intermittant internal noise problem which is being worked on.

Bill and Mike arrived yesterday evening.  Lou, Tim, Rebecca, and Gordan moved on to Peurto Penasco. .


3: INFO, Site ISS3 (Bahia Kino), Tue 29-Jun-2004 23:56:20 GMT, Its Alive
ISS3 Kino Bay Is alive

2: SOUNDING, Site ISS3 (Bahia Kino), Tue 27-Jun-2000 13:01:25 GMT, Sounding Bahia Kino Saturday 10 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Bahia Kino
date yymmdd: 040710
launch time UTC: 0z
Sonde coef tape #:408412411

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.6
Temp C		: 32.1
RH %		: 57

		For Surface Data
Pressure mb	: 1007.1
Temp C		: 32.4
RH%		: 53.5
Wind Spd m/s	: 6.4
Wind Dir deg	: 214

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( Cumulus towers on the horizon to the north and maris tail cirrus to the north.)


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 120.9
Termination Altitude km	: 15.534
Reason for Termination	: No longer receiving data and no satalites.

Post-Termination Weather Description: Same as above.

For Surface Data
		Pressure mb	: 1006.2
     		Temp C		: 32.453
		RH %		: 52.283
		Wspd m/s 	: 5.1493
		Wdir deg	: 233.06
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------






















1: LOG, Site none, Tue 11-Apr-2000 15:53:29 GMT, Logbook created
initial log file /iss/home/iss/tklog.log created by USER iss