6: SURFACE, Site Irish Bend, Tue 20-Nov-2001 02:17:29 GMT, Surface met setup
No major problems during setup.
A relatively minor issue is the proximity to the road (Lake Creek Dr.).
The trailer had to be sited close to the road to keep on firm ground;
it's just north of the road which runs east-west.
The solar sensors were placed just 22 m from the road, about as
far back as possible and yet still not get shadows from the trailer
or the met. tower.
Hopefully mist, grime, or small stones from trucks won't be a problem.
Fortunately the road is very quiet, probably only couple of cars per hour.

Lou said some goats were sheep, & Gary learned to use power strips.