FLOSS01: Logbook Entries

FLOSS01: Eve Messages: 1 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
90 Mon 17-Dec-2001PAM Stn3 / sage site setupstn3militzer


90: Eve, Site stn3, Mon 17-Dec-2001 17:24:51 MST, PAM Stn3 / sage site setup
17Dec01
Station Set Up approx. 1km N. of base in Sagebrush.

4-component radiometer system from bare site moved to
this location looking down over a lovely specimin of a sage bush.


Q7		1.96m
CSAT #538	2.35m
	Level X(lateral)=-.015   Y(longitudinal)=-.005
	per electronic level mounted on boom
Krypton #1395
Serializer #6


Krypton installed on AM of 12/18 ~17z
Soil Sensors installed on AM of 12/18 ~17z
	Soil sensors not the best in frozen ground.
	Back-fill of ~1/2 of CS615 because unable to
	insert 'poker' far enough to match length of probles.
	Tsoil installed with minimal angle ending at 5cm.
	HFT, CS615 at 5cm.