Horizontal Array Configurations | |||||
sonic spacing (m) |
sonic heights (m, nominal) |
start (PDT) | end (PDT) | good wind dir (hr) |
hot films single/triple |
---|---|---|---|---|---|
0.5 m | 9.6, 10.6 | Mar 13 17:00 | Mar 22 11:40 | 56:25 | no |
0.5 m | 9.6, 10.6 | Mar 22 16:05 | Mar 23 15:05 | 3:50 | no |
0.5 m | 4.9, 5.9 | Mar 23 15:35 | Mar 27 14:40 | 43:05 | no |
0.5 m | 2.0, 3.0 | Mar 27 14:50 | Mar 31 10:00 | 11:40 | no |
1.72 m | 9.6, 10.6 | Mar 31 20:00 | Apr 4 10:55 | 35:55 | Apr 1 12:40 |
1.72 m | 4.9, 5.9 | Apr 4 17:15 | Apr 6 15:30 | 17:10 | yes |
1.72 m | 4.9, 5.9 | Apr 6 17:00 | Apr 8 14:30 | 29:30 | no |
1.72 m | 2.0, 3.0 | Apr 8 17:25 | Apr 15 12:30 | 30:55 | yes |
1.72 m | 9.6, 10.6 | Apr 15 17:10 | May 10 16:00 | 196:55 | no |
1.72 m | 9.6, 10.6 | May 10 18:30 | May 17 9:09 | 90:10 | 11 May 12:18 to 17 May 09:08 singles 140 hrs triples 74 hrs |
1.72 m | 4.9, 5.9 | May 17 13:47 | May 25 15:50 down 2hr 5/23 |
49:25 | 17 May 14:03 to 23 May 16:13 singles 127 hrs triples 138 hrs |
1.72 m | 2.0, 3.0 | May 25 19:05 | May 29 9:09 | 23:15 | singles >26? hrs triples 9? hrs |
0.5 m | 9.6, 10.6 | May 29 16:50 | June 2 9:10 | 57:20 | yes |
0.5 m | 4.9, 5.9 | June 2 10:15 | June 6 9:15 | 48:45 | yes |
0.5 m | 2.0, 3.0 | June 6 10:00 | June 11 7:30 | 41:35 | yes |
Nominal sonic heights are boom heights at crossbeam; actual sonic heights
are lower due to boom sag, but + 5cm for height of sonic above boom.
Good wind direction hours are determined from the medians of the
wind directions from the upper 9 sonics in each configuration.
Good direction hours are the sum of continuous periods of 20 minutes
or more with directions within ±30° of south.
Times in sixth column are start times for hot film data ingest if
different from column 3.
[an error occurred while processing this directive]
This page was prepared by the ISFF crew,
NCAR Earth Observing Laboratory, In-situ Sensing Facility