- 189: Hotwire, Site tower, Fri 29-Oct-1999 11:33:40 CDT, moving 10m boom
From 10:50-11:10, the 10m boom was raised so that I could remove the hotwire
(#69) at 10m. I had intended to go up to 40m as well, but winds were too
strong.
- 130: Hotwire, Site tower, Sun 17-Oct-1999 19:39:08 CDT, 20m hot wire installed this afternoon.
17 Oct
The 20m boom was raised this afternoon, Oct 17, at 13:13:30 CDT.
It was lowered at 13:23 CDT. At this time the hot wire was installed.
- 108: Hotwire, Site tower, Sat 16-Oct-1999 09:25:32 CDT, raising/lowering 40m boom
At 08:47 CDT, I raised the 40m boom to uninstall the #70 hot wire from the
intercomparison experiment last night with HRDL. By 08:53, it was back
down.
- 103: Hotwire, Site tower, Fri 15-Oct-1999 14:36:39 CDT, moving 40m boom
At 1337 CDT, I raised the 40m boom to mount a hotwire, #70. I lowered the
boom at 1342.
- 97: Hotwire, Site tower, Thu 14-Oct-1999 15:36:16 CDT, Raising 10m and 40m booms to remove hotwires
14:53:00 10m and 40m probes turned to standby in preparation for wx.
14:56:00 CDT raised the 40m boom to dismount the hotwire at 40m. Finished
at 15:01:00.
15:20:00 raised the 10m boom to dismount that hotwire; finished at 15:24:00.
- 94: Hotwire, Site tower, Wed 13-Oct-1999 16:45:06 CDT, hotwire replacement/look on 55-m tower (Lundquist)
13 October 1644: Julie raisesboom at 10 m on 55-m tower to replace 10 m hotwire sensor.Julie notes there are a lot of spider webs.Installed probe 69.
1650. 10 m boom is down.
1653: Julie reports tower vibration; feels like 0.5 Hz.
1701: Julie is pulling up 40 m boom.Lots of spiders.
1705: Julie installed probe 70 at 40 m.
170930: 40 m boom is down.