Preparation of REAL for the Pentagon:
26 April 2004: REAL is loaded on a truck and leaves for the Pentagon...
See
pic1
pic2
pic3
pic4
22 April 2004: Example of one of the first
30-degree wide sector scans
pointing NNW-NNE at a 20-degree elevation angle.
This image took about 30 seconds and 300 laser pulses to collect.
The bright red at the top of the image is at approximately 3 km range
and is the cloud base. The green vertical stripes in the image are
caused by trees blocking the beam very near the seatainer.
22 April 2004:
Our new
beam steering unit peering out of the tent.
21 April 2004:
We installed a
tent
over the beam steering unit so that we could continue developing
motor control software and test the system during precipiation over
the last few days before shipment.
20 April 2004:
DFS used a
forklift
to install the beam steering unit on top of the seatainer.