Lidar Lab Hall of Shame... the broken, burned and abused.
(Click on the thumbnails to see larger pics.)
Burned internal 2" mirror on 5 Aug. 03
Cracked Raman cell window. The result of pressing against an uneven surface.
Burned internal 2" mirror. The result of a tiny droplet of oil.
Burned Pockels cell from inside the Surelite. The result of "free-lasing".
Abused IR viewing card. The result of...